ML20040B795

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-445/81-19 & 50-446/81-19 on 811207-11.No Noncompliance Noted
ML20040B795
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/04/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20040B796 List:
References
NUDOCS 8201260417
Download: ML20040B795 (2)


See also: IR 05000445/1981019

Text

. - . .

.

_ _

.

_

_

- - .

-

.

-

- _ _ _ _ _

M

,

,

i

i

J

'

In Reply Refer To:

Dockets: 50-445/81-19

i

50-446/81-19

.L

,<

-

. , , , ,

'

,

,

{

[

,

v:1

.

Texas Utilities Generating Company

[

,'

'

ATTil: Mr. R. J. Gary, Executive Vice

\\,

,

President and General Manager

'

J'

2001 Bryan Tcwer

/

Dallas, Texas 75201

f-

s

Gentlemen:

This refers to the inspection conducted by Messrs. L. E. Martin, R.11. Brickley,

and C. E. Johnson of our staff during the period December 7-11, 1981, of

t

activities authorized by HRC Construction Permits CPPR-126 and CPPR-127 for

the Comanche Peak facility, Units 1 and 2, and to the discussion of our find-

,

ings with Mr. R. G. Tolson of your staff at the conclusion of the inspection.

'

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors,

liithin the scope of the inspection, no violations or deviations were identi-

fied.

e

Two new unresolved items are identified in paragraph 3 of the enclosed HRC

Inspection Report 81-19.

,

j

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

'

by telephone, within 10 days of the date of this letter and submit written

,

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the require-

ments of 2.790(b)(1).

0201260417 820104

PDR ADOCK 05000

.

/E 0l

l

-) _

.

3

I RRI).,k

.E

pgy.

. ./ 3.

l

onafRPS3

RPS3

E I,B

.

.

j somoj,LMartingc.

"AQ ro s,s.ma.0.

. 7tEMR .

. .GLMa dsen .

.JGaplia rdo .

.'J$ollins-

"

" " y z i z ' n . A / M g.t..

1lA e t. k.t.

s<t.2l. :s

. . b\\ / . . .

'tMt...

.....

.

.

' Ec ronu m ovooi sncu em

OFFICI AL RECORD COFY

,

.

- - . - - - - - . -.

- - - . - .- . --


- - - -

-


- - - 1

_ _

. _ .

<

.

.

Texas Utilities Generating Co.

-2-

Should you have any questions concerning this inspection, we will be pleased

to discus- them with you.

Sincerely,

<f

Ly.

c. t

<a.e

G. L. Madsen, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report 50-445/81-19

50-446/81-19

cc w/ enclosure:

Texas Utilities Generating Company

ATTH: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas 75201

bcc to DMB (IE01):

bcc distrib. by RIV:

BC

Resident Inspectors

PM

Section Chiefs #2 & #3

AE00

Info Systems

ELD

EIB

IE File

TIB

IE/RPRIB

Texas Dept. Health Resources

NRR/DHFS

J. Ellis, CASE

NRR/0LB

G. M. Gay, Leg. Svts.

RAD ASMT BR

R. W. Lowerre, EPA

RESEARCH

R. Fouke, Arl.

PDR:HQ

LPDR

NSIC

NTIS

onic a p

,

'suusaur)

oAn )

.

.

.

.

..

.

.

n ec ,0.

m, o o .o . ~ nc u 02 '"

OFFICIAL RECORD COPY

l

_

_

_