ML20040C212
| ML20040C212 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/23/1981 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8201270413 | |
| Download: ML20040C212 (1) | |
Text
,.
F f
1 Ofo 50 i
L 4
~'
DEC z 31881 x,
ot i
h h
Tennessee Valley Authority 7/
h ATTN: Mr. H. G. Parris
.f
?
y' k
Manager of Power
\\'
f2>J~{r G
r L
CEC ^gg b b
-500A Chestnut Street Tower II i
x Chattanooga, TN 37401
\\
-.'j I
~
i 4
2p f
g
- ~
w /x
/
Gentl'emen:
xj
\\y
['i
[
Subject:
Confirmation of Action N
l This is to confirm the telephone discussion between Mr. J. A. Coffey, Assistant Director of Huclear Power and Mr. R. D. Martin. Deputy Regional Administrator, on December 23. 1981. The discussion related to your control of preoperational. testing activities at Unit 2 of the Sequoyah Nuclear Plant.
Based on that discussion. It is our understanding that you have taken or plan to take the following actions:
y b
1.
Conduct a management and technical review of the December 21 event
[9 involving operation of the reactor with a positive moderator-temperature coefficient.
N 2.
Ensure that all relevant findings derived from your test program are factored into operational procedures and instructions.
3.
Verify that personnel involved in similar operational activities
(
are adequately trained.
4.
Discuss the results of you'r findings and actions at a meeting in X
this office early in January; at a date to be determined later.
\\
Please inform this office immediately if your understanding of this matter differs from that stated above.
g; cc: H.J. Green, Director of fluclear Power G.G. Stack, Project Manager Sincerely, J.M. Balletine, Plant Superintendent J.F. Cox, Supervisor, fluclear Licensing Se9 tion it.J. Burzynski, Project Engineer
//hf j7 H.fl. Culver, Chief, fluclear Safggepieg/g,gj{y e
bcc:
J. Sniezek,DRRPI Regional Administrator D. Thompson, EIS Principal Staff C. E. Coner Document Management Brar c/s T @J
[
u f1RC Resident Inspector f
State of Tenressee
/
U p/O n
RII w t R(
RII _ _
/
omct.
kg % g 3 !bbhhhs CEConer: cmc R
wis RDMar in g
sunnwt.
0 k
P
)
NRC Fwm 318kWH6% NRCM ONO__
_12/)f81 12fff 81 _
OATE >
12/2,y/81 PDR h
~
A UA GOVGNM mMUNG OmCO 1Nm W
~
_ _ _ _ _ _ _ _