ML20040B795
| ML20040B795 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/04/1982 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20040B796 | List: |
| References | |
| NUDOCS 8201260417 | |
| Download: ML20040B795 (2) | |
See also: IR 05000445/1981019
Text
. - . .
.
_ _
.
_
_
- - .
-
.
-
- _ _ _ _ _
M
,
,
i
i
J
'
In Reply Refer To:
Dockets: 50-445/81-19
i
50-446/81-19
.L
,<
-
. , , , ,
'
,
,
- {
[
,
v:1
.
Texas Utilities Generating Company
[
,'
'
ATTil: Mr. R. J. Gary, Executive Vice
\\,
,
President and General Manager
'
J'
2001 Bryan Tcwer
/
Dallas, Texas 75201
f-
s
Gentlemen:
This refers to the inspection conducted by Messrs. L. E. Martin, R.11. Brickley,
and C. E. Johnson of our staff during the period December 7-11, 1981, of
t
activities authorized by HRC Construction Permits CPPR-126 and CPPR-127 for
the Comanche Peak facility, Units 1 and 2, and to the discussion of our find-
,
ings with Mr. R. G. Tolson of your staff at the conclusion of the inspection.
'
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors,
liithin the scope of the inspection, no violations or deviations were identi-
fied.
e
Two new unresolved items are identified in paragraph 3 of the enclosed HRC
Inspection Report 81-19.
,
j
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
'
by telephone, within 10 days of the date of this letter and submit written
,
application to withhold information contained therein within 30 days of the
date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1).
0201260417 820104
PDR ADOCK 05000
.
/E 0l
l
-) _
.
3
I RRI).,k
.E
pgy.
. ./ 3.
l
onafRPS3
RPS3
E I,B
.
.
j somoj,LMartingc.
"AQ ro s,s.ma.0.
. 7tEMR .
. .GLMa dsen .
.JGaplia rdo .
.'J$ollins-
"
" " y z i z ' n . A / M g.t..
1lA e t. k.t.
s<t.2l. :s
. . b\\ / . . .
'tMt...
.....
.
.
' Ec ronu m ovooi sncu em
OFFICI AL RECORD COFY
,
.
- - . - - - - - . -.
- - - . - .- . --
- - - -
-
- - - 1
_ _
. _ .
<
.
.
Texas Utilities Generating Co.
-2-
Should you have any questions concerning this inspection, we will be pleased
to discus- them with you.
Sincerely,
<f
Ly.
c. t
<a.e
G. L. Madsen, Chief
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report 50-445/81-19
50-446/81-19
cc w/ enclosure:
Texas Utilities Generating Company
ATTH: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
bcc to DMB (IE01):
bcc distrib. by RIV:
Resident Inspectors
Section Chiefs #2 & #3
AE00
Info Systems
ELD
EIB
IE File
TIB
IE/RPRIB
Texas Dept. Health Resources
NRR/DHFS
J. Ellis, CASE
NRR/0LB
G. M. Gay, Leg. Svts.
RAD ASMT BR
R. W. Lowerre, EPA
RESEARCH
R. Fouke, Arl.
PDR:HQ
LPDR
onic a p
,
'suusaur)
oAn )
.
.
.
.
..
.
.
n ec ,0.
m, o o .o . ~ nc u 02 '"
OFFICIAL RECORD COPY
l
_
_
_