ML20040C181
| ML20040C181 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/23/1981 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| References | |
| NUDOCS 8201270364 | |
| Download: ML20040C181 (2) | |
Text
,
m m
m t,
0
.\\
J SEP 2 31981
!t SSINS 5 -348_
50-364
\\"
02 y
O Alabama Power Company 8
A1TN: Mr. R. P. Mcdonald BECEiWED Vice President-Nuclear Generation g "JAN26l98h g
P. O. Box 2641 Birmingham, AL 35291 Q
Gentlemen:
Subject:
Confimation of Meeting Arrangement m
i This confirms the telephone conversation between Mr. H. O. Thrash and Mr. P. J. Kellogg on September 17, 1981, concerning a management meeting at your office in Bimingham on September 30, 1981. We reqvssted this meeting to review the results of the first phase of our annual appraisal conducted of your regulatory performance which will fom a part of the NRC's Systematic Assessment of Licensee Performance program. The time of the meeting was established as 10:00 a.m.
A proposed agenda is enclosed.
Should you have any questions concerning these arrangements, we will be pleased to discuss them.
Sincerely.
4 James P. O'Reilly Director
Enclosure:
Proposed Agenda cc w/ enc 1:
bcc w/ enc 1:
W. O. Whitt. Executive Vice President NRC Resident Inspector F. L. Clayton, Jr.. Senior Vice President Document Management Branch H. O. Thrath. Manager-Nuclear Generation State of Alabama
- 0. D. Kingsley, Jr. Manager. Nuclear Engineering and Technical Services J. W. McGowan. ManagersSafety Audit and Engineering Review W. C. Carr. Supervisor-Safety Audit and Engineering Review W. G. Hairston. III. Plant Manager 8201270364 810923 PDR ADOCK 05000348 P
PDR q
[Qf RII:EPOS RII:EPOS RII:fd^h pL: 88f1
/
f 1
ornce:.
l DSPri,pe: caw JPStohr RDMar C
e 6 I
}
p/81 9/p3/81 9/[(81 9 QQg1 sunnauc >
u 9/23 oa n.
-c - - o.>.c -
- _.. s _,. _. _...,
)%
ENCLOSURE PROPOSED AGENDA Alabama Power Company Meeting With NRC September 30, 1981, 10:00 a.m.
I.
OPENING REMARKS James P. O'Reilly II.
SUMMARY
OF PERFORMANCE EVALUATIONS Richard C. Lewis
^
III. DISCUSSIONS OF EVALUATIONS All A.
Plant Operations B.
Refueling Operations C.
Maintenance D.
Surveillance and Inservice Testing E.
Personnel, Training and Plant Procedures F.
Fire Protection and Housekeeping G.
Design Changes and Modifications H.
Radiation Protection, Radioactive Waste Management, and Transportation I.
Environmental Protection J.
~K.
Security and Safeguards L.
Audits, Review, and Committee Activities M.
Administrative, QA and Records N.
Corrective Actions and Reporting 0.
Plant! Operations Preparation (Unit 2)
P.
Fuel Loading Preoaration (Unit 2)
Q.
Surveillance and Preoperational Testing (Unit 2)
R. ' Electrical (Unit 2)
S.
Preservice Inspection (Unit 2)
James P. O'Reilly IV. CLOSING COMMENTS
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _