Responds to NRC Re Violations Noted in IE Insp Rept 50-247/81-20.Corrective Actions:Health Physics Survey Info Will Be Completed in One Document.Encl B Withheld (Ref 10CFR2.790)
ML20040C475
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 12/18/1981
From: Otoole J
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20040C473 List:
References
NUDOCS 8201270691
Download: ML20040C475 (2)


Text

. - - _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _.__

4 Jthn D. o'Toola VS Prescent Consohdated Edison Company of New York, Inc.

4 trying P: ace New York, NY 10003 Telephone (212) 4G}2533 December 18, 1981 Re:

Indian Point Unit No. 2 Docket No. 50-247 Mr. Eldon J.

Brunner, Chief Projects Branch No. 1 Division of Resident and Project Inspection

. Office of Inspection and Enforcement Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pa.

19406

Dear Mr. Brunner:

Provided herewith as Enclosures A and B are our responses to Ap-pendices A and B, respectively, of IE Inspection Report 50-247/

81-20.

i In accordance with 10CFR73.21 of the Commission's Rules of. Practice, l'

we request that Enclosure B be withheld from public disclosure.

Very! ruly yours, t

/

,/

-pf q,.

J'

(

cc:

Mr.

T.

Rebelowski, Senior Resident Inspector U.

S.

Nuclear Regulatory Commission P.

O. Box 38 Buchanan, New York 10511 ENCLOSURE CONTAINS SAFEGUARD INFORMATION,

.UPON SEPARATION THIS PAGE IS DECONTROLLED 8201270691 820118 PDR ADOCK 05000247 o

PDR

e a

Indian Point Unit No. 2 Inspection Report 50-247/81-20 ENCLOSURE A Item of Non-Compliance 50-247/81-20-01 We concur with the NRC findings with respect to Step Off Pad (SOP) deficiencies; however, it should be noted that these particular SOPS were located in areas with heavy traffic and significant construction activity.

To reduce wear and tear of the paper SOPS and to prevent reocurrence of these deficiencies, translucent plastic covers have been placed on approximately 80% of Unit #1 SOPS and on 100% of Unit #2 SOPS.

The remaining Unit #1 SOPS are expected to be recovered by December 31, 1981.

To ensure proper maintenance in the future, daily inspections have been initiated for heavily used Unit #1 and Unit #2 SOPS.

All other SOPS are inspected on a weekly or monthly basis.

Inspections are documented on check off lists which are submitted for review to the Radwaste General Supervisor.

Item of Non-Compliance 50-247/81-02-06 With respect to the item on procedure adherence and appropriate procedure changes,

a. temporary procedure change was in effect at the time of the NRC inspection.

This procedure change included the revised metnodology observed by the NRC inspectors for cal-culating mci content of LSA drums.

However, due to an oversight by Con Edison personnel, this procedure change was not attached to the copy of Health Physics Instruction (HPI) 9.11 submitted to the inspectors for review.

With respect to proper recording of survey information, the survey infornation should have been recorded in attachments to three health physics instructions (HPI 9.11, 9.12, and 9.15).

Contrary to the requirements, the survey information was only recorded in the attachment to HPI 9.15, and all sections of the attachment were not completed.

To correct this situation, the survey information is no longer required to be completed in the three health physics instructions, but rather one document.

Personnel have been in-structed to complete all sections of the form.