ML20040B431
| ML20040B431 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 01/22/1982 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Kay J YANKEE ATOMIC ELECTRIC CO. |
| Shared Package | |
| ML20040B432 | List: |
| References | |
| TASK-03-06, TASK-3-6, TASK-RR LSO5-82-01-057, LSO5-82-1-57, NUDOCS 8201260042 | |
| Download: ML20040B431 (2) | |
Text
____
l Janua!v 22, 1982 sh' 9
/g y '
4
/s:
Docket No. 50-29
/
-: c u j
LS05-82-01-057
% [D 12 94 %[l[0 /93 hf,
i Mr. Jai.es A. Kay k
l Senior Engineer - Licensing D5[x Yankee Atoaic Electric Cor.pany i
1671 Worcester Road Fra.ningham, Massachusetir 01701 1
j
Dear Mr. Kay:
SUBJECT:
YAHKEE R0WE - SEP TOPIC III-6, " SEISMIC DESIGN CONSIDERATIONS" PEVIEW OF LICENSEE'S SEISMIC PROGPJM PLAN AND REQUEST FOR ADDITIO!4AL INFORMATI0H l
The attached enclosure is a suamary of the revicu of the information (sae I
references t.? the end of the enclosure) you provi fed regarding your program for seismic reavaluation of your plant facility.
It is presented in the forn of a checklist indicating the adequacy of criteria and methodolog)e Unresolved questions are expressed in tms of conments in the summary.
It should be noted that even if the methodologies are deemed adequate I
froat a review of program plan, the application of the proposed trethods nust be reviewed in detail when the analysis results are available.
You are reque:,ted to submit the responses enclosure (excluding comment Nos. 4 and 5)to questions included in thewitnin 45 days of your rec 4
~
this letter.
If the response to any of these questions has been docket-ed, you may respond to the ques +.icn by identifying tria specific reference submittals. Please refer to the topic number in your response.
pc> [
The staff will be contacting you shortly to schedule a eeting to
- [
i J
facilitate our review of your scismic reevaluation resuh s in order to neet the topic conpletion dates for your plant.
tys d bb 1
The reporting and/or recordkeeping requirenents cort ained in this letter
%,Dl affect fewer than ten respondents; therefore, OMB clearance is not required l
under P.L.96-511.
e 8oyb 8201260042 820122 PDR ADOCK 05000029 Sincerely, P
pop i
4 2.ie 5d A
0 AD:SADb i
DC ield GLainas Dennis M. Crutchfield, Chief
~
-l/W82 1/X/82 Operating 'leactors Branch No. 5
- S i
llow-for-additional-congggggggsM Licenshing RW.A 0.@.f.~.
m'N.......ee-prevous-ye
?.PB.Q._
.S.W.:,R n
{
.,. M I. W.... k b h M...
,0qh11..
- RCaf n *. **
SURNM 6,
om >
cc w/encigure: See ne t page 1]6/82,,,,,,l/[//,82,, f.1,n/82,,,
,1,/ h8.2,,,,
...l............
' RRC FORM 318 0 0-80) NRCM Ono i
OFFICIAL RECORD COPY j
~, +.
+
q 4'
y y
Au QJ p..
Docket No. 50-29 LS05-82 Mr. James A. Kay Senior Engineer - Licensing Yankee Atomic Electric Coupany 1671 Worcester Road Framinghan, Massachusetts 01701
Dear Mr. Kay:
SUBJECT:
YANKEE R0WE - SEP TCPIC III-6, " SEISMIC DESIGN CONSIDERATIONS" REVIEW OF LICENSEE'S 3EISMIC PROGRAM PLAN AND REQUEST FOR ADDITIONAL INFORMATION The attached enclosure is a suranary of the review of the information (see refererices at the end of the enclosure) you provided regarding your program for seismic reevaluation of your plant facility.
It is presented in the form of a checklist indicating the adequacy of criteria cad methodology.
Unresolved questions are expressed in tems of coranents in the sumuary.
It should be noted that even if the nethodologies are deemed adequate from a review of program plan, the application of the proposed methods i.ust be reviewed in detail when the analysis results are available.
You are requested to submit the responses to questions included in the enclosure (excluding consnent No. 5) within 45 days of your receipt of this letter.
If the response to any of these questions has been docket-ed, you may respond to the question by ideutifying the specific reference submittals. Please refer to the topic numLer in your response.
The staff will be contacting you shortly to schedule e meeting to facilitate our review of your seismic reevaluation results in order to meet the topic co:pletion dates for your plant.
Sincerely, Dennis M. Crutchfield, Chief Operatina Reactors Branch No. 5 Division of Licensing AD:SA:DL Glainas
Enclosure:
1/ /82 As stated SEPB,[:DL SEPB:DL SEPB:DL, ORB #5:PM.
ORB #5:BC,
emc0
.cc.w/cnc losure:
Py,Ghqk,,
R(lermann.
,WRu s.se],].
. RC.a ru.sa.
.QCr.utchf.iel.d sua = >
See next page M.6/82 1/ 182 1/. /82 1z.,za2..
.lj, f 82,.
~sc rosu am no soi nscu e2.
OFFICIAL RECORD COPY
> usc cis-au sa
Mr. James A.' Kay 3
cc j
Mr. James E. Tribble, President Yankee Atomic Electric Company 1
25 kesearcn Drive j
Westberough, Massachusetts 01581 j
Greenfield Comnanity College 1 College Drive l
Greenfield, Massachusetts 01301 Chairman i
Board of Selectmen Town of Rowe Rowe, Massachusetts 01367 i
Energy Facilities Siting Council 14th Floor One Ashburton Place
' Boston, Massachusetts 02108 1
U. S. Environmental Prote: tion Agency Region 1 Office i
ATTN: Regional Radiation Representative I
i JFK Federal Building Boston, Massachusetts.02203 4
Resident Inspector Yankee Rowe Nu' clear Power Station g
c/o U.S. NRC 1
Po.;t OfTice Box 28 g
Monroe Bridge, Massachusetts 01350 l
5 I
. s.
I 1
i j
I i
1 1
i 6
I
_