Forwards IE Insp Rept 50-341/81-18 on 811101-30. No Noncompliance Noted
ML20040D725
Person / Time
Site: Fermi 
Issue date: 01/20/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML20040D726 List:
References
NUDOCS 8202020191
Download: ML20040D725 (2)


See also: IR 05000341/1981018

Text

. -

. - - . - - -

_ .

. . . . - - - . ....

. _ .

. -

-.

5

.

p

.

s

~

9)gy 'g g ggg

'

4

g EQ /

g

9

&

i'

.

s

f

'

Docket No. 50-341

ggg ;

i

The-Detroit Edison Company

FEgy

bO2

- -

ATTN:

Mr. Donald A. Wells

U

-

3

i

Manager, Quality Assurance

E

$-

2000 Second Avenue

{

Detroit, MI 48226

0)

J

i-

o,

i

Gentlemen:

1

This refers to the. routine safety inspection _ conducted by' Messrs.

B. H. Little and~P.. Byron of this. office on November 1-30, 1981, of.

-

l

activities at Enrico Fermi Nuclear Power Station, Unit 2, authorized

'

by NRC- Construction Permit No. CPPR-87 and to the discussion of our

i

findings with Mr. E. Griffin at the ;onclusion of the inspection.

The enclosed copy of our inspection report identifies areas-examined

-

i'

during the inspection. Within these areas, the inspection consisted'

i

of a selective examination of procedures and. representative records,

j_

observations, and interviews with personnel'.

No items of noncompliance with NRC requirements were identified during

{

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy-

of this letter and the enclosed inspection report will be placed'.in the

^

<

NRC's Public Document. Room.

If this report contains any information

.

that.you-(or your contractors) believe'to be exempt from disclosure under

?

10 CFR 9.5(a)(4), it'is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this. letter of your intention.

to. file a request for withholding; and (b) submit within twenty-five (25)

. days from the date of this letter.a written application.to this office

,

to withhold such information.

If your receipt of this letter has been

<

delayed such that less than seven (7) days are available for-your review,

,

please notify this office promptly so that a new due date may be estab-

l

11shed. Consistent with Section 2.790(b)(1),'any such application must

i

,

I

i

<

8202020191 820120

i.

'

-

(-

gDRADOCM 05000341

PDR

. _L.Eo /

\\ w

-

v

+

.

Detroit Edison Company

-2-

January 20, 1982

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into 'a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed .

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

"Offginal signed by R.L. Spessard"

R. L. Spessard, Director

Division of Resident and

Project Inspection-

Enclosure:

Inspection

Report No. 50-341/81-18

cc w/ enc 1:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney

liarry H. Voight, Attorney

'

'

RI

RIII

RI

,,

, )

@

n

n/jp

St &bter

Sp s ard

15/82

1/;uS

(f