ML20040B568
| ML20040B568 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/19/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wells D DETROIT EDISON CO. |
| Shared Package | |
| ML20040B569 | List: |
| References | |
| NUDOCS 8201260199 | |
| Download: ML20040B568 (2) | |
See also: IR 05000341/1981019
Text
r
.
.
- ~
.-
/.h
',x
Cocket No. 50-341
Q\\
.\\
The Detroit Edison Company
ATTN:
fi r . Donald A. Wells
I
flanager, Quality Assurance
2 BOO Second Avenue
Detroi , til 48226
Gentlemen:
This refers to the routine safay inspectior. conducted by Mr. C. M. Erb
of this of fice on Decembei 8-11, 1981, of activities at Enrico Fermi
Nuclea r Power t'lant , Unit 2, authorized by NRC Construction Permit No.
CPPR-87 and to the discussion of our findings with Flessrs. H. A. Walker
and D. Spiers at the conclusion of tt.e inspection.
The enclosed copy of our inspection report identifies areas examined
l
during the inspectice
Within these areas, the inspection consisted
of a selective examination of procedures and rey esentative records,
observations, and interviews with personnel.
l
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele'-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
8201260199 820119
gDRADOCK 05000341
,
l f,0 I
.s
//
.
Detroit Edison Company
-2-
Jg y 9 ggg
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from yce in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We wil1 gladly discuss any questions you have concerning this inspection.
Sincerely,
e,,gr-j ci~.r? Ly C.E. !!orclin"
.
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure-
Inspection
Report Nr.
50-341/81-19
cc w/ encl:
DMB/ Document Centrol Desk (RIDS)
Resident inspector, Rill
Ronaid Callen, Michigan
public Service Commission
Eugene B. Thomas, Jr.,
Attorney
liarry II. Voight, Attorney
.
RIII
Rill
Rhf
..
llA:
RIII i
RIII
pyJ'
/.
tOfIr/jp
Danielson
'ok
11:ams
No
1/5/82
g/g/fv
- F'
-
',