Forwards IE Insp Repts 50-373/82-01 & 50-374/82-01 on 820104-05.No Noncompliance Noted
ML20040E004
Person / Time
Site: LaSalle  
Issue date: 01/21/1982
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20040E005 List:
References
NUDOCS 8202020479
Download: ML20040E004 (2)


See also: IR 05000373/1982001

Text

_

,

-

.

January 21, 1982

/h

%

.y

Docket No. 50-373

9

o

' #e - ""

..

[j'

Docket No. 50-374

Commonwealth Edison Company

I

YEf3 Q ?

/

/

ATTN:

Mr. Cordell Reed

'\\

Vice President

\\

C

/f

Post Office Box 767

N

.

Chicago, IL 60690

fig t #>

Gentlemen:

This refers to the special pre-licensing inspection conducted by

Mr. M. P. Phillips of this office on January 4-5, 1982, of activities

at LaSalle County Station, Units 1 and 2, and to the discussion of our

findings with Mr. R. Holyoak and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFh 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

.

9202020479 820121

$DRADOCK0500o373

-

PDR

lb_ 8b

Si /

-

.

"J AN 2 1 tV2

Commonwealth Edison Company

-2-

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4).

The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

l

Sincerely,

!

' 66 C

/

<

J. A.

Iind,

frector

DivisionofEdergencyPreparedness

and Operational Support

Enclosure:

Inspection Report

No. 50-373/82-01 and

No. 50-374/82-01

cc w/ enc 1:

,

Louis 0. De1 George, Director

j

of Nuclear Licensing

j

L. J. Burke, Site

'

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RIII

RIII

RI I

RI y /

RII

\\&

Rehmar{itiC ,W

'

QPt lips /jp