Text
_ _ ______ _______ _ _ _________________ - _
.
.
..
_
-
.
l
JAf: 21392
,
e
A
Docket No. 50-295
[
Docket No. 50-304
g
m
MC o,fgO
A
Q
Commonwealth Edison Company
Egg
,9
-
ATTN:
Mr. Cordell Reed
./ fo
7 tt.3(,, ffe
b'-
Vice President
Ai
m
Post Office Box 767
(4g%
-
Chicago, IL 60690
if
~
'
//
Gentlemen:
N
'
This refers to the routine safety inspection conducted by Mr. D. L. Robinson
of this office on December 28, 1981, and January 6, 1982, of activiites at
i
Zion Nuclear Power Station, Units 1 and 2, authorized by NRC Operating
}
Licenses No. DPR-39 and No. DPR-48 and to the discussion of our findings
-
with Mr. G. Pliml and others of his staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
.No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
-
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
8202020173 8
hDRADOCK05koh5
T
/G,j
'
_ - _
=
.
Commonwealth Edison Company
-2-
JAtl p y g
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not. hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
l'Origir.:I Sicr.ch Ly C.E. }'orclius"
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
Inspection
Report No. 50-295/81-30
and No. 50-304/81-28
cc w/ enc 1:
Louis 0. DelGeorge, Director
of Nuclear Licensing
K. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Hurray, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
RIII