ML20040E161
| ML20040E161 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 01/27/1982 |
| From: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC |
| Shared Package | |
| ML20040E162 | List: |
| References | |
| GO3-82-089, GO3-82-89, NUDOCS 8202030197 | |
| Download: ML20040E161 (1) | |
Text
_
P N
Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428
^
Docket Numbers 50-508 and 50-509
.t i'
January 27, 1982 G03-82-089 i
Document Control Desk j
U. S. Nuclear Regulatory Commission I
Washington D. C.
20555
Subject:
PROJECT NG3. 3 AND 5 FINAL REPORT OF POTENTIAL 10CFR50.55(e)
CONCRETE PLACEMENT ABW 019 AND 21, 423.50 (D/N #35)
Attached is a copy of the Supply System response to Region V questions concerning the final 10CFR50.55(e) report for the 1
subject condition, o>
Should you have any questions or desire further informa on please contact me directly.
[, g n._
'Y WB 2 1992 u nz M"]lj*fkin
' a me:r y ;
i
,y c,
. Ledd 0)
/ -
.Y Program Director, WNP-3/5
\\n i~ T D a' DRC/tt Attachment e.c :
J. Adams -NESCO-WO/A D. Smithpeter-BPA-WO/A Ebasco-New York-WO/A gy7 L
WNP-3/5 Files-Richland-WO/A 3
e/
8202030197 820127 gDRADOCK 05000508 PDR c-
_ _ _ _ _ _ _ _. - _