r1 R)
?
O n:nFf a r
J PACIFIC OAS AND E LE C T RI C C C M PANY 7 7 BE ALE STRE ET,31$T FLOO R, S AN FR ANCiSCO, C ALIFORNI A 94106 P. O. D OX 74 4 2 g
T E L E P H O N E (415) 781 4 211 TE LECOPlER (415) 543 7813 January 8, 1982
/W[kh>
d Mr. R. H. Engelken, Director Office of Inspection and Enforcement M/, r.,
C Region V
/!
y
. C' '
\\'\\
S' U. S. Nuclear Regulatory Commission
'i s
1450 Maria Lane, Suite 210 i
e d".,., U B5? >
t i l
Walnut Creek, CA 94596 1 '.
n
\\
t Re:
Docket No. 50-275
-x c
1 x
Diablo Canyon Unit 1
/
Yg -rNg/
License No. DPR-76
Dear Mr. Engelken:
On November 18, 1981 PGandE submitted to you a draft copy of the
" Preliminary Report, Seismic Reverification Program".
At that time, we provided this report to inform you of the current status and extent of R. L. Cloud Associates, Inc. program. However, the November 19, 1981 Commission Order CL1-81-30 expanded and formalized the requirements for this program and required the submission of twice monthly program status reports.
In accordance with these requirements, we have submitted four of these reports.
Since our final report will provide the complete results of the reverification program including findings, cause, corrective action, disposition, and a description of any implications regarding plant safety, we do not require a reply regarding our November 18 submittal.
We hope that this information clarifies the intent of our November 18 submittal.
Sincerely, Philip A. Crane, Jr.
cc:
Mr. F. J. Miraglia Licensing Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 g5ol 5
Service List i D f
8201260162 82010s DR ADOCK 05000275 p
-