Forwards IE Insp Rept 50-341/81-19 on 811208-11.No Noncompliance Noted
ML20040B568
Person / Time
Site: Fermi 
Issue date: 01/19/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML20040B569 List:
References
NUDOCS 8201260199
Download: ML20040B568 (2)


See also: IR 05000341/1981019

Text

r

.

.

~

.-

/.h

',x

Cocket No. 50-341

Q\\

.\\

The Detroit Edison Company

ATTN:

fi r . Donald A. Wells

I

flanager, Quality Assurance

2 BOO Second Avenue

Detroi , til 48226

Gentlemen:

This refers to the routine safay inspectior. conducted by Mr. C. M. Erb

of this of fice on Decembei 8-11, 1981, of activities at Enrico Fermi

Nuclea r Power t'lant , Unit 2, authorized by NRC Construction Permit No.

CPPR-87 and to the discussion of our findings with Flessrs. H. A. Walker

and D. Spiers at the conclusion of tt.e inspection.

The enclosed copy of our inspection report identifies areas examined

l

during the inspectice

Within these areas, the inspection consisted

of a selective examination of procedures and rey esentative records,

observations, and interviews with personnel.

l

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele'-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

8201260199 820119

gDRADOCK 05000341

,

PDR

l f,0 I

.s

//

.

Detroit Edison Company

-2-

Jg y 9 ggg

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from yce in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We wil1 gladly discuss any questions you have concerning this inspection.

Sincerely,

e,,gr-j ci~.r? Ly C.E. !!orclin"

.

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure-

Inspection

Report Nr.

50-341/81-19

cc w/ encl:

DMB/ Document Centrol Desk (RIDS)

Resident inspector, Rill

Ronaid Callen, Michigan

public Service Commission

Eugene B. Thomas, Jr.,

Attorney