ML20040E626

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/81-55 & 50-417/81-24 on 811207-11.No Noncompliance Noted
ML20040E626
Person / Time
Site: Grand Gulf  
Issue date: 01/07/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20040E627 List:
References
NUDOCS 8202050185
Download: ML20040E626 (2)


See also: IR 05000416/1981055

Text

.

-

w

p

l

-

o.

- , .

,

JAN 0 7198

'

m

e

s

/

g

N'.g

Mississippi Power and Light Company

elSO:

'v

ATTN:

Mr. N. L. Stampley

.

I.

'"

'

._

84 70 3

9 Tgan.O "

-Vice President of Production

P. 0.' Box 1640

2

'

Jackson, MS 39205

rd.A '

,/

9

A

Gentlemen:

C' %

~

'/a\\'-

Subject: Report Nos.k416/8

nd 50-417/81-24

'

This refers to the routine safety audit conducted by Mr. R. W. Wright and

others of this office on December 7-11, 1981 of the quality assurance program

for design, procurement, and construction of the Grand Gulf facility and

to the discussion of our preliminary findings held with Mr. J. P. McGaughy,

Assistant Vice President Nuclear Production, of your staff at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Insoection Report No. 50-416/81-55

and 50-417/81-24

cc w/ encl:

See Page 2

8202050185 820107

PDR ADOCK 05000416

G

PDR

6Of

.

.

.

JAN 0 71982

Mississippi Power and Light Company

2

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bec w/ enc 1:

NRC Resident Inspector

Document Management Branch

State of Mississippi

l

l

'[

&,II&bIY

& . ebW

R

R

RII

7

RI

'

{/ .

r

dright:ht

CMupright

.}*

CEMuyphy

R ewis

/ dh3

Y / SF

15') /5L

15'4/83

15/4 /8A

{ l/

Q

.

-

- -

-