Forwards IE Insp Repts 50-546/81-23 & 50-547/81-23 on 811208-10.No Noncompliance Noted
ML20040D037
Person / Time
Site: Marble Hill
Issue date: 01/18/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20040D038 List:
References
NUDOCS 8201290521
Download: ML20040D037 (2)


See also: IR 05000546/1981023

Text

,

,

!

JAN 181932

en

S \\ ;*

Q

. A) '

Docket No. 50-546

N

D

Docket No. 50-547

[j['

TECElVED

Public Service of Indiana

D,

' 3 Nb'* ; o

~

ATTN:

Mr. S. W. Shields

$> 9$l.]]O

Senior Vice President

Nuclear Division

I'/j&[g [/

~

TE

Post Office Box 190

.

,

New Washington, IN 47162

Gentlemen:

This refers to the special safety inspection conducted by Mr. F. C. Hawkins

of this office on December 8-10, 1981, of activities at Marble Hill Nuclear

Generating Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with

Mr. W. Petro and others of your staff a4 the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.700 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

^

8201290521 820118

i

)

PDR ADOCK 05000546

J-

G

,

PDR

s

i

.

Public Service of Indiana

-2-

78 7

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a coI.y of this letter and the enclosed

inspectior report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

t,,:;i,.;I C':n 3 by C .. I* I '

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Reports No. 50-546/81-23

and No. 50-547/81-23

cc w/ encl:

W. M. Petro, Executive Director

Nuclear Project Mana2ement

C. Kammerer, CA

J. H. Sniezek, IE

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of

Attorney General

John R. Galloway, Staff Director,

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley

Power Association

Thomas M. Dattilo, Save the Valley

RI(I A

R41)

RIII

RIII

RIII

A1

W

W

{

A

Hawkins/jp

li t1e

Warnick

Williams

i T>Q' us

6

.

12/31/81

yp

l t/-7 2.