| Site: | Peach Bottom |
| Issue date: | 01/11/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20040C542 | List: |
| References | |
| NUDOCS 8201290003 | |
| Download: ML20040C541 (2) | |
See also: IR 05000277/1981025
Text
.
4
.
JAN 11 1982
Docket Nos. 50-277
50-278
f
m
G
N
Philadelphia Electric Company
NE
ATTN:
Mr. S. L. Daltroff
(
CgfY
7
J
gD/gp
Vice President
v
sr
7
Electric Production
f
4 3
2301 Market Street
"
Philadelphia, Pennsylvania
19101
y
Gentlemen:
cn
&
Subject:
Inspections 50-277/81-25 and 50-278/81-27
This refers to the routine inspection conducted by Mr. A. Della Ratta of
this office on October 14-16, 1981 at Philadelphia Electric Company and
Peach Bottom Units 2 and 3, Delta, Pennsylvania of activities authorized by
NRC License Nos. DPR-44 and DPR-56 and to the discussions of our findings
held by Mr. Della Ratta with Messrs. M.J. Cooney and W.T. Ullrich of your
staff at the conclusion of the inspection.
Areas examied during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Our inspector also verified the steps you have taken to correct the item of
noncompliance brought to your attention in the enclosure to our letter
dated September 18, 1978. We have no further questions regarding your
action at this time.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
5
set forth in the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorized into the levels described
in the Federal Register Notice (45 FR 66754) dated October 7, 1980.
You
are required to respond to this letter and in preparing your response, you
should follow the tastructions in Appendix A.
'
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding;
DETI
R1.
I
ella Ratta/w Jo ner
T.
g /5/82
i s /r t -
W1
I
0FFICIAL RECORD COPY-
8201290003 820111
f,; i D C '. IE l 0 i,
PDR ADOCK 05000277
5 /
G
o
.
l
Philadelphia Electric Company
2
JAN 1 1 1982
and (b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with section
2.790(b)(1), any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or
part sought to be withheld, and which contains a full statement of the
reasons on the basis which it is claimed that the information should be
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld.shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will be
placed in the Public Document Room. The telephone notification of your
intent to request withholding, or any request for an extension of the 10-
day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
4@
h'#
'
[
Thomas T. Mar in, Director
Division of Engineering and Technical
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report Number 50-277/81-25, 50-278/81-27
cc:
W. T. Ullrich, Station Superintendent
J. D. McGoldrick, Manager, Claims Division, legal Department
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire
Raymond L. Hovis, Esquire
Michael J. Scibinico, II, Assistant Attorney General
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
Director, DRPI (w/ report cover sheet only)
0FFICIAL RECORD COPY