ML20040B771
| ML20040B771 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 01/06/1982 |
| From: | Harrison F CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20040B753 | List: |
| References | |
| NUDOCS 8201260399 | |
| Download: ML20040B771 (9) | |
Text
1 APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-9325 UNIT BRUNSWICK UN',T 1 DATE 01/05/82 COMPLETED BY FRANCES HARRISON TELEPHONE 719-457-9521 DECEMBER 81 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 624.
17 749.
2 5.
18 742.
3
-11.
19 727.
4 50.
20 737.
5 556.
21 745.
6 652.
22 744.
7 638.
23 741.
8
- 739, 24 710.
9
- 743, 25 732.
10 752.
26 742.
11 758.
27 733.
12 751.
28 740.
13 749.
29 708.
14 750.
30 510.
15 743.
31 697.
16 750.
i 1.16 - 8 O$$$lfj4 0 K PDR
1 1
1.
j OPERATING DATA REPORT
}
DOCKET NO. 050-0325 DATE 01/05/82 I
COMPLETED BY FRANCES HARRIS 0N' j
TELEPHONE 919-457-9521 i
)
OPERATING STATUS j
1.
UNIT NAME: BRUNSWICK UNIT 1 I NOTES Il 2.
PEPORTING PERIOD: DECEMBER 81 I
Ii
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I, 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I' 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
I 7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
}
}
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE l
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL j
MONTH DATE ATIVE 1
i i
- 11. HOURS IN REPORTING PERIOD 744.0 8760.0 42001.0 1
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 700.8 4463.2 28265.3 j
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1 j
- 14. HOURS GENERATOR ON LINE 685.6 4157.8 26539.6 1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1556278.8 8294071.7 54417804.6
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 495623.0 2675611.0 18001205.0
- 18. NET ELECTRICIAL ENERGY CENERATED (MWH) 480149.0 2556057.0 17303491.0
- 19. UNIT SERVICE FACTOR 92.2 47.5 63.2 2
- 20. UNIT AVAILABILITY FACTOR 92.2 47.5 63.2 l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 81.7 36.9 52.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 78.6 35.5 50.2 1
- 23. UNIT FORCED OUTAGE RATE 7.8 37.6 22.0
- 24. SHUTDOWNS SCHEDLLED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
1 c5. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ O/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERICIAL OPERATION l
1.16 - 9 1
I
- L
.___._____,I
1 APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 01/06/82 COMPLETED BY FRANCES HARRISO TELEPHONE 919-457-9521 DECEMBER 81 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 606.
17 761.
2 607.
18 339.
3 606.
19
-12.
4 607.
20
-12.
5 603.
21 412.
6 605.
22 663.
7 602.
23 658.
8 600.
24 673.
9 604.
25 669.
10 619.
26 382.
11 691.
27 521.
12 627.
28 680.
13 653.
29 673.
I 14 745.
30 674.
15 759.
31 680.
i l
16 759.
i 1
1 1.16 - 8 i
OPERATING DATA REPORT DOCKET NO. 050-0324 l
DATE 01/06/82 COMPLETED BY FRANCES HARRISON 1
TELEPHONE 919-457-9521 i
OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIOD: DECEMBER 81 I
I j
- 3. LICEtBED THERMAL POWER (MWT): 2436 I
I i
4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
I i
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I i
6.
MAX DEPENDABLE CAPACITY (GROSS NWE): 815.0 I I
7.
MAX DEPENDABLE CAPACITY (NET MWID : 790.0 8.
IF CHANGES OCCUR IN CAPACITY RA"INGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
i i
THIS YR TO CUMUL j
MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8760.0 54025.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 701.0 6144.6 35166.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 14. HOURS GENERATOR ON LINE 680.1 5805.0 32769.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1375144.5 10386156.7 59997537.6
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 448079.0 3429491.0 19993937.0 j
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 433241.0 3283984.0 19189413.0 l
- 19. UNIT SERVICE FACTOR 91.4 66.3 60.7
- 20. UNIT AVAILABILITY FACTOR 91.4 66.3 60.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 73.7 47.5 45.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 70.9 45.7 43.3
- 23. UNIT FORCED OUTAGE RATE 8.2 30.9 17.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
.i i
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ O/ 0
]
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED
{
INITIAL CRITICALITY
]
i INITIAL ELECTRICITY COMMERICIAL OPERATION 14 16 - 9
-.._.-..~_.-_,,_.~,_..,-___,-,-,.m.,...,-,.,..r1
n n
n 050-0325 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 1 DATE Januarv 1982 COMPLETED BY Frances Harricon i
REPORT MONT11 December 1981 TELEPif0NE ( 914M 57-9521 3
~.
c 3?
'h
..' ll 9, Licensee
,E-r, Cause & Corrective No.
Date c.
- =
i; E E l~i Event 3 "9 Q
Action to S
js 3,3 Report :
tE 0 Prevent Recurrence u
d.81-049 81 12 02 F
58.4 B
1 NA
.lb\\
Turbine Turbine generator separated from grid-pack leaking on IB21-F005.
Repacked valve E
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A 1qmpment Failure (Explain) 1 -Manual for Prepwation of Data n Maintenance of Test 2 Manual Seram.
Entry Sheets for Liecusee C Refucting 3 Automatic Scram.
Esent Report (LER) File (NUREG.
D. Regulatory Restriction 4 Continuations 0161)
E Operator Training & License Examination 5-Load Reductions 5
F Administrative 6-Other Exhibit I Same Source G-Operational Errur (Explain)
(9/77)
Il-Other (Esplain)
APPENDIX i
Docket No:
050-325 Unit:
Brunswick No. 1 Date:
December 1981 Completed By:
Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 4
Brunswick Unit No. 1 operated at 92.2% availability factor for the month of i
December with an 81.7% capacity factor.
There was one "off-line" outage.
It is detailed in Appendix D, the unit shutdowns and power reduction log.
l There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.
i 1
i 1
I
b b
050-0325 DOCKETNO.
UNIT SilDTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 2 DATE Awa r" lor' COMPLETED F.Y Frances Harricon REPORT MONTil Decenber 1981 TELEPllONE (41 M57 os?!
E E
jg 3
4 ;! '.i Licensee 3 r,
$"o Cause & Corrective
[3 o.
Action to No.
Date r-
- 2 i
EEJ Event n7 S
j$
}d Report :
iN0 U
Prevent Recurrence d.81-047 81 1,2 18 F
57.2 A
3 NA IE INSTRU Faulty high steam flow switch caused Group 1 isolation.
Flow switches were checked. Analog mod will give Operations indication bs to when steam line flow functions have reset and also decrease the deadband.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A 1 quipment Failure (Explain) 1 Manual for Preparation of Daia 11 Maintenance of Test 2 Manual Seram.
Entry Sheets for Licensee C Refucting
- 3. Automatic Scram.
Esent Report (LER)Fde(NUREG-D Regulatory Restriction 4 Continuations 0161)
E Operator Training & License Examination 5-Load Reductions i
5 l
F. Administrative 6-Other G-Operational Error (Explain)
Exhibit I-Same Source c/77)
Il-Other (Explain)
O O
O DOCKET NO. 050-0325 UNIT SliUTDOWNS AND POWER REDUCTIONS UNIT N AME un m c-e i e t-DATE.Tanuarv 1982 rrnnce c ",vrfcnn COMPLETED BY REPORT MONTil DeceMer 1981 TELEPl!ONE (919)457-9521 J,
E 3
jg "h
4 j '.i Licensee
[-r, je.
Cause & Corrective No.
Date c
iE i
E E c'$
Event
- '?
c.3 Action to S
js 5
3e d Report :
80
$U Prevent Recurrence u
6 81-051 81 12 26 F
6.7 A
1 NA CH Instru Removed generator f rom grid to repair leak on east MSR drain tank manway.
Casket on east MSR tank blew out.
Replaced manway gasket.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A l'quipment Failure (Esplain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scrarn.
Entr> Sheets for Licensee C-Refucting 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuations 0161i E-Operator Training & License Examination 5-Load Reductions S
F-Administrative 6-Other Exhibit I-Same Source G-Operational Error (Explain) en/77) li-Other (Explain)
APPENDIX Docket No:
050-324 Unit:
Brunswick No. 2 Date:
December 1981 Completed By:
Francc3 Ilarrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at a 91.4% availability factor for the month of December with 73.7% capacity factor. There were two off-line outages this month. They are detailed in Appendix D, the unit shutdowns and power reduction log.
1 There are 264 BWR and 144 PWR spent fuel bundles in the Brunswick Unit No. 2 fuel pool, i
l i
...