ML20040E711
| ML20040E711 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/05/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20040E712 | List: |
| References | |
| NUDOCS 8202050274 | |
| Download: ML20040E711 (2) | |
See also: IR 05000416/1981060
Text
.
..
.
.
.
..
_-
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _
..
s
JAN 0 5 1982
Mississippi Power and Light Company
ATTN:
Mr. N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject: Report Nosk416/8N0',and 50-417/81-25
This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of
this office on December 15-18, 1981, of activities authorized by NRC Construction
Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility and to the discus-
sion of our findings held with Mr. G. B. Rogers, Site Manager, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by t,he inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold irformation contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
$[%%o Q
Sincerely,
g
/s/
'
R. C. Lewis, Director
p
U s. ' l
d - [g 84A .b"
% ,/
Division of Resident and
'
pD
~
Reactor Project Inspection
,?
-
Enclosure:
.'x
v
See Page 2
N_f
8202050274 820105
(C[ $
PDR ADOCK 05000416
G
/ /_9_.
..__
-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.-
.'
IOO2
Mississippi Power and Light Company
2
Enclosure:
Inspection Report Nos. 50-416/81-60
,
and 50-417/81-25
cc w/ enc 1:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
-
RII
RII ,
RII
R
,I
,
TDGibbons:ht
TEConlon
MEMurphy
7+FSCantrell
CLewis
27'~751
-t2/ /61
--
12/ - /81
12/,f
15
12/q/811
/8
tlglgL
I '4 ^ *
/
\\
- _ -
_