ML20040E066

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revision 1 to Emergency Plan Implementing Procedure EPIP 360-1, Site Evacuation of Nonessential Personnel
ML20040E066
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/18/1982
From: Pliml G
COMMONWEALTH EDISON CO.
To: Harold Denton
NRC
Shared Package
ML20040E065 List:
References
A-82-11, NUDOCS 8202030061
Download: ML20040E066 (3)


Text

i CR #

A-82-11 EPIP 360-1 NOTIFICATICN CF FROGCURE CH5NGE

~

0 So -S Y Mr/Ms t yth )

Scok #(s) 95~- W 4"\\

ACP - A::nc::al Ccerating P ccedures ECP Emergency Cperating P cecures A

EPIP - Emergency Plan Imclementing P:ccecures FHI - Fuel Hancling Instructicns

. GCP General Cce:ating P:ccecures e

s.,

MI Maintenance Inst:u::1cns W

PT

- Pericdic Test P:ccedures RP Radiaticn Protection P ccedures EECElVED System Ocerating Instructicns r.)

SOI w

TSS Technical Staff Surveillances l.' i 'g. o e s.,cg }r a)

ZAP Zicn Administrative Prececures

~.

~V

' 4 'I~-D.?;.'! M *C3 ICP Zicn C'.emist y. Precedures gW*

ZED Zicn Electrical Distribution c,3 ANNU?CIATCR RESPCNSE PA'AJAL

/

~'

CURVE ECCK 4

FSAR - Final Safety Analysis Report D,'

ZION TECH SPECS - Tecnnical S;;ecificaticns Filinc Inst:Ucticns:

  • Please revise per attached changec to EPIP Index, pc.

1, 2

[_.

EPIP 360-1, pas. 1 thru 4.

Rev. 0 & l.

Jan. 18, 1982 Please acknowledge receipt of the above listed prececure(s), instructien(s) or revisien(s) by returning this receict letter to M. A. Le?sge, Zicn Station..

Signed Catie

.n.,. :

.l, :.

8.

~~

, s...

~.<.......J

.a.

.~~'. + : *. ;

.-t.

.... y. :s G. \\.C. *...... :

. - ~

~ -

.s i.

Q.'

. ~.

/

G. Plimi

[.

Asst Superintendent Zicn Staticn FCR CFFI C USE ONLY Receict Audit:,

ReceictsRec{uested

(

Cate Of Audit Receicts Not Received

,~

U All c:ccecure(s),1982instructien(s) er revisien(s) listed were distributed cn Jan. 18, in acccIdance with the Zicn Distributicn List.

/ M

$'f

. _ _ - =

} ' '22 ^.o ass a,<^^ T ",sevi H _

q

,,,,, w


1 T'202030061 820128 PDR ADOCK 05000295 F

PDR

.s

[

y.\\y 0 ZAP 5 514 STATION PROCEDURE CHANGE REQUEST I

"" o 6

0 pis 52 c.o Procedure intent changes require Station Revieve before using.

CHANGE Procedure changes with prior Station Renew do not need SRO approval.

REQUE,ST PROCEDURE TITLE I/W8V4dA7704/ 04 NUMBER 88/[3[0 M Al0 N -l,r~ KS Ws,/7?A 4. ?t.rtz.ss s/NWL.-

Permanent Change M

Expiration Date New Procedure O

Special Procedure O

Desired Effective gjj-g Permanent Change Needed Yes O No O Brief Description

$3fASl--lfW la"//ft"-4//*Pfd tJN $O WW3 Reason for change blfWh/Y $

Requested By #

MO#4/U" Date ?,/[/[2 Department

[

Temporary Change Approval (No intent change,14 days review)

Dept. Supetvisor Date SRO Date FORM S-514 Station Review Copy

_ _ ____,. - - _ _ ~. -. _ _.

Is a change to the Technical Specifications needed'?

, Yes No Is the probability of an occurrence or the consequence of an accident or malfunction of equipment important to saf ty as previously evaluated in the SAR increased?

Yes No V

B.causes hbb L Is the possibility for an accident or malfunction of a different type than any previously evaluated in the SAR created? Yes No P Because:

Is the margin of saf ty, as defined in the basis for any Technical Specification, reduced? Yes No X Because:

Date

[

Prepared By

- n

/

Temporary Review Perman_ent Review Signature

.Date

- 'Appr.

Not Appr.

Si ture Date ' Appr. Not Appr. -

~

D, Q'

fintf/-/Z-$7 W

=

Q kll$A1/ /Adez R D

D

. EM //Nb $

~U

/'

Station Superintendent:

].

If not approved, explain:

AN h Tf_M

/-/T-JL Station Superintendent Appr. Date Effective Date i

(Appr. for perm. use)

(if different from appr. date) i I

-.,,w<

w-.,

%w.

-+-


w--re*=..-

  • " - ~ - =* =

-.me.

y-e g m

~y---

~