ML20040C443

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/81-58 on 811208-11.No Noncompliance Noted
ML20040C443
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/04/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20040C444 List:
References
NUDOCS 8201270652
Download: ML20040C443 (2)


See also: IR 05000416/1981058

Text

,

-

.

.

$

JAN - 41982

<

't

[

RECetygg ' .

I s era,% y, b lk'

Mississippi Power and Light Company

-

J4Ng g

ATTN:

Mr. N. L. Stampley

-.

F-85 amen

^y}

Vice President of Production

.

P. O. Box 1640

9

\\

Jackson, MS 39205

'

co

"

Gentlemen:

Subject: Report Nos. 50-416/81-58

This refers to the routine safety inspection conducted by Mr. W. P. Ang of

this office on December 8-11, 1981, of activities authorized by NRC Construc-

tion Permit No. CPPR-118 for the Grand Gulf facility and to the discussion of

our findings held with Mr. G. B. Rogers, Jr. , Site Manager, of your staff at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must ne consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

l

I

Sincerely,

l

4/

R. C. Lewis, Director

Division of Resident and

l

Reactor Project Inspection

l

Enclosure:

l

Inspection Report No. 50-416/81-58

cc w/ encl:

See Page 2

8201270652 820104

PDR ADOCK 05000416

G

PDR

ZEct s/i

r

__

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l

~

.

'w.

JAN - 4 IB2

cc w/enci:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

y(

)

nA

e){

e

rY

g

Wl tin

>

RII

R

[

R' I '

RI

R.

W t

L,.

.

.t

/)ARHert

.

1

CEMu phy

PTaylor

ewis

WPAng:ht

12/)C/81

12 g/81

0

12/p /81

12/3 /81

-12j '91

llf/KL

'

_J