MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
1 APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-9325 UNIT BRUNSWICK UN',T 1 DATE 01/05/82 COMPLETED BY FRANCES HARRISON TELEPHONE 719-457-9521 DECEMBER 81 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 624. 17 749.
2 5. 18 742.
3 -11. 19 727.
4 50. 20 737.
5 556. 21 745.
6 652. 22 744.
7 638. 23 741.
8 739, 24 710.
9 743, 25 732.
10 752. 26 742.
11 758. 27 733.
12 751. 28 740.
13 749. 29 708.
14 750. 30 510.
15 743. 31 697.
16 750.
i 1.16 - 8 0 K O$$$lfj4 PDR
1 1
1 .
j OPERATING DATA REPORT
} DOCKET NO. 050-0325 DATE 01/05/82 I COMPLETED BY FRANCES HARRIS 0N' j TELEPHONE 919-457-9521 i
) OPERATING STATUS j _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,
- 1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES Il
- 2. PEPORTING PERIOD: DECEMBER 81 I Ii
- 3. LICENSED THERMAL POWER (MWT): 2436 I I,
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I'
! 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I I 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
}
} 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE l
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL j MONTH DATE ATIVE 1 i i 11. HOURS IN REPORTING PERIOD 744.0 8760.0 42001.0 ;
1 12. NUMBER OF HOURS REACTOR WAS CRITICAL 700.8 4463.2 28265.3 j 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1 j 14. HOURS GENERATOR ON LINE 685.6 4157.8 26539.6 <
1 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1556278.8 8294071.7 54417804.6
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 495623.0 2675611.0 18001205.0
- 18. NET ELECTRICIAL ENERGY CENERATED (MWH) 480149.0 2556057.0 17303491.0
- 19. UNIT SERVICE FACTOR 92.2 47.5 63.2 2 20. UNIT AVAILABILITY FACTOR 92.2 47.5 63.2 l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 81.7 36.9 52.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 78.6 35.5 50.2 1
- 23. UNIT FORCED OUTAGE RATE 7.8 37.6 22.0
- 24. SHUTDOWNS SCHEDLLED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
1 c5. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ O/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------
l INITIAL ELECTRICITY -------- --------
COMMERICIAL OPERATION -------- -------- '
l 1.16 - 9 1 !
I L______________.-_____.-._.._
.___._____,I
1 APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 01/06/82 COMPLETED BY FRANCES HARRISO TELEPHONE 919-457-9521 DECEMBER 81 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 606. 17 761.
2 607. 18 339.
3 606. 19 -12.
4 607. 20 -12.
5 603. 21 412.
6 605. 22 663.
7 602. 23 658.
8 600. 24 673.
9 604. 25 669.
10 619. 26 382.
11 691. 27 521.
12 627. 28 680.
13 653. 29 673.
14 745. 30 674. I 15 759. 31 680. i l
16 759.
i 1
1 1.16 - 8 i
- OPERATING DATA REPORT DOCKET NO. 050-0324 l DATE 01/06/82 COMPLETED BY FRANCES HARRISON 1 TELEPHONE 919-457-9521 i
OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIOD: DECEMBER 81 I I j 3. LICEtBED THERMAL POWER (MWT): 2436 I I i 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I i 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I i 6. MAX DEPENDABLE CAPACITY (GROSS NWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWID
- 790.0 -------------------------------
- 8. IF CHANGES OCCUR IN CAPACITY RA"INGS (ITEMS 3 THRU 7) SINCE LAST REPORT,
. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
i i
- THIS YR TO CUMUL j MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8760.0 54025.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 701.0 6144.6 35166.9 '
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 ,
i
- 14. HOURS GENERATOR ON LINE 680.1 5805.0 32769.3
, 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1375144.5 10386156.7 59997537.6 '
! 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 448079.0 3429491.0 19993937.0 j 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 433241.0 3283984.0 19189413.0 l 19. UNIT SERVICE FACTOR 91.4 66.3 60.7 '
- 20. UNIT AVAILABILITY FACTOR 91.4 66.3 60.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 73.7 47.5 45.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 70.9 45.7 43.3 '
- 23. UNIT FORCED OUTAGE RATE 8.2 30.9 17.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
.i i I
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ O/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED l
] l l
{ INITIAL CRITICALITY -------- --------
]
i INITIAL ELECTRICITY -------- --------
COMMERICIAL OPERATION -------- --------
14 16 - 9
< l 1
l l
1
_ _ , . . _ . , _ . . . , , . . . . _ _ _ _ _ . - - - , , , . , - - , _ - , . . - , . , -.._.-..~_.-_,,_.~,_..,-___,-,-,.m.,...,-,.,..r1
n n n -
DOCKET NO. 050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 1 DATE Januarv 1982 COMPLETED BY Frances Harricon i
REPORT MONT11 December 1981 TELEPif0NE ( 914M 57-9521 3
~.
c
., 3? 'h ..' ll 9, Licensee ,E-r, $*, Cause & Corrective No. Date c. ;= i; E E l~i Event 3 "9 Q Action to S js $ 3,3 Report : tE 0 u
$' Prevent Recurrence d.81-049 81 12' 02 F 58.4 B 1 NA .lb\ Turbine Turbine generator separated from grid-pack leaking on IB21-F005.
Repacked valve E
I 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions A 1qmpment Failure (Explain) 1 -Manual for Prepwation of Data S: Scheduled n Maintenance of Test 2 Manual Seram. Entry Sheets for Liecusee C Refucting 3 Automatic Scram. Esent Report (LER) File (NUREG.
D. Regulatory Restriction 4 Continuations 0161) ,
E Operator Training & License Examination 5-Load Reductions 5
F Administrative 6-Other Exhibit I Same Source G-Operational Errur (Explain)
(9/77) Il-Other (Esplain)
APPENDIX i
Docket No: 050-325
, Unit: Brunswick No. 1 Date: December 1981 Completed By: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 4
Brunswick Unit No. 1 operated at 92.2% availability factor for the month of i December with an 81.7% capacity factor. There was one "off-line" outage. It is detailed in Appendix D, the unit shutdowns and power reduction log.
l There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.
i 1
i 1
I
b b '.
DOCKETNO. 050-0325 ,
UNIT SilDTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 2 DATE Awa r" lor' COMPLETED F.Y Frances Harricon REPORT MONTil Decenber 1981 TELEPllONE (41 M57 os?!
. E E
-, jg 3 4 ;! '.i Licensee 3 r, $"o Cause & Corrective No. Date r- ;2 i EEJ Event n7 o. Action to S iN0 U j$ $ }d Report :
[3 Prevent Recurrence d.81-047 81 1,2 18 F 57.2 A 3 NA IE INSTRU Faulty high steam flow switch caused Group 1 isolation.
Flow switches were checked. Analog mod will give Operations indication bs to when steam line flow functions have reset and also decrease the deadband.
I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A 1 quipment Failure (Explain) 1 Manual for Preparation of Daia 11 Maintenance of Test 2 Manual Seram. Entry Sheets for Licensee C Refucting 3. Automatic Scram. Esent Report (LER)Fde(NUREG-D Regulatory Restriction 4 Continuations 0161)
E Operator Training & License Examination 5-Load Reductions i F. Administrative 5 l 6-Other Exhibit I- Same Source G-Operational Error (Explain) c/77) Il-Other (Explain)
O O O
- DOCKET NO. 050-0325 UNIT SliUTDOWNS AND POWER REDUCTIONS UNIT N AME un m c-e i e t- '
DATE .Tanuarv 1982 COMPLETED BY rrnnce c ",vrfcnn REPORT MONTil DeceMer 1981 TELEPl!ONE (919)457-9521 J, -
-. E 3
- :, jg "h 4 j '.i Licensee [-r, je. Cause & Corrective No. Date c iE i E E c'$ Event : '? c.3 Action to S js 5 Report : 80 $U Prevent Recurrence 3e d ,
u 6
81-051 81 12 26 F 6.7 A 1 NA CH Instru Removed generator f rom grid to repair leak on east MSR drain tank manway.
Casket on east MSR tank blew out.
Replaced manway gasket.
3 4 I 2 F: Forced Reason: Method: Exhibit G-Instructions A l'quipment Failure (Esplain) 1 Manual for Preparation of Data S: Scheduled B-Maintenance of Test 2 Manual Scrarn. Entr> Sheets for Licensee C-Refucting 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuations 0161i E-Operator Training & License Examination 5-Load Reductions S
F-Administrative 6-Other Exhibit I- Same Source G-Operational Error (Explain) en/77) li-Other (Explain)
APPENDIX Docket No: 050-324 Unit: Brunswick No. 2 Date: December 1981
- Completed By
- Francc3 Ilarrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at a 91.4% availability factor for the month of December with 73.7% capacity factor. There were two off-line outages this month. They are detailed in Appendix D, the unit shutdowns and power reduction log. 1 There are 264 BWR and 144 PWR spent fuel bundles in the Brunswick Unit No. 2 fuel pool, i
l 1
i