Forwards IE Insp Repts 50-348/81-28 & 50-364/81-31 on 811130-1204.No Noncompliance Noted
ML20040C108
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/18/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20040C109 List:
References
NUDOCS 8201270276
Download: ML20040C108 (2)


See also: IR 05000348/1981028

Text

~

dio

.

,

,

.

DEC 181881

D

o>

f

%

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

&

NECElWED

e"

Vice President-Nuclear Generation

'

i

r

-

6 1982 5 77.

P. O. Box 2641

[ %'"Eg!v

Birmingham, AL 35291

f

ng

Gentlemen:

9

'

'

3

j

Subject: Report Nos hS8]and 50-364/81-31

N

This refers to the routine safety inspection conducted by Mr. P. H. Skinner of

this office on November 30 - December 4, 1981, of activities authorized by NRC

License Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of

our findings held with Mr. J. Woodard, Assistant Plant Manager, at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written applica-

tion to withhold ir. formation contained therein within thirty days of the date of

this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

W

/

f

j

P. J. ixellogg, Chief

'

Reactor Projects Branch

Division of Resident and

Reactor Project Inspection

Enclosure: (See Page 2)

8201270276 611218

DR ADOCK 05000348

'*"

ZE'of s)

~

1

.

,

~

DEC 181981

Alabama Power Company

2

Enclosure:

Inspection Report Nos. 50-348/81-28

and 50-364/81-31

cc w/ enc 1:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H

3. Thrash, General Manager-Nuclear Generation

G. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bec w/ enc 1:

NRC Resident Inspector

Document Management Branch

State of Alabama

QA Team - Belisle

,

,

, - *

Q

PHSkinner:aw

C. Upright

CEMurphy

JRogge

f f

}.ogg

12/ /81

12/

1

12/)}'81

12/j'/81

12//f/81

.