l t=
DISTRIBUTION:
o KDocketTFile ~
@\\M@/'/
LB#2 File ~
DEisenhut/RPurple RTedesco Mcry 9 4
Docket MosP50-458' ASchwencer and 50-459 M _gB2.v e
RPerch
~
- T JStefano 6
N1.$$h8 i Licensing Assistant Mr. William J. Cahill, Jr.
Attorney, OELD
@f7$TDA>/h 01&E (3) 1 Senior Vice President
+
River Bend Nuclear Group bec: TE'tA Gulf States Utilities Company NSIC Post Office Box 2951 NRC PDR Beamont Texas 77704 Local PDR ACRS (16)
Dear Mr. Cahill:
SUBJECT:
ENVIRONMENTAL REVIEW 0F THE RIVER BEND SITE This is to formally advise you of our intent to conduct an environmental review of the River Bend Site, comencing at 9:00 AM on Tuesday, January 19, 1982, concluding on Friday, January 22, 1 982. The questions that will be raised by our Environmental Engineering and Site Analysis representatives during the review, as' well as the specific site features we wish to observe, were informally telecommunicated to Mr. E. reant on December 31,1981, and are reiterated in Attachments (1) and (2), respectively. In addition, our Hydrologic and Geotechnical staff representatives plan to discuss the seulement monitoring program. It is cordially reque,ted that Gulf States be prepared to respond to the questions to be raised, and that all necessary and required transportation modes be arranged for and scheduled to enable the site features identified to be observed.
We are in the process of contacting the following federal, state, and local agencies, requesting their participation in the review, and if possible, will attempt to identify to you individuals from those agencies who plan to participate, prior to the review start date:
Federal:
U.S. Environmental Protection Agency - Rc3 on VI. Dallas 1
U.S. Fish and Wildlife Service - Region IV. Atlanta l
U.S. Ariny Corps of Engineers - New Orleans District i
State of Louisiana:
Department of Natural Resources - Office of Environmental Affairs, Water Pollution Control Division Department of Wildlife and Fisheries 8201300340 820104 PDR ADOCK 05000458 A
PDR 1
^
f m
D L...:.L..B.#.2....N........
.D..L. :.L. B. #.2..
....* D..L..:.LB #...
o,nce>
suaurs > R..P..e..r.c..h..: k.w......
.J..S..t..e.f.a...no.
AS..c. hw e......e r 1.L1481.........U.'ll.B2......... 11.
1.82........
om, NRC FORM 318 (10 80) NRCM ONO OFFICIAL RECORD COPY USC.PON M960 2
r Mr. William J. Cahill, Jr. Local:
West Feliciana Parish Police Jury.
St. Francisv111e, LA Your assistance and cooperation in preparing and arranging for this environmental review will be most appreciated.
If there are any ques-tions or clarifications required concerning this request. please feel free to contact Mr. Robert Perch of my staff. He may be reached by telephone at (301) 492-8136.
Sincerely, A. Schwencer. Chief Licensing Branch No. 2 Division of Licensing Attachments:
1.
Questions to be Raised during review 2.
List of River Bend Site Features to be Observed cc: See next page a
.a...................
..~~-.aa
.am.
- a*aa~~.
'""aa"~~'-
- "a**"a"*
OFFICE)
EURNAME)
............~...aa-
. ana
.aa..-~~
. ""*a a a aa-a" "a aaa " a """*"*
.... ~..... -...
..-a-~~~
a
. ~ ~ ~ ~ ~ ~ ~ ~
-~~~~~~
oarE y OFFIClAL RECORD COPY usom inneaaj NRC FORM 318 f,1180) NRCA 02w
ATTACHMENT 1.
ENVIRONMENTAL ENGINEERING BRANCH
_5
~
100 - Miscellaneous E100.1 In addition to other requested infomation, provide a summary and brief discussion, in table fom, by section, of differences between currently projected environmental effects (including those that would degrade and those that would enhance environmental conditions) and the effect:; discussed in the environmental report submitted at the construction permit stage.
~
290 - Terrestrial Resources E290.1 Provide a brief listing or discussion of noise-sensitive land uses (2.9) within three miles of the River Bend Station (i.e., res-idences, schools, hospitals, churches, cemeteries).
Indicate their lecations with respect to the station and with respect to the ambient noise survey sampling locations.
.E290.2 Indicate the kinds of outdoor construction activities that were (2.9) ongoing' at the station during the 1980 sound leyel survey.
Indicate the extent to which any of the sample data may have been influenced by the construction activity.
E290.3 Indicate the meaning of and bases for the " assumed" values in Table (2.9) 2.9-3.
E290.4 Provide, if available, the daytime and nighttime L values for the 84 (2.9) 1980 sound level survey.
E290.5 Provide the bases or references for the sound power level data for (5.8) station equipment as presented in Table 5.8-3.
Indicate if field survey or utility sponsored study data for this infomation is available.
E290.6 References (p. 2.2-20).
Please provide tb staff with a copy of l
(2.2)
Reference 3, " Supplemental Environmental Ir.fr~omation Document,"
October 1979.
s E290.7 References are made to provisions of.the National Electrical Safety z,
(3.7.1)
Code (NESC), Clearances.
Please provide a description of the design (5.6.3) and operating measures being employed by GSU to reduce levels of
~
J y
. annoying shock due to electrostatic effects.
Include in this discussion procedures and dcsigns used to ground conducting objects such as metal fences in the vicinity of the transmitsion towers. Use of additional clearances (NESC, 232.B.I.) to reduce shock hazards may also be included in this discussion.
Also provide the predicted maximum electric field in kilovolts per meter (kV/m) at a one meter height and the predicted electric field (kV/m) at the edge of the right-of-way at.a one meter height.
291 - Aquatic Resources E291.1 Define the "yazoc channel" referred to in Section 2.3.1.1 for (2.3)
Alligator Bayou.
E291.2 Provide a copy of the U.S.G.S. Mississippi River Water Quality (2.3.3) report referred to in Section 2.3.3 (also given as reference 1 in Section 6.3).
Provide a copy of the Louisiana State University water quality study for waters in the site vicinity.
E291.3 Provide a summary, if available, of water quality information on (2.3.3) the surface waters in the site vicinity for the period 1977 to the present.
E291.4 Provide a discussion of the existing water quality stresses for-
.(2.3.3) the surface waters of the site.
E291.5 Indicate whether themal and/or chemical treatments will be used (3.4) in the backwash treatment of the intake structure.
E291.6 Provide a copy of NPDES permit LA0012731.
(3.6)
E291.7 Provide the basis for the estimates of corrosion / erosion products (3.6) given for the station cooling system (i.e., data in columns 5 and 6 of Table 3.6-3).
E291.8 Update the status of the plans and pennits for the treatment and (4.6) discharge or disposal for the preoperational cleaning and flushing waters for the station cooling systems.
E 291.9 Update the status of the assessment of the effects of and need (4.6) for_ mitigative or corrective action for erosion of the primary spoil area and sedimentation in the onsite wildlife management lake.
=
~
E 291.10 Estimate the frequency and duration t' hat station sanitary wastes (5.5) comprise all or most' (i.e., 50% or more) of the flow in Upper Grants Bayou.
' i E 291.11 Prov.ide a copy of reference 2 for Section 5.5.
(5.5)
Indicate whether the concentrations of iron and copper in the station discharge, as estimated in Table 5.5-3, are total or
. dissolved species.
If the values are for both fractions,-
. estimate and provide the bases therefore of the dissolved fractions of these metals that could reasonably be expected to, be in the discharge from the station.
E 291.12 Provide complete reference citing of the Draft Environmental (2.3.3)
Impact Statement for Big Cajun No. 2 - Unit 3.
E 291.13 References for Section 2.4 (p. 2.4-53).
Provide copies of (2.4)
References 37, 38 and 39 for ER Section 2.4 or, if previously submitted to NRC, provide date and other identifying infonna-tion regarding their submittals.
E 291.14 Section 4.3.2.1 Site and Vicinity / Aquatic Ecosystems (p. 4.3-12).
(4.3.2)
Provide status report on the " ongoing interim studies... of the impact of the River Access Road / culvert system...".
What is the planned completion date? What would be considered a "s4gnificant problem"?
9 4
4 op
/
l
.s e
.o SITING ANALYSIS' BRANCH E310 1.
Provide an estimate of the average annual number of workers (plant (5.8) employees and contractor employees) that will be required during' operation of Unit One.
E310.2.
Identify' the likely residential location (i.e., names of comunities.
.(5.8) counties) of the workers, by percent of total workers.
E310.3.
Identify any anticipated impacts cn the affected communities, (5.8) facilities and services (i.e., schools, hospitals, water and waste treatment, fire, police) that would result from the requirements of workers and their dependents.
List facilities and services that would require expansion or additions to capacity. Provide the same information for any direct demands of the River Bend Station on the community services.
E310.4.
Provide an estimate of the average annual workers payroll for Unit (5.8) 1 (give the year in which.the dollars are stated).
E310.5.
Provide an estimate of the average annual dollar amount of local (5.8) purchases of materials and supplies resulting-from the operation of Unit 1.
Include a definition of the local area in preparing the i
estimate (i.e., counties, major towns, SMSA). Give the year in which the dollars are state,d.
.s v.
j e
4 e
2-E3104.
In tabular form (see Table 5.8.5 in ER-OL and Tables 10.4-and 10.5 (5.8)
.in CP-FES), provide a dollar estimate of the taxes attributable to River Bend Station, Unit 1.
Provide the dollar estimates by type c' tax and by-taxing jurisdictions for the first five full years of operation after the end of the exemption period.
Estimate what percent of the jurisdictions total tax revenues are represented by the taxes attributable to the River Bend Station, Unit 1 (give the year in which the dollars are stated).
If taxes are paid in the exempt period, prepare a similar. table by type of tax and by taxing jurisdiction for the first five full years of operation of the exempt period (give the year.in which the dollars are stated).
1r E310 J.
The external appearance of the plant and plant layo.ut are discussed (2.1 )
in Section 3 of the CP-FES and depicted in Figure 2.1-3 in terms cf two units.
In light of the current status of Unit 2 which is not scheduled, provide a discussion, accompanied by a new site layout figure, which incorpo.ates Unit 1 physical structure and r
features and reflects any additions (i.e., Emergency Operations Facility), relocations, reorientations or other changes which have occurred since publications of the CP-FES.
E310.8 Identify any traffic congestion or interference with patterns (5.8) of local traffic anticipated to result from plant operation and
'~~
maintenance activities.
Discuss anticipated mea.sures that would be undertaken to alleviate such,possible situations.
s
e 3-E310.9.
Identify any impacts to cultural resources which could potentially (2.5) result from the operation and maintenance activities related to the plant and tiransmission lines.
E310.10. Refer to question 311.5 which requested that population data be pro-(2.5) vided in the English system of miles.
In addition, use the 1980 Census to update the projected population figures presented in Table 2.5-2, Tables 2.5-5 through Table 2.5-10, Tables 2.5-17 through Table 2.5-22.
Also, update Figures 2.5-4 through Figure 2.5-16.
Describe the methodology and assumptions used for updating.
S T r.
w-w w
e--
/
R3]ACHNENT 2
/*
RIVER BEND STATION SITE FEATURES TO BE OBSERVED BY ENVIRONMENTAL ENGINEERING BRANCH SITE VISIT ATTENDEES Terrestrial Resources
- Wildlife management' area Onsite spoil areas l
Incinerator and landfill areas onsite Aquatic Resources Station Intake and Discharge Structures and embayment
(
Access road crossing of Alligator Bayou Mississippi River shoreline area to be stabilized by Corps of Engineers Station cooling towers Makeup water pretreatment and pretreatment waste treatmen't facilities Sanitary waste treatment system and discharge area Site storm drain discharge areas to onsite waterbodies
- Wildlife management lake are'a
~
- Concrete wash water disposal area to Uppe.- West Creek Modified onsite ' surface waterbodies (i.e., channelized creek l
areas) 1 East Creek stilling basin
- Onsite erosion control measures 1 -
g S
e 4
/
s,
+
RIVER BEND SITE FEATURES TO BE OBSERVED BY HYDROLOGIC AND GEOTECHNICAL BRANCH SITE VISIT ATTENDEES West Creek Fabriform Channel Natural Channel Upstream and Downstream of Artificial Channel Drop Structure Rail Road Enbankment Weir Section Grants Bayou in the Vicinity of the Site Mississippi River Bankline and Makeup Water Intake Embayr.ent Alligator Bayou Area Roads Embankments v
- 's T
v.
m 4-