(;..e u -
~
e C0tYilTHEhTC0fiTROL-W0/A WPPSS cORREsPONDEacE NO._
ROUTZNG-WO/A SITE FTLES-80/A WG ALBERT /NRC-W/A' d
DR C000Y-W/A o
[
JJ DORAN-WO/A RB GLASSC0CK/280-W/A g
CE LOVE-WO/A Docket fiumbers 50-508 and 50-509 uk 00 0'SULLIVAN/270-W/A-RG PECK-W/A l
DL QUAMME-WO/A JP SLUKA-W/A gJanuary 11, 1982 OE TPAPP-WO/A G03-82-021 1
JE WERLE-WO/A x
GC SORENSEN/4d0-W/A S
W
\\
's.
6 I
U. S. fluclear Regulatory Commission," Region V 9
E Office of Inspection and Enforcement m
1450 Maria Lane, Suite 260 7.
Walnut Creek, California 94596-5368 8 k s
a
,s Attention:
Mr. B. H. Faulkenberry
\\
- 5
{
g Chief, Reactor Construction r j'c Bru N
h
Subject:
PROJECT NOS. 3 AND C s
INTERIM REPORT OF [0T *Ti L.10 CR. '55 e) 8 1
ARTIFICIAL ENHANCER
" oADIO P'
FILM (0/N #41) u-t g,M R50.55(e), Region V was no'ti~-
M In accordance with the provisions O
fied on December 1,1981 of potentiaf ceficiencies, concerning artifi-1 cial enhancem _ fit of penetrameter images on radiographic film.
g b
C a Evj) gly System approved Interim Report that p'rovides' a Attached is \\f tFf deficiency and proposed resolution to the problem.
description E
provided by March 31, 1982.
A '-' nal Repor i,
o
=
O Sholavouhave\\,yquestionsordesirefurtherinformation,please f[ ;
\\{
contu-t v ectly.
}
R. S.(f adick (1000) 1 Program Director, WNP-3/5 t
5 CRC /tt g
i u
Attachment g
'l cc:
J. Adams - NESCO-UO/A j,5 D. Smithpeter - BPA-WO/A pr l"ll"
- 3 8 Ebasco - New York-WO/A I
WMP-3/5 Files - Richland-WO/A l
8201250357 820113 PDR ADOCK 05000508 S
=-i--
Attachment to Letter G03-82-021 Dated January 11, 1982 a
Artificial Enhancement of Radiographic Film (D/N #41)
Potential Problem On October 12, 1981, italpractice in the form of mechanically enhanced pene-trameter images was identified on station piping spool radiographs sub-aitted to the Ebasco Quality Assurance Engir.eering Department f1DE Group by Associated Piping and Engineering Corporation (AP&E), Compton, Califor-nia.
On October 16, 1981, the deficiency was documented on an fiCR which was sent to AP&E via telecopy, followed with the original by mail.
Proposed Resolution / Corrective Action The following actions are to be taken to establish the scope of the arti-ficial enhancement and to identify the affected spools for rework:
(1) AP&E to establish the cause and extent of the identified malpractice.
(2) AP&E to review all radiographic film for the period identified by
,the above action.
(3) AP&E to re-radiograph all welds with enhanced film in their possession and resubmit to Ebasco for review.
(4) Ebasco Site f4DE personnel to review all AP&E, Compton radiographs currently on site to determine whether enhancement had occurred on earlier radiographs and if so, to identify affected welds.
l (5) Any affected welds on spools on the Project Site are to be documented on an fiCR.
These welds are to be re-radiographed by an flDE Contractor, and submitted to Ebasco for review.
Status of Proposed Resolution / Corrective Action j
(1) The AP&E Level II interpreter has admitted to performing the enhance-1 ment during a period of four to six weeks prior to the discovery by I
Ebasco.
The questionable film primarily concerned thin wall stain-less materials.
The interpreter has been discharged from his duties.
Subsequent investigations ha.ve revealed that the mechanical enhance-ment actually took place from liay 15, 1981 to October 12, 1981 and only one individual had taken part in the matter.
1 (2) AP&E reviewed all radiographic film in their possession regardless of performance date and identified those spools requiring re-radio-graphy.
Ebasco also reviewed these films and concurred with AP&E.
(3) AP&E has re-radiographed identified spools currently in their custody and these radiographs have been reviewed and accepted by Ebasco.
(4) Ebasco Site fide Personnel have reviewed all AP&E - Ccmpton film on j
Site and those spools with enhanced radiographs have been identi-i fied on an f1CR.
This review also determined that the problem dated l
back to fiay 15, 1981.
4 e
5 Attachment to Letter G03-82-021 Page 2 Dated January 11, 1982 Status of Proposed Resolution / Corrective Action (Continued)
(5) A Site f4DE Contractor has been directed to re-radiograph all but two of the spools. AP&E has substituted enhanced film of these spools with acceptable file film.
l Final Report Delay i
Since the affected pipe spools are in the possession of-both the vendor and site contractor, considerable interface effort is required to re-solve the problem.
Consequently, additional time is required to com-plete the proposed resolutions. A final report will be provided by i
March 31, 1982.
=