D'
Docket No. 50-461
C
REC 3'jED
Illinois Power Company
JAN 2 71987_r> Tg
ATTN:
Mr. W. C. Gerstner
g; gytq ugnya
'
'
Executive Vice President
M Mvamu
a
500 South 27th Street
,e(
Decatur, IL 62525
,,\\
F3
Gentlemen:
This refers to the routine safety inspection conducted by F_ars. M. Ring and
R. Lanksbury of this office on December 7-11, 1981, of activities at Clinton
Nuclear Power Station, Unit 1, authorized by NRC Construction Permit
No. CPPR-137 and to the discussion of our findings with Mr. T. Plunkett and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
,
phone within ten (10) days from the date of this letter of your intention
I
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
l
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
820127010@
-.L Eol
s,ji
~
r
.
M
Illinois Power Company
-2-
i5 99
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
i
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
:. ::in;1 Cic=1 by C.C. HorcM c;"
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
Inspection
Report No. 50-461/81-30
cc w/ encl:
Dt1B/ Document Control Desk (RIDS)
Resident Inspector, RIII
tiary Jo ?!urray, Office of
Assistant Attorney General
Gary N. Wright, flanager,
Nuclear Facility Safety
Randall L. Plant, Prairie
Alliance
RIII
RIII
RIII
RIllelt
Asl
RII.
RIII
-
'MV$
Q'
fjy
A46'
)
Ring /jp
Nsh,ury
,
Eckiw
Reimann
illiams
a l'gg
re
1/6/82
,
I