ML20040C191

From kanterella
Jump to navigation Jump to search
Confirms 810923 Telcon Re 811014 Mgt Meeting in Alanta,Ga to Discuss Results of First Phase of Annual Appraisal of Regulatory Performance (Systematic Assessment of Licensee Performance Program)
ML20040C191
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 09/29/1981
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8201270373
Download: ML20040C191 (2)


Text

1

=

r i

SEP 2 91981 I

j 1

SSINS 50-321 I

50-366 50-424 50-425 m

r\\

Op Georgia Power Company ATTN: Mr. J. H. Miller, Jr.

r1ECE%

Executive Vice President 3D C*

270 Peachtme Street S-MN26

-11 5

A' Atlanta, Georgia 't0303

~

g

,p 3

Gentlemen:

'g g

Subject:

Confirmation of lieeting Arrangement This confims the telephone conversation between Mr. R. D. Baker and Mr. V. L. Bmwnlee on September 23, 1981, concerning a management meeting at your office tirAtlanta on October 14, 1981 We requested this meeting of your regulatory performance which will fto review the results of the first ph Assessment of Licensee Performance pmgram.om a part of the NRC's Systematic The time of the meeting was established as 10:30 a.m.

A proposed agenda is enclosed.

pleased to discuss them.Should you have any questions concerning these arrange Sincerely, M/

James P. O'Reilly r

[97 t

Director

Enclosure:

Pmposed Agenda cc w/ enc 1:

J. T. Beckham, Vice President and bcc w/ enc 1:

- General Manager-Nuclear Generation NRC Resident Inspector M. Manry, Plant Manager Document flanagement Branch K.11. Gillespie. Construction State of Georgia Project Manager C. E. Belflower Site QA Supervisor E. D. Groover, Site QA Supervisor D. O. Foster, Project General Manager 6201270373 810929 DR ADOCK 05000321

" R 1

fE3I EPOS;RII EPOSp II m,,<,,,,

y i

DNc

._.._.$$d JPSk3 R'Dba rti ^

sow ~~ -

{

m_

WE*

NAC Form 318A JUf) (6 CC) NRCM 0240 yr u.s oovinhugwr e iwiWo orrect: 5.es23 ser

]

~

I

'?

\\

4 ENCLOSURE

~

PROPOSED AGENDA Georgia Power Company Meeting with NRC

,',, _, j,,

October, 14, 1981, 10:30 a.m.

d.w ;

James P.-0'Reilly..

I.

OPENING REMARKS Richard C. Lewis-i II. SIMIARY OF PERFORMANCE EVALUATIONS-HATCH 6

'i.

A A.

Plant Operations B.

Refueling Operations C.

Maintenance D.

Surveillance and Inservice Testing E.

Personnel, Training, and Plant Procedures F.

Fire Protection and Housekeeping G.

Design Changes and Modifications 3

H.

Radiation Protection, Radioactive Waste Management, and Transportation I.

Environmental Protection l

J.

Emergency Preparedness i

K.

Security and Safeguards j

L.

Audits, Review, and Comittee Activities i

M.

Administrative, QA and Records i

N.

Corrective Actions and Reporting i

Richard C. Lewis

?.

III. StMtARY OF PERFORMANCE EVALUATIONS-V0GTLE A.

Containment Structure B.

Piping and Hangers C.

Safety-Related Components D.

Corrective Actions and Reporting E.

Procurement All l

IV. DISCUSSIONS OF EVALUATIONS V.

CLOSING CbOENTS James P. O'Reilly 2

I I

I

~DSPrice:mh 9/25/81 I

or ric c.

a sunu-cu l<

UAIE >

42 W \\( % r : av PmMTMG MFtCE %,43236,7