Forwards Request for Addl Info Re Seismic Qualification of Auxiliary Feedwater Sys.Encl Info Needed in Order to Complete Review of Licensee 810715 Response to Generic Ltr 81-14.Response within 30 Days Requested
ML20040D077
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/06/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To: Crouse R
TOLEDO EDISON CO.
References
GL-81-14, NUDOCS 8201300099
Download: ML20040D077 (3)


Text

,.

O Janua$ti,1982 DISTRIBUTI0ft:

TERA OELD Docket File f1 SIC AE0D flRC PDR ORB #4 Rdg IE-3 L PDR DEisenhut ACRS-10 Docket flo. 50-346 RIngram Gray File ADe Agazio H0rnstein EBlackwood A

KHerring f4r. Richard P. Crouse p

g Vice President, fluclear

~,

Toledo Edison Company

' %.if d

/

-S :

Edison Plaza - Stop 712 E

30011adison Avenue Op kp Toledo, Ohio 43652 3

Dear !!r. Crouse:

1;[-

SUBJECT:

SEISli1C QUALIFICATI0ft 0F Tile AUXILIARY FEE 0 HATER S 1-ADDITI0fiAL IllFOR!1ATI0ll REQUEST The July 15, 1981 response by Toledo Edison Company to fiRC Generic Letter flo. 81-14 has been reviewed, flowever, for the flRC to complete the review of the auxiliary feedwater system seismic qualification, the additional infonaation identified in the enclosure is necessary.

To allow for timely completion of this review, your response is required as soon as possible but no longer, thane 30 days from receipt of this request. This information request is covered by GA0 blanket clearance number R0072, expiration date flovember 30,1983, which was also aoplied to Generic Letter fio. 81-14.

Sincerely, 80nIGIr4L sIcar.a at J01m F. STOLZ."

John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Request for Additional Information cc w/ enclosure:

See next page ORB #4:DL C-

  1. 4:DL omer >

.A@,,.Ab.gg.

W...cb,,,@h,,,,,,,,,

t

<ue-e >

8 W 300099 B E 06

' ' ~ ~ ~ ' ' ' ' ' " " ' '

I PDR ADOCK 05000346 04rr >

P ppp NRC FORM 318 00-80) NRCM Ono OFFICIAL RECORD COPY usam mi--mm

i Toledo Edison Company ccw/ enclosure (s):

Mr. Donald H. Hauser, Esq.

U.S. Nuclear Regulatory Commission The Cleveland Electric Residen't Inspector's Office Illuminating Company 5503 N. State Route 2 P. O. Box 5000 Oak Harbor, Ohio 43449 Cleveland, Ohio 44101 Mrs. Julia Baldwin, Librarian Gerald Charnoff, Esq.

Governtrent Documents Collection Shaw, Pittman, Potts William Carlson Library and Trowbridge University of Toledo 1800 M Street, N.W.

2801 W. Bancroft Avenue Washington, D. C.

20036 Toledo, Ohio 43606 Paul M. Smart, Esq.

Fuller f2 Henry 300 liadison Avenue P. 0.- Box 2088 Regional Radiation Representative Toledo, Ohio 43603 EPA Region V Mr. Robert B. Borsum 230 South Dearborn Street Babcock & Wilcox Chicago, Illinois 60604 Nuclear Power Generation Division Suite 220, 7910 Woodmoat Avenue Bethesda, Maryland 20814 Ohio Department of Health ATTN:

Radiological Health Program Director P. O. Box 118 President, Board of County Columbus, Ohio 43216 Commissioners of Ottawa County Port Clinton, Ohio 43452 Attorney General Department of Attorney General 30 East Broad Street Columbus, Ohio 43215 l

Harold Kahn, Staff Scientist Power Siting Commission 361 East Broad Street i

Columbus, Ohio 43216 Mr. Ted Myers Manager, Nuclear Licensing i

l Toledo Edison Company Edison Plaza l

300 Madison Avenue Toledo, Ohio 43652 i

. =

Enclosure REQUEST FOR INFORMATION ON SEISMIC QUALIFICATION 0F THE AUXILIARY FEEDWATER SYSTEM

^

' Davis-Besse Nuclear P1anhUnit 1-Question 1: Clarify whether a walkdown was performed for the condensate storage tank (CST) and the portion of the' suction side >

p'iping fmm the CST to the entrance to the auxiliary buildi.ng, Question 2: Provide information on your scheduled completion date for:

a.

Modifications to the auxiliary feedwater (AFW). pump turbine (AFPT) pipe support.

b.

Reevaluation and any re'sultant modifications for compliance with IE Bulletin 80-11 for the' 29 concrete masonry unit block walls'.

Refemnce to your response to IE Bulletin No. 80-11 dated September 29,1981 where applicable is appropriate.

Please indicate walls /subwalls i

affecting the AFW system.

4 c.

Proposed redesign and rerouting of the AFPT exhaust piping.