Public Version of Revision 4 to Emergency Plan Implementing Procedure HNP-4825, Emergency Sampling of Primary Coolant.ML20040E346 |
Person / Time |
---|
Site: |
Hatch ![Southern Nuclear icon.png](/w/images/1/14/Southern_Nuclear_icon.png) |
---|
Issue date: |
01/15/1982 |
---|
From: |
GEORGIA POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20040E344 |
List: |
---|
References |
---|
HNP-4825-01, HNP-4825-1, NUDOCS 8202040214 |
Download: ML20040E346 (6) |
|
Similar Documents at Hatch |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212J2721999-10-0101 October 1999 Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20210A4041999-07-15015 July 1999 Ei Hatch Nuclear Plant Unit 1,Extended Power Uprate Startup Test Rept for Cycle 19 ML20204J6031999-03-19019 March 1999 Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15 ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20217A0861998-04-30030 April 1998 Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 181998-02-17017 February 1998 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% HL-5438, Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 141997-07-21021 July 1997 Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant HL-5192, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 171996-07-18018 July 1996 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20212C1491996-05-31031 May 1996 Stability Monitor ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100P1041996-03-0404 March 1996 Ei Hatch Nuclear Plant Unit 2 Power Uprate Startup Test Rept for Cycle 13 ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained 1999-07-29
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217A0861998-04-30030 April 1998 Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20106A6521992-02-29029 February 1992 Proposed Rev 3 to Ei Hatch Nuclear Plant Solid Radwaste PCP, Per GL 89-01 ML20106A6501992-02-0707 February 1992 Rev 7 to Ei Hatch Nuclear Plant ODCM, Reflecting Proposed Changes,Per GL 89-01 ML20056B3031990-08-0101 August 1990 Ei Hatch Nuclear Plant,Units 1 & 2 Inservice Insp Program Second 10-Yr Interval ML20149N1141988-01-0404 January 1988 Revised Second 10-Yr Interval Inservice Insp Program,1980 Edition of ASME Section XI W/Addenda Through Winter 1981 ML20211H5491987-02-20020 February 1987 IGSCC-Susceptible Primary Pressure Boundary Stainless Steel Piping & Components Insp/Mitigation Program, 1987 Maint/Refueling Outage ML20245B8301986-12-10010 December 1986 Rev 0 to SO-OPS-05-1286, Spent Fuel Pool Transfer Canal Gates ML20245B8171986-12-0505 December 1986 Rev 0 to SO-OPS-02-1286, Processing of Water from Yard Drains ML20245B8201986-12-0505 December 1986 Rev 0 to SO-OPS-01-1286, Radwaste Discharges. Supporting Documentation Encl ML20203L9291986-08-0101 August 1986 Rev 0 to Training Procedure 72TR-TRN-002-0S, License Requalification Training Program ML20137V9031985-12-0505 December 1985 Rev 1 to Emergency Implementing Procedure 62RP-RAD-009-05, Airborne Radioactivity Concentration Determination ML20076J1871985-11-0808 November 1985 Rev 2 to Technical Note 20684-EIH, Thermo-Lag 330 Fire Barrier Sys Installation Procedures Manual Prepared for Bechtel Power Corp for Georgia Power Co ML20076J1911985-11-0404 November 1985 Rev 1 to Technical Note 20684-EIH, Thermo-Lag 330 Fire Barrier Sys Installation Procedures Manual Prepared for Bechtel Power Corp,For Georgia Power Co ML20076J1961985-10-23023 October 1985 Rev 0 to Technical Note 20684-EIH, Thermo-Lag 330 Fire Barrier Sys Installation Procedures Manual Prepared for Bechtel Power Corp,For Georgia Power Co ML20135F3161985-08-26026 August 1985 Rev 1 to Emergency Operating Procedures Implementation Plan for Emergency Response Capability Project ML20132E5471985-08-23023 August 1985 Rev 0 to Engineering Svc Procedure 42EN-ENG-011-OS, Scram/ Transient Reporting ML20209F2391985-07-0101 July 1985 Recirculation,Rhr & Reactor Water Cleanup Sys Piping Weld Joint Insp/Mitigation Program for 1985 Maint/ Refueling Outage ML20128A0561985-06-25025 June 1985 Inservice Insp Program,1980 Edition of ASME Section XI W/Addenda Through Winter 1981 ML20126E8331985-06-11011 June 1985 Emergency Plan Implementing Procedures & Deleted Title Sheets,Including Procedures HNP-8007 Re Decontamination of Clothing & Hats & HNP-8004 Re Dosimetry Issuance & Tracking ML20116D4401985-04-23023 April 1985 Revised Emergency Procedures HNP-8109 Re Continuous Air Monitors Models AM-3D & AM-33-1,HNP-8122 Re Radiation Monitor Model RM-16 & HNP-8146 Re Rascal Portable Rate Meter-Scaler/Model PRS-1 Operation & Calibr ML20245B7911985-04-17017 April 1985 Rev 0 to 10AC-MGR-04-0, Deficiency Control Sys. Supporting Documentation Encl ML20107G1421985-02-15015 February 1985 Revised Emergency Implementing Procedures,Including Rev 3 to HNP-8161 Re Eberline Model PCM-1 Portable Monitor Operation & Calibr & Rev 2 to HNP-8036 Re Waste Classification & Manifest Reporting Resin Shipments ML20215F7371984-12-26026 December 1984 Rev 1 to Administrative Control Procedure 40AC-FPX01-0, Fire Protection Program. Portions of Procedures 34AB-OPS-056-1S & 34AB-OPS-056-2S Encl ML20101B0551984-12-17017 December 1984 Rev 5 to Emergency Plan Implementing Procedure HNP-8134, Whole Body Counter Sys ML20108E0921984-11-29029 November 1984 Rev 10 to Procedure Data Package HNP-1-3980-1, Kinemetrics SMA-3 ML20107H5701984-10-31031 October 1984 Detailed Control Room Design Review Program Plan ML20155C8961984-09-30030 September 1984 Rev 1 to Offsite Dose Calculation Manual ML20155C8841984-09-30030 September 1984 Rev 1 to Solid Radwaste Process Control Program ML20098G3401984-09-30030 September 1984 Offsite Dose Calculation Manual ML20098G3381984-09-30030 September 1984 Solid Radwaste Process Control Program ML20108E0741984-06-13013 June 1984 Rev 10 to Procedure HNP-1-3980-M, Seismic Instrumentation Functional Test & Calibr ML20084H4971984-05-0101 May 1984 Rev 0 to Procedures Generation Package for Emergency Operating Procedures,Including plant-specific Technical Guidelines for Units 1 & 2,plant-specific Writers Guide & Implementation Plan for Emergency Response Project ML20086U4131984-02-29029 February 1984 Vendor Equipment Technical Info Program, Per Generic Ltr 83-28,Section 2.2.2,final Draft ML20087N9101984-01-26026 January 1984 Public Version of Transmittal & Title Page to Deleted Emergency Plan Implementing Procedures,Including Procedure HNP-8031 Re Determination of Specific Activity of Spent Resin & Curie Contents of Liner & 840322 Memo ML20087M7911984-01-25025 January 1984 Public Version of Transmittal & Title Pages of Deleted Emergency Plan Implementing Procedures HNP-8019, Insp of Steel Radwaste Shipping Drums & HNP-8422, Handling & Loading of Chem-Nuclear Cask & 840322 Memo ML20087M9321984-01-20020 January 1984 Public Version of Rev 7 to Emergency Plan Implementing Procedure HNP-8101, Teletector Model 6112B/D Operation & Calibr & Jm Felton 840322 Release Memo ML20081B6731984-01-18018 January 1984 Public Version of Rev 0 to Emergency Plan Implementing Procedure HNP-8161, Eberline Model PCM-1 Portal Monitor & Rev 17 to HNP-8008, Radiation Work Permit & Jm Felton 830307 Release Memo ML20087P0191984-01-13013 January 1984 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures HNP-8038 Re Waste Classification & Manifest Reporting & HNP-8042 Re Radiological Work Practices & 840326 Memo ML20079H9011983-12-0707 December 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures HNP-8035 Re Pulmonary Function Screening Program & HNP-8016 Re Shipment of Radioactive Matl ML20093D4881983-10-31031 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including HNP-4858, Naturally Occurring Phenomenon & HNP-8108, Pocket Dosimeter Use & Performance Test. W/831031 & 840709 Release Memo ML20108E0491983-10-28028 October 1983 Rev 4 to Procedure HNP-4858, Naturally Occurring Phenomenon ML20080L0651983-10-12012 October 1983 Rev 1 to Procedure HNP-4848, Determination of Extent of Core Damage Under Accident Conditions ML20081L9461983-10-12012 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures HNP-4827 Re Offsite Radiological Environ Monitoring During Emergencies & HNP-4852 Re Offsite Dose Estimation 1998-04-30
[Table view] |
Text
{{#Wiki_filter:_
-*w.- *ei- + e. s , , , ,
awe # Me At rw atut. w HNP-4U25 E. l. HATCH NUCLEAR PLANT c % w ..o. ~
4 (p/
g '
[gfc Georgia Power ca
~~
1 ,, e EMERGENCY SAMf' LING OF PRTMARY COOfANT A- EU3EOSE To provide a procedure for sampling primary coolant using the Je t Pump instrument rack as sample location for Units I and II.
Sampling will be done with the assumptions of a fuel cladding failure accident of the worse degree possible.
B. SAFETY
! Observe Radiation Protection Procedures.
C. PRECAllTIONG Due to the high dose rates and contamination levels which are to be expected with this kind of an accident, extreme care and good sampling techniques must be adhered to and followed.
Laboratory supervision shall be consulted on all activities associated with sampling and counting any material obtained,for post-accident analysis.
All attempts to get samples will be f'ollowed with the most restrictive H.P. practices. Constant H.P. monitoring will be provided and adhered to. A minimum of two persons will tie required while getting the sample.
b!OTE I At no time during sampling will personnol be allowed,to receive more than l'.25 R-unless a. Lab -
Supervisor, signs ECRd_,1 of
! HNP-8002, Authoritation'tn Exceed Administration Exnnsure Guides.
D. EGUIPMFNT
- 1. High range survey meter (PIC-GA, Teletector, or equivalent) 2
. Count rate in s t rdme'nt (E-120, or equivalentf-o I
.- - p gQ g.sW b g ,, a ".; ( , .., k, s ;
a 4 ; 33
'{
seete6eu7-esoas
, CF ~ASOeu nmnnnegg .
cc 8202040214 820201 PDR ADOCK 05000321 MANUAL SET F PDR
,yu - , , -- _:.-- y e--- , --- , , - , - ,
9 i ' ~ ~ *
*Mt Dut*t W 49'l*UVAL "NP - 4"'
~
.See Page 1 E.1. HATCH NUCLEAR PLANT om, w 4
vare g ~~
See Page 1 Georoia 0 Power a:A 2 of 6
- 3. High range dosimeter (ICR) and TLD's
- 4. Assorted poly bags and bottles
- 5. - Full PC's
- 6. Lead shield on wheels
- 7. Remote handling tools with various attachments
- 8. Se]F-contained breathing air (SCBA)
- 9. Finger ring T.L.D.'s
- 10. 75 m1 sample bomb
- 11. Remote sampling' equipment control panel
- 12. Key 1P33 P300 (For Unit 1 Control Box) or 2P33 P3OO (For Unit 2 Control Box) from " Remote Emergency Handling Tool" Box. .
- 13. Absorbant material to be used in case of spill.
NOTE The equipment referenced in Section D may not be adequate to perform the sampling requiremerrs.
All cons's de rati on s 'must be given though prior to actual sampling.
.A.R.M. read outs located in either
- controlfroom will be. read prior to entr.y int.o.the Reactor.Ruilding~. ' ?
f Dose rates will be taken while enroute to the sampling station.
Air samples will also be taken while getting samples.
While enrnute to the sampling
. station iE the,,whole body. dose g rate of 10 R/hr is exceeded, retreat (10 R/hr = 166.5 mr/ min). C'%m?MJ nt #'f 177f., :
ys 1:
E. LOCATTON IW' q, hf '
.. . C
%g' '
- "g1
_(j Unit _T_
Sample will be taken off the jet pump instrument rack located on the 130' elevation southside of the reactor building.
MANUAL SET
- - .-- ..- - , ~ .. _.. - . _ _ -_-___ __ _
* " "*""'*~~~,#-em e, ..,%,_
~ ~ ~ mm,, ~
E.1. HATCH NUCLEAR PLANT "** G S See.Page,1 n,s o w am 4 See Page 1 Georgia Power A, ~~
3 og 3 The temporary sampling system will be used until the permanent sampling system is installed and operable.
t@IE The control panels for the emer-gency sampling cystem(s) are located on the reactor building 164' elevation on the westside by the stairway.
Unit II Sample wil' be ta'. en o f f the j e'. pump instrument rack located on the 130' elevation northside of the reactor building.
NOTE The control panels for the emergency sampling system (s) are located on the reactor building-1G4' elevation on the westside by the stairway.
F. SAMPLING (PRESSURIZED VESSEL)
An R.W.P. will be initiated to get a sample. While sample is being gotten the dose' rates will be taken continuously on the sample bomb and other associated equipment.
- 1. Connections
' a. Place samp'Is homb- in . lead cat,k and place lead brick on -
shield to'p'.to make'a sealed cask.
- b. Open stem valves on sample bomb (outside of cask) two valves to be opened.
- c. Connect flex tubing to sample bomb (two connections to
- , be made outside the cask).
- 2. Flushing Through_Romb
- a. Open manual valve (1021 NO33C TVI for Unit 1 or 2021 1
NO33C TVI for Unit 2) on jet pump rack. The valves are painted red and are usually in the open position. Must
.. -check to make sure the valve is open.
\
- b. Open valve F306. (chiller water, demin) on control box.
Chiller water will return to CRW.
i
.,-.sm.mn'1:{]
- -{.
f j dM 3 m i u .:
_ . _ _ . _ _ _ . . _ _. . .._. _ ... __. __ __ . __ .2 [^ .7M
. .- P[UAL w,,1 SET ..
A*S HQv At eggA.g uyHL ggg HNP-4sas See.Page 1 E. I. HATCH NUCLEAR PLANT ,-
l uns 4 1 See Page 1 GeorpiaPower A ~~
0 4 of 6 -
- c. Open valves F3CO, F302, and F304 on control box and flush system for 10 minutes. Sample may now be taken.
- 3. Taking_gamnig
- a. Close valve F3OO, F302, and F304 on control box.
- b. Purge sample lines using dcmin water using Section H. ~
- c. Close manual valves on sample bomb (two valves to be closed) using remote handling tools if dose rates require it.
- d. . Disconnect flex tubing from sample bomb (two disconnections to be made).
NOTE-f Any water which may have been dripped when the disconnection was made must.be covered up or .
g cleaned up as soon as possible.
- e. After survey of the lead cask has been done, the samp]$
is returned to the lab or other area as required by Lab Supervisor to await shipment to an outside vendor for analysis.
J
. NOTE Upon the discretion of the Health Physicist and Lab Supervisor, the
~ '
' sample may-be analyzed in.the Hatch ;
. Lab if dose rates are low enough.
G. SAMPLTNG (DEPRESSURlZED VESSEL) 1 NOTE An R.W.P. will be initialed to ,s. ,
get a sample. While sample is '
bein.g gott.en, the dose. rates will '~ ,
be taken continuously on the sample . .
bomb and other associated equipment. '~ ' ~
j 1. Connections t
f a. ' Place sample bomb in lead cask and place lead brick on
(. shield top to make a sealed cask.
- b. Open stem valves on sample bomb. (outside of cask two valves to be opened) -
MANUAL SET
. - - - - . - - - . . - - - . - . - - - - - . _ _ - - . - . - . . - - . -= -. . - - . _
. 44-
,o m. o
""85 see.Page.1 E.1. HATCH NUCLEAR PLANT ...,,o 4
om See Page 1 Ogb Pour m -
3 og e
- c. Connect Flex tubing to sample bomb. (two connections to be made outside of case)
- 2. Flushing Through Rnmb_
- a. Open manual-valve (1021 NO33C TVI for tinit 1 or 2B21 NO33C TVI For Unit 2) on jet pump rack. The valves are painted red and are usually in the open position. Mut>t check to make sure the valve is open.
I b. Open valve'F30E. (chiller water), F3OO, F301, F302 and F304 on control panel. Flush system for 10 minutes, sample may now be taken.
-3. Taking Samglg
- a. Close valves F3OO, F301, F302, and F304 on control box.
- b. Purge sample lines with demin water using Section H.
- c. Close manual valves on sample bomb (two valves to be closed) using remote handling tool is required by' dose rate.
l
- d. Disconnect flex tubing from sample bomb (two disconnections to be made) l' LGIE
( .? ~
- l. Any water which may have been i dripped when the disconnection was made must be cleaned up or '
covered.as soon as'possible.
o . .
! e. After' survey of the lead cask has' been done, the~ sample and cask are returned to the lab or other area as required by Lab Supervisor to await shipment to an outside vendor for analysis.
NOTE n
Upon the discretion of the Health n ' s pc'"'" 7, 'q f;W"]VS 03 Ph'ysicist a'nd the Lab Gup'ervisor', i. C-
~ '
l: .
the sample may be analyzed in the tu*" . , .,
Hatch Lab if dose rates are low - '
/
7.'
.' enough. y ,ys 3 H. SyGTFM9 PLUGHTNG Systems will be flushed upon taking a sample to lower the dose rates in the local area. Flushing time will depend upon the MANUAL SET m.'_..-- - - - -_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _
7 ,
AMHQvAt 6 HULA DUML NO HNP-4829 See Page..4 E. I. HATCH NUCLEAR PLANT at,w. uu
,~ 4 uart 4-See Page 1 Georoia O Power m ~~
6 of 6 amount of crud stuck in the tubing lines and valves and dose rate in the area (Rackground).
- 1. Open valve F305, F301, and F303 and flush for 15 minutes or until Lab supervision specifies otherwise.
- 2. Close valves F301 and flush through pressure regulator for 30 minutes or until Iab Supervision specifies otherwise.
- 3. Close valve F305; this returns system to a ready-to-sample system.
NOTE Systems flushing (Section H above) may be used to demon-strate skills in sample taking.
NOTE Recommended route is through the *
- railroad airlock, around the.CSTs and in through T-16. .
t!OIE After obtaining the sample, refer
+ to HNP-4828 "Transferr.ing Primary
- i. Coolant from 75 ml Bomb" and 4 HNP-4829 " Analysis of Primary Coolant."