ML20040E711

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/81-60 & 50-417/81-25 on 811215-18.No Noncompliance Noted
ML20040E711
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 01/05/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20040E712 List:
References
NUDOCS 8202050274
Download: ML20040E711 (2)


See also: IR 05000416/1981060

Text

.

..

.

.

.

..

_-

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _

..

s

JAN 0 5 1982

Mississippi Power and Light Company

ATTN:

Mr. N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

Subject: Report Nosk416/8N0',and 50-417/81-25

This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of

this office on December 15-18, 1981, of activities authorized by NRC Construction

Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility and to the discus-

sion of our findings held with Mr. G. B. Rogers, Site Manager, at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by t,he inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold irformation contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

$[%%o Q

Sincerely,

g

/s/

'

R. C. Lewis, Director

p

U s. ' l

d - [g 84A .b"

% ,/

Division of Resident and

'

pD

~

Reactor Project Inspection

,?

-

Enclosure:

.'x

v

See Page 2

N_f

8202050274 820105

(C[ $

PDR ADOCK 05000416

G

PDR

/ /_9_.

..__

-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.-

.'

IOO2

Mississippi Power and Light Company

2

Enclosure:

Inspection Report Nos. 50-416/81-60

,

and 50-417/81-25

cc w/ enc 1:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

-

RII

RII ,

RII

R

,I

,

TDGibbons:ht

TEConlon

MEMurphy

7+FSCantrell

CLewis

27'~751

-t2/ /61

--

12/ - /81

12/,f

15

12/q/811

/8

tlglgL

I '4 ^ *

/

\\

- _ -

_