Summary of 771003 Meeting W/Util & Westinghouse in Bethesda,Md Re Steam Generator Eddy Current Testing.Agenda & List of Attendees Encl
ML20040C093
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/21/1977
From: Burger A
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML13319A635 List:
References
FOIA-81-313 NUDOCS 8201270258
Download: ML20040C093 (3)


Text

,

s

[

UmTE 37 ATE:;

, 7g'.

NUCl.E AR REGULATORY COMMISSION p,s, ;

W ASHi*d G TC*J. O. C. 2055 5 8

NCV 2 1 ST7 Docket No. 50-206 LICENSEE:

Southern California Edison FACILITY: San Onofre Unit 1 (50-1)

SUMMARY

OF MEETING HELD WITH LICENSEE TO DISCUSS STEAM GENERATOR EDDY-CURRENT TESTING On October 3,1977, representatives from Southern California Edison (the licensee), Westinghouse and the Nuclear Regulatory Comission met at the Phillips Building in Bethesda, Maryland. The list of Attendees is contained in Enclosure 1.

The ourpose of the meeting was to discuss the results of steam generator tube eddy-current test results and the licensees plan to return 50-1 to power on October 6,1977. The meeting consisted of presentations by the licensee and Westinghouse which summarized the detailed information in the licensee's report on steam generator tube inspections which was submitted by letter dated October 3,1977. The meeting agenda is contained in Enclosure 2.

Based on the results of the eddy-current testing of steam generator tubes; the metallurgical examination of selected tube specimen removed from steam generator "B"; and visual inspection of the tube bundle, the licensee proposed resumption of S0-1 for a period of 21/2 months.

The licensee will continue detailed analyses of eddy-current data to verify that the absolute and (iifferential tube wear indications are within limits for continued safe operation beyond the proposed 21/2 months operting period.

The staff indicated that it would complete its necessary review of the licensee's October 3, 1977 submittal as soon as reasonably possible.

Di A. Burger, Pro anager Operating Reactors Branch #1 Division of Operating Reactors

Enclosures:

1.

Attendance List 2.

Meeting Agenda 8201270258 810925 PDR FOIA UDELL81-313 PDR

-nnenment 11

s d

ENCLOSURE 2 AG! EDA f:P.C/SCE f4EETI::G STEA:i GENEP.ATOR INSPECTIONS OCTOBER 3,1977 I.

Introduction and Summary - K. Baskin (3 Min.)

II.

Dis:ussion o.' Eddy Current Inspections A.

Eddy Current Techniques and Confidence Levels - H. Houscrman (15 M B.

Eddy Cur:er* Inspection Plans and Results - J. Hagood (10 flin)

~.

III.

Discussion of Examination of Recoved Tube Analyses and Bundle Irspections - S. Shepard (15 Min)

IV.

i::ession o# Safety Aspects of Further Antivibration Car Indications - P. Smith (10 Nin)

V.

Discussion of Action Items - 8. Curtis (5 Min)

VI.

Conclusions m

1

l 1

E.'C L; SLF.E '

l

'TTENDANCE LIET i

NEC/SCE MEETING i

STEAM GENERATOR INSPECTION OCTOBER 3, 1977 4

Southern California Edison K. P. Baskin B. L. Curtis R. W. Krieger D. E. Nunn-t Westinohouse T. E. Bowman III J. R. Elm.endorf J. C. Hagood Jr.

H. Houserman D. C. Marburger D. C. McIntire F. W. Pement R. M. Shepard t

P. G. Smith Nuclear Regulatory'.Cbmmission 1

i L. Chandler -'0 ELD

'~

W. J. Collins - IE L. Frank - SD B. D. Liaw - D0R W. T. Russell - DOR l

A. Schwencer - 00R L. Shao - D0R R. J. Stuart - DOR J. Strosnider - D0R

-