ML20040E713

From kanterella
Jump to navigation Jump to search
Forwards Steam Generator Tube Inservice Insp Rept for 1981 Refueling Outage
ML20040E713
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/27/1982
From: Graves R
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20040E714 List:
References
EN-82-014, EN-82-14, NUDOCS 8202050275
Download: ML20040E713 (1)


Text

..

x

'o

\\

CONNECTICUT YANKEE AT O M I C P O WII R COMPANY HADDAM NECK PLANT RR # 1, BOX 127E. EAST HAMPTON. CONN. 06424 Docket ?!o.

50-213 January 27, 1982 gg l,q EU-82-114

\\V g

\\

/b s

s

'~'3 3

Mr. Ronald Haynes, Director 7

Region I 2

FES d

h Office of Inspection and Enforcement t;c;g.,$chf 6

f a"7 : :.

U.S. Nuclear Regulatory Commission TW 631 Park Avenue, 19406

'$ ' m 8

1 King of Prussia, PA

/

(P y

Reference:

(1) Haddan Neck Plant Technical Specifications, Section 6.9.1.b.

Dear Mr. Haynes:

Haddan Neck Plant Stear Generator Tube Inspection Recort Reference (J) requires that the complete results of the stean generator tube inservice inspection be reported to the Commission within 90 days after completion of the inspection.

The results of the inspection are attached.

Very truly yours, l

[' {

d%

i Richard H. Graves Station Superintendent RHG:PWA/ sos Attachment ec: Director, Nuclear, Reactor Regulation, Washincton, D.C.

(2) a

f. ?

W 8202050275 820127 4'6 PDR ADCCK 05000213 1

0 PDR ht )

L