s
f
'
Docket No. 50-341
ggg ;
i
The-Detroit Edison Company
FEgy
bO2
- -
ATTN:
Mr. Donald A. Wells
U
-
3
i
Manager, Quality Assurance
E
$-
2000 Second Avenue
{
Detroit, MI 48226
0)
J
i-
o,
i
Gentlemen:
1
This refers to the. routine safety inspection _ conducted by' Messrs.
B. H. Little and~P.. Byron of this. office on November 1-30, 1981, of.
-
l
activities at Enrico Fermi Nuclear Power Station, Unit 2, authorized
'
by NRC- Construction Permit No. CPPR-87 and to the discussion of our
i
findings with Mr. E. Griffin at the ;onclusion of the inspection.
The enclosed copy of our inspection report identifies areas-examined
-
i'
during the inspection. Within these areas, the inspection consisted'
i
of a selective examination of procedures and. representative records,
j_
observations, and interviews with personnel'.
No items of noncompliance with NRC requirements were identified during
{
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy-
of this letter and the enclosed inspection report will be placed'.in the
^
<
NRC's Public Document. Room.
If this report contains any information
.
that.you-(or your contractors) believe'to be exempt from disclosure under
?
10 CFR 9.5(a)(4), it'is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this. letter of your intention.
to. file a request for withholding; and (b) submit within twenty-five (25)
. days from the date of this letter.a written application.to this office
,
to withhold such information.
If your receipt of this letter has been
<
delayed such that less than seven (7) days are available for-your review,
,
please notify this office promptly so that a new due date may be estab-
l
11shed. Consistent with Section 2.790(b)(1),'any such application must
i
,
I
i
<
8202020191 820120
i.
'
-
(-
gDRADOCM 05000341
. _L.Eo /
\\ w
-
v
+
.
Detroit Edison Company
-2-
January 20, 1982
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into 'a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed .
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
"Offginal signed by R.L. Spessard"
R. L. Spessard, Director
Division of Resident and
Project Inspection-
Enclosure:
Inspection
Report No. 50-341/81-18
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Eugene B. Thomas, Jr.,
Attorney
liarry H. Voight, Attorney
'
'
RI
RIII
RI
,,
, )
@
n
n/jp
St &bter
Sp s ard
15/82
1/;uS
(f