ML20040E025
| ML20040E025 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 01/19/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20040E026 | List: |
| References | |
| NUDOCS 8202020499 | |
| Download: ML20040E025 (2) | |
See also: IR 05000373/1981045
Text
r
.
RfAN 19 $82
&
k
C
%
UCGlVEQ
9
p.
Docket No. 50-373
-
FEg j g02% g-
n
-
Commonwealth Edison Company
E
ATTN: .Mr. Cordell Reed
$tgm, s
Vice. President
k
- /
Post Office Box 767
71
p
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection' conducted.by Messrs. R. Lanksbury,
M. Ring and I. Jackiw of this office on December 8, 14,-15, 17, 18, 21-23, and
28-30, 1981, of activities at the LaSalle County Nuclear Station, Unit 1,
authorized by NRC Construction Permit No. CPPR-99 and to the discussion of our
findings with Messrs. R. Holyoak and R. Bishop and others of their staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination 01 prueedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that-you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office-to withhold such information.-
'If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that.
a new due date may be established. Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner-of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons ~which are the bases for the
claim that the information should be withheld from public disclosure. This
section'further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
8202020499 820119
4,
1-
DR ADOCK 05000 7
35o
_=
.
Commonwealth Edison Company
-2-
g 9 q m2
4
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
Inspection Report
No. 50-373/81-43
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
.,
Assurance Supervisor
!
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Hary Jo Murray, Office of
Assistant Attorney General
RIII
RIII
RIII
RIII
RIII
RIII /
RII
f
fikf
L,M/W
Lan$.
R%%
@77/~
VD
_' gs-
Rkmahn
&N
, ,
ksbury/so% Ring
Williams
Ma A
,
1/13/82
t[/MD
d6
'
_
___.
_
_
_ - _ -
_.
_.