Responds to NRC Re Violations Noted in IE Insp Repts 50-443/81-12 & 50-444/81-10.Corrective Actions:Correct Bolting Will Be Installed When Hangers Become Accessible
ML20040B349
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/24/1981
From: Johnson W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20040B347 List:
References
SBN-202, NUDOCS 8201250430
Download: ML20040B349 (3)


Text

.

  • r PUBLIC SERVICE SEABROOK STATION I

Eng.ineedng Office:

Companyof NewHampshire 167I Worcester Road Framingham, Massachusetts 01701 (617) - 872-810(,

December 24, 1981 Sitil-202 T.F.

B 4.2.7 I?ni t ed St at e s Nuc lea r Regulat o ry Commi ssion of fIce of Inspect ton and Enf orcement Region I 631 Pa rk Ave nue Ki ng of Prussia, PA 19406 At tent lon:

Eldon J.

B ru nne r, Chief Project s Brarch No. 1 Division of Resident and Pro jec t Inspection Pe f e re nce s :

(a)

Co ns t ruc t io n Pe rmit s CPPR-13 5 and CPPR-136 Docket Nos. 50-443 and 50-444

( b)

USNRC Let t e r, dated Decembe r 3, 1981, " Inspection No. 50-44 3/81 -12 a nd 50-4 44 /81-10, ' E.

J.

Brunner to W. C. Tallman Subjec t :

Pesponse to Inspection 50-443/81-12 and 50-444/81-10 Dea r lt r.

Brunner:

In response to the violation, which you reported in Reference (b), PSNil of fers the following:

NRC Notice of Violat lon:

(443/81-12-01) 10 CFR 50, Appendix R, Criterion V states, in part, that:

"ac t i vi t ies af f ec t i ng qua l i t y sha ll be... accompli shed i n acco rdance wi t h...

Inspections, p ro c ed u re s, o r d ra w i ng s.

  • The Seabrook Station PSAR for Units 1 and 2 states, i n pa rt, in paragraph 17.1. 5 t ha t :

"Each organi zat ion is required to perf orm t hei r respect ive quallr y related activit ies covered by this program in accordance with docunented instruction, p roc ed u re s, o r d ra w i ng s. "

UEAC d rawi ng ?!805169S, as revised by Engineering Change Authorizations (ECA) 08/1197A and 25/0608A, provides details in sketch SY,-5/14/81-AF for the support of the Conbust i ble Gas Cont rol (CGC) inst rument tubing at 36 support points inside the Unit I containment dome a rea.

8201250430g@h3 PDR ADOCK PDR G

  • United States Nuclear Regulatory Commission December 24, 1981 Attentlon:

Eldon J.

Brunner Page 2 UE6C Sket ch, SK-5 /14 / 81-AF, i l lu s t ra t e s the use of one standard stock pipe clamp w:th two each SA-325, 1/2" diameter bolts per tubing support.

Contrary to t he a bove, a s o f Oc t o be r 14, 1981, o ve r t h i rt y o f t he referenced CGC tubing supports had been erected and accepted by QC inspection with balt s other than the high-st rength SA-325 type installed in each pipe clamp.

This i s a Se ve ri t y Le ve l IV Violation (Supplement II).

Pesponse:

Correc t ive Ac t ion Taken and Result s Achieved Ui:6C Engineering Change Approval (ECA) 08/1197A, dated May 14, 1981, necessitated the p roc u reme n t of clamps wi th special SA-325 bolts for use in the containment dome.

Johnson Cont rols (JCI), the instrumentation and control cont rac t or, prepa red a requisition for the material which was forwa rded t o UE6C (const ruc t ion manager) Home Of fice for ac t lon.

UE6C, in turn, ve rba lly ordered the clamps wi th SA-325 bolts and requested that the order be on site by July 1, 1981.

The ha rd wa re (st anda rd bolt s vs. SA-325) was received by the site rec e i vi ng inspection group prior to their rec e i p t of a copy of the change order containing the information that the vendor was to supply standard clamps with special bolting.

Receiving i nspec t ion was pe rf ormed usi ng the product specification as the acceptance standa rd vs. the change o rder specia l requ i reme n t s.

When JCI recei ved the i nc o r rec t ha rdwa re from UE6C, they presumed that it had been properly ordered and receipt inspected and subsequently installed the hangers.

JCI issued their NCR No. 002 (10/16/81) when they became aware of the p ro b l e m.

Correct bolting has been reordered and will be installed when the hangers become accessible.

The dome, f abricated at ground level, is now in place atop the containment.

Yankee will track this condition by use of its' future ve ri f icat ion items system to assure that this condition i s correc ted.

UE6C has conducted training sessions for all parties concerned where it was emphasized that their act ivi t ies must be conducted using proper documentation (i.e., specification, pu rcha se o rd e r, c ha nge o rd e r s, bills of material) and not verbal Instruction.

JCI has Instructed their personnel of the importance of checking material requi rements when prepa ri ng work inst ruct ions prior to installation.

Co r re c t i ve action will be completed when the correct bolting is received and the af f ec t ed ha ngers become accessible f or change-out.

Ve ry t ru ly yours, YANKEE ATOMIC ELECTRIC COMPANY

@A U. P.

Johnson VicY President

t e

United States I:uclear Regulatory Conmission December 24, 1981 Attention: Eldon J. Brunner Page 3 CO!!'10NUEALTH OF MASSACilUSET TS)

)ss 211DDLESEX COUNTY

)

~ hen personally appeared before me, U.

P. Johnson, who, being duly sworn, did state that he is a Vice Pre s i de n t of Yankee Atomic Elec t ric Company, that he is duly authorized to execute and iile the foregoing request in the name and on the behalf of Public Service Company of New 11ampshire and that the statement. t he re i n a re t rue to the best of his knowledge and belief.

e jf

'1 7

LfUlt<l($x?f,tyyy%f g.I.b..k,4 /g At len L. Leg 1!nd re, Jr. ;j Notary Pahlic Jg,

ty Commission Expires August 5, 1988

[[g,, top *.(

.Y f Yr-z :6 0 i,m 1

-v...

& *,fy s,..j

('C y'-Q..*ik ft,l,h,.h'/

l' *

.a.

b2

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _