Application to Amend License DPR-35,changing Tech Specs to Allow Integrated Leak Rate,Hydrostatic & Scram Time Testing. Amend Fee Encl
ML20040D006
Person / Time
Site: Pilgrim
Issue date: 01/21/1982
From: Howard J
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20040D007 List:
References
82-19, NUDOCS 8201290470
Download: ML20040D006 (5)


Text

i

    • w w

. l t

BOSTON EDISON COMPANY B00 BOYLSTON STREET BOSTON, MASSACHUSETTS O2199

.J. EDWARD HOWARD LO

  1. D

"*l2""" January 21, 1982 P 1 RECEtygg ,

BECo. Ltr. # 82-19 23 JAN 29 Jgggy {8  :

Proposed Change No. 82-2 53L$m Mr. Domenic B. Vassallo, Chief g g Operating Reactors Branch #2  ::

Division of Operating Reactors .

Office of Nuclear Reactor Regulation -

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 License No. DPR-35

, Docket No. 50-293 Proposed Change to Technical Specifications to allow Intergrated Leak Rate, Hydrostatic and Scram Time Testing.

Dear Sir:

, Introduction Pursuant to Section 50.90 of the Commission's Rules and Regulations, Boston Edison Company hereby proposes the following modification to Appendix A of Operating License No. DPR-35 l Proposed Change_

, The proposed change is applicable to the following Pilgrim Station Limiting Conditions for Operation.

3.7.B.1.a Standby Gas Treatment System (p.158) i 3.7.B.1.c Standby Gas Treatment System (p. 158) .

3.7.8.2.a Control P.aom High Efficiency Air Filtration System (p.158b) 3.7.B.2.c Control Room High Efficiency. Air Filtration System (p.158b)

.The proposed change consists of adding a footnote, applicable to each of the above Limiting Conditions of Operation which provides conditional relief from each LCO'from January 30, 1982 to startup.

a

( L t' F201290470 820121 - O h PDR ADOCK 05000293 l' \ ,

P PDR ,

1

F COETON EDlHON COMPANY Mr. Domenic B. Vassallo, Chief January 21, 1982 Page 2 Reason For Change and Safety Considerations Ongoing engineering analyses, performed in response to IE Bulletin #80-11

" Masonry Wall Design" have revealed that masonry walls 209.1, 67.1, 184.2/

188.4, 184.0/188.0, 65.19, and 196.0 will not retain their structural inte-grity following certain design basis events; High Energy Pipe Break Outside Containment. Tornado Depressurization and Seismic. Failure of these walls would impact certain safety systems which will be required to be operable during three tests to be conducted before startup. 'Ihese tests are: (1) the integrated leak rate test (ILRT), (2) primary startup hydrostatic test and (3) scram timing. The collective impact of.,the failure of these block-walls is outlined in matrix form on attachment A. Specific equipment failures are as follows:

Blockwalls/

Location Cause Safety Related Equipment Affected 209.1 T Loss of 125V DC "B" Battery EL.23.'0 (Turbine BLDG) Loss of 250V DC Battery 67.1 T Wall is part of Secondary EL.91.'3 (Reactor BLDG) containment 184.2/188.4 T Loss of power to HPCI Turbine Controls and Speed Signal EL.23.'0 thru 37.'0 Converter.

Auxiliary Bay 184.0/188.0 T Loss of power to control room High Efficiency air Filtration EL.23.'O thru 37.'0 Filtration System Filter Heater, Auxiliary Bay VCRF 101B.

65.19 Control RoomiVSF 103A "A" Supply Fan Pl.51.'0 (Reactor BLDG) T,5 Ventilation dFS-E-102 Flow Switch SBGTS VEX 210A "A" Side Supply Fan VGTF 201A "A" Filter heater Standby Liquid Control tank heater 196.0 T,5 Control Room Vcerf-101A. "A" filter heater Ventilation

4 COLTON EDGON COMPANY Mr. Domenic B. Vassallo, Chief January 21, 1982 Page 3 Blockwalls/

Location Cause Safety Related Equipment Affected EL.51.'O (East Wing) Standby Liquid Control Tank heater SBGTS - Train B Where T stands for a tornado depre:;:,uriation and S stanG for scismic.

Since the three tests will be prohibited during*: times when a tornado depressuriza-tion event is likely, i.e., when a Tornado Watch is issued by the U.S. Weather Service, then only walls 65.19 and 196.0 are of concern. The safety concerns.

raised by the failure of these walls are much less than those associated with failure of all the above listed walls. Pipe break outside of containment is presently of no concern because of the plant being shutdown.

. The loss of power to the SLCS tank heater is not of concern because the calculated heat loss across the insulated tank wall will not drop to the point of system incapacitation for the short duration SLC is required after an initiating event.

The specific failure that would render the Standby Gas Treatment B inoperable, would be the loss of VEX-210B fan discharge damper (MO-N-113).

However, current plant practice' has this outlet damper failed in the open position due to environmental qualification considerations, ie.. IE Bulletin

  1. 79-018. This practice will continue to be in effect for the time frame of Tech. Spec. relief.

During this period of conditional relief from the stated sections of Tech-nical Specifications, Boston Edison shall implement the following interim actions to address each design base evert of concern. -

Tornado Depressurization All testing shall cease during Tornado Watch conditions as defined by the U.S. Weather Service. .

Seismic The non-impacted trains (loop B) of the Standby Gas Treatment System (SBGTS) and Control Room High Efficiency Air Filtration System (CRHEAFS) shall be continuously operated. The tests shall cease if either of the continually running systems are made or found to be inoperable.

We have concluded that the proposed change does not represent an unreviewed safety question and with the compensatating meas'u res as described above there is reasonable assurance that the public health and safety will not be endangered.

The proposed change has been reviewed and approved by the Operations Review Committee and reviewed by the Nuclear Safety Review and Audit Committee.

sOSTON EDIZDN COMPANY l Mr. Domenic B. Vassallo, Chief January 21, 1982 Page 4 Schedule of Change Boston Edison Company requests this proposed Technical Specification change become effective January 30, 1982.

Fee Consideration In accordance with Section 170.12 of the Commission's Peoulations, Boston Edison proposes this license change as Class III. Accbrdinoly a check for Four Thousand Dollars ($4,000) is enclosed.

Very truly yours, 3 signed originals and 37 copies -

'fg Commonwealth of Massachusetts) _.~

County of Suffolk ) s Then personally appeared before me J. Edward Howard, who, being duly sworn, did state that he is Vice President - Nuclear of Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the sub-mittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My Commission expires: [u// [f /98M [ vYp M

/

Not/try Public

t i

i E

< ,d>0SmE > _

s -

h r- m O <" hr- 9Eeg mc3$n* mgM2"'mmQ- ,

- y

. r

- a

-~

i n .

i m

l e

r P

s te nt ea mc pi

. id

- un qI e

. ~ " l c9' ' .

  • A a i

t

- n e

s sni

~ *d$. .

$ - r a

nt .

o .

ns

) ft e

$dl;. (3 oa 1

l B c si

[l sd on -

LI .

)

C(

)g ) ) )

9j- (

g %5

()5 3

[S B

A D

l D A (

B g

y c

n tI a

- d sn

~

su od

- ' - le

- ' R _

r ' , e' tf

) l eo g ps

'GP .

(

ms oo l

CL

) ' . .

) A MFG ,

(

B AB e -

~ .

-

  • 1 l}

t

  1. 0 .

N I

T N Y O .

L A MO T A I L RI N R RT RL T - YE P OC A W OU LA RM W TC S TE .

M C CR OL C T AN I CT .

E C AI RI R I C DI C AO T B EC TT H C B NA P E ER S R RE NN R R S OT H R RP Y R OE CN O

  • S
  • CV EO SC C .

. .* i, l,  ? .fej:l.ji* ,!:  ;, - .! . i ,?