ML20040B836
| ML20040B836 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 12/21/1981 |
| From: | Delgeorge L COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20040B830 | List: |
| References | |
| NUDOCS 8201260461 | |
| Download: ML20040B836 (2) | |
Text
..
. = _. - -.
Y
~
Ccmm:nwxith Edison O
one rust tJanonal Ptara. Chicago. lilinms O
A'ddriis's' Reply to Post Office Box 767 j
Chicago. Ilknois 60690 i
December 21, 1981 j
i 1
Mr. James G.
Kepple r, Regional Administrator i
Directorate of Inspection and i
Enforcement - Region III i
U.S.
Nuclear Regulatory Commission e
799 Roosevelt Road i
j Glen Ellyn, IL 60137 i
Subject:
Byron Station Units 1 and 2 j
I.E.
Inspection Report Nos.
50-454/81-09 a n 50-455/81-st- 0[
NRC Docket Nos. 50-454 and 455 q
l References (a):
August 24, 1981, letter from i
C. E. Norelius to Co rdell Reed.
i i
(b):
Septembe r 24, 1981, let te r f rom j
L.
O. DelGeorge to J.
G. Keppler.
l (c):
November 5, 1981, letter from C. E. No relisu to Co rdell Reed, i
(d):
Novembe r 2 5, 1981, letter from j
L.
O. DelGeorge to J.
G.
Keppler.
1 i
Dear Mr. Keppler:
J l
This is to provide additional information regarding the reviews o f design changes at Byron which were discussed in references (a), (b), (c) ano (d).
Recently Commonwealth Edison Quality Assurance Manual Design Change Control Procedure QP 3-2 was revised.
This November 16, 1981, revision incorporates the onsite Architect Engineering j
change features Byron site had in place as o f the NRC exit debriefing o f July 31, 1981.
This currently approved method of review, approval, and release for construction o f certhin design changes wa s, howeve r, in noncompliance with the previous revision 4
of the Commonwealth Edison Quality Assurance Manual.
Currently, Engineering Procedures are in place describing both onsite design change methods:
- 1) issuance of an approved design sketch or 2) issuance of a formal drawing.
These procedures also delineate the capabilities of the onsite Architect Engineering organizations to review and approve a " Major" Field Change Request when appropriately structured.
i egSi{%8$I*o$500 hog DEC 2 8 1980 1
G
J.
G.
Keppler December 21, 1981 Please address further questions regarding this matter to this office.
Very truly yours, f$/
-[v r L. O. DelGeo rg e Director o f Nuclea r Licensing 1m i