ML20040E025

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/81-45 on 811208,14,15,17,18, 21-23, & 28-30.No Noncompliance Noted
ML20040E025
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 01/19/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20040E026 List:
References
NUDOCS 8202020499
Download: ML20040E025 (2)


See also: IR 05000373/1981045

Text

r

.

RfAN 19 $82

&

k

C

%

UCGlVEQ

9

p.

Docket No. 50-373

-

FEg j g02% g-

n

-

Commonwealth Edison Company

E

ATTN: .Mr. Cordell Reed

$tgm, s

Vice. President

k

  1. /

Post Office Box 767

71

p

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection' conducted.by Messrs. R. Lanksbury,

M. Ring and I. Jackiw of this office on December 8, 14,-15, 17, 18, 21-23, and

28-30, 1981, of activities at the LaSalle County Nuclear Station, Unit 1,

authorized by NRC Construction Permit No. CPPR-99 and to the discussion of our

findings with Messrs. R. Holyoak and R. Bishop and others of their staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination 01 prueedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that-you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office-to withhold such information.-

'If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that.

a new due date may be established. Consistent with Section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner-of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons ~which are the bases for the

claim that the information should be withheld from public disclosure. This

section'further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

8202020499 820119

4,

1-

DR ADOCK 05000 7

35o

_=

.

Commonwealth Edison Company

-2-

g 9 q m2

4

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

Inspection Report

No. 50-373/81-43

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

.,

Assurance Supervisor

!

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Hary Jo Murray, Office of

Assistant Attorney General

RIII

RIII

RIII

RIII

RIII

RIII /

RII

f

fikf

L,M/W

Lan$.

R%%

@77/~

VD

_' gs-

Rkmahn

&N

, ,

ksbury/so% Ring

Williams

Ma A

,

1/13/82

t[/MD

d6

'

_

___.

_

_

_ - _ -

_.

_.