ML20040C108
| ML20040C108 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/18/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20040C109 | List: |
| References | |
| NUDOCS 8201270276 | |
| Download: ML20040C108 (2) | |
See also: IR 05000348/1981028
Text
~
dio
.
,
,
.
DEC 181881
D
o>
f
%
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
&
NECElWED
e"
Vice President-Nuclear Generation
'
i
r
-
6 1982 5 77.
P. O. Box 2641
[ %'"Eg!v
Birmingham, AL 35291
f
ng
Gentlemen:
9
'
'
3
j
Subject: Report Nos hS8]and 50-364/81-31
N
This refers to the routine safety inspection conducted by Mr. P. H. Skinner of
this office on November 30 - December 4, 1981, of activities authorized by NRC
License Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of
our findings held with Mr. J. Woodard, Assistant Plant Manager, at the conclu-
sion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written applica-
tion to withhold ir. formation contained therein within thirty days of the date of
this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
W
/
f
j
P. J. ixellogg, Chief
'
Reactor Projects Branch
Division of Resident and
Reactor Project Inspection
Enclosure: (See Page 2)
8201270276 611218
DR ADOCK 05000348
'*"
ZE'of s)
~
1
.
,
~
DEC 181981
Alabama Power Company
2
Enclosure:
Inspection Report Nos. 50-348/81-28
and 50-364/81-31
cc w/ enc 1:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H
3. Thrash, General Manager-Nuclear Generation
G. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. C. Carr, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bec w/ enc 1:
NRC Resident Inspector
Document Management Branch
State of Alabama
QA Team - Belisle
,
,
, - *
Q
PHSkinner:aw
C. Upright
CEMurphy
JRogge
f f
}.ogg
12/ /81
12/
1
12/)}'81
12/j'/81
12//f/81
.