Provides Addl Response to NRC Re Violations Noted in IE Insp Repts 50-454/81-09 & 50-455/81-08.Design Change Control Procedures Revised Re Issuance of Approved Design Sketch,Issuance of Formal Drawing & Design Approval
ML20040B836
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/21/1981
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20040B830 List:
References
NUDOCS 8201260461
Download: ML20040B836 (2)


Text

..

. = _. - -.

Y

~

Ccmm:nwxith Edison O

one rust tJanonal Ptara. Chicago. lilinms O

A'ddriis's' Reply to Post Office Box 767 j

Chicago. Ilknois 60690 i

December 21, 1981 j

i 1

Mr. James G.

Kepple r, Regional Administrator i

Directorate of Inspection and i

Enforcement - Region III i

U.S.

Nuclear Regulatory Commission e

799 Roosevelt Road i

j Glen Ellyn, IL 60137 i

Subject:

Byron Station Units 1 and 2 j

I.E.

Inspection Report Nos.

50-454/81-09 a n 50-455/81-st- 0[

NRC Docket Nos. 50-454 and 455 q

l References (a):

August 24, 1981, letter from i

C. E. Norelius to Co rdell Reed.

i i

(b):

Septembe r 24, 1981, let te r f rom j

L.

O. DelGeorge to J.

G. Keppler.

l (c):

November 5, 1981, letter from C. E. No relisu to Co rdell Reed, i

(d):

Novembe r 2 5, 1981, letter from j

L.

O. DelGeorge to J.

G.

Keppler.

1 i

Dear Mr. Keppler:

J l

This is to provide additional information regarding the reviews o f design changes at Byron which were discussed in references (a), (b), (c) ano (d).

Recently Commonwealth Edison Quality Assurance Manual Design Change Control Procedure QP 3-2 was revised.

This November 16, 1981, revision incorporates the onsite Architect Engineering j

change features Byron site had in place as o f the NRC exit debriefing o f July 31, 1981.

This currently approved method of review, approval, and release for construction o f certhin design changes wa s, howeve r, in noncompliance with the previous revision 4

of the Commonwealth Edison Quality Assurance Manual.

Currently, Engineering Procedures are in place describing both onsite design change methods:

1) issuance of an approved design sketch or 2) issuance of a formal drawing.

These procedures also delineate the capabilities of the onsite Architect Engineering organizations to review and approve a " Major" Field Change Request when appropriately structured.

i egSi{%8$I*o$500 hog DEC 2 8 1980 1

G

J.

G.

Keppler December 21, 1981 Please address further questions regarding this matter to this office.

Very truly yours, f$/

-[v r L. O. DelGeo rg e Director o f Nuclea r Licensing 1m i

3069N i