ML20040B288

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Artificial Enhancement of Radiographic Film Initially Reported 811201.Mechanical Enhancement Took Place from 810515 to 1012.Interpreter Discharged.Final Rept Expected by 820331
ML20040B288
Person / Time
Site: Satsop
Issue date: 01/11/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20040B287 List:
References
10CFR-050.55E, 10CFR-50.55E, G3-82-21, GO3-82-021, GO3-82-21, NUDOCS 8201250357
Download: ML20040B288 (3)


Text

(;..e u -

~

e C0tYilTHEhTC0fiTROL-W0/A WPPSS cORREsPONDEacE NO._

ROUTZNG-WO/A SITE FTLES-80/A WG ALBERT /NRC-W/A' d

DR C000Y-W/A o

DE 00BSGN-WO/A

[

JJ DORAN-WO/A RB GLASSC0CK/280-W/A g

CE LOVE-WO/A Docket fiumbers 50-508 and 50-509 uk 00 0'SULLIVAN/270-W/A-RG PECK-W/A l

DL QUAMME-WO/A JP SLUKA-W/A gJanuary 11, 1982 OE TPAPP-WO/A G03-82-021 1

JE WERLE-WO/A x

GC SORENSEN/4d0-W/A S

W

\\

's.

6 I

U. S. fluclear Regulatory Commission," Region V 9

E Office of Inspection and Enforcement m

1450 Maria Lane, Suite 260 7.

Walnut Creek, California 94596-5368 8 k s

a

,s Attention:

Mr. B. H. Faulkenberry

\\

5

{

g Chief, Reactor Construction r j'c Bru N

h

Subject:

PROJECT NOS. 3 AND C s

INTERIM REPORT OF [0T *Ti L.10 CR. '55 e) 8 1

ARTIFICIAL ENHANCER

" oADIO P'

FILM (0/N #41) u-t g,M R50.55(e), Region V was no'ti~-

M In accordance with the provisions O

fied on December 1,1981 of potentiaf ceficiencies, concerning artifi-1 cial enhancem _ fit of penetrameter images on radiographic film.

g b

C a Evj) gly System approved Interim Report that p'rovides' a Attached is \\f tFf deficiency and proposed resolution to the problem.

description E

provided by March 31, 1982.

A '-' nal Repor i,

o

=

O Sholavouhave\\,yquestionsordesirefurtherinformation,please f[ ;

\\{

contu-t v ectly.

}

R. S.(f adick (1000) 1 Program Director, WNP-3/5 t

5 CRC /tt g

i u

Attachment g

'l cc:

J. Adams - NESCO-UO/A j,5 D. Smithpeter - BPA-WO/A pr l"ll"

3 8 Ebasco - New York-WO/A I

WMP-3/5 Files - Richland-WO/A l

8201250357 820113 PDR ADOCK 05000508 S

PDR

=-i--

Attachment to Letter G03-82-021 Dated January 11, 1982 a

Artificial Enhancement of Radiographic Film (D/N #41)

Potential Problem On October 12, 1981, italpractice in the form of mechanically enhanced pene-trameter images was identified on station piping spool radiographs sub-aitted to the Ebasco Quality Assurance Engir.eering Department f1DE Group by Associated Piping and Engineering Corporation (AP&E), Compton, Califor-nia.

On October 16, 1981, the deficiency was documented on an fiCR which was sent to AP&E via telecopy, followed with the original by mail.

Proposed Resolution / Corrective Action The following actions are to be taken to establish the scope of the arti-ficial enhancement and to identify the affected spools for rework:

(1) AP&E to establish the cause and extent of the identified malpractice.

(2) AP&E to review all radiographic film for the period identified by

,the above action.

(3) AP&E to re-radiograph all welds with enhanced film in their possession and resubmit to Ebasco for review.

(4) Ebasco Site f4DE personnel to review all AP&E, Compton radiographs currently on site to determine whether enhancement had occurred on earlier radiographs and if so, to identify affected welds.

l (5) Any affected welds on spools on the Project Site are to be documented on an fiCR.

These welds are to be re-radiographed by an flDE Contractor, and submitted to Ebasco for review.

Status of Proposed Resolution / Corrective Action j

(1) The AP&E Level II interpreter has admitted to performing the enhance-1 ment during a period of four to six weeks prior to the discovery by I

Ebasco.

The questionable film primarily concerned thin wall stain-less materials.

The interpreter has been discharged from his duties.

Subsequent investigations ha.ve revealed that the mechanical enhance-ment actually took place from liay 15, 1981 to October 12, 1981 and only one individual had taken part in the matter.

1 (2) AP&E reviewed all radiographic film in their possession regardless of performance date and identified those spools requiring re-radio-graphy.

Ebasco also reviewed these films and concurred with AP&E.

(3) AP&E has re-radiographed identified spools currently in their custody and these radiographs have been reviewed and accepted by Ebasco.

(4) Ebasco Site fide Personnel have reviewed all AP&E - Ccmpton film on j

Site and those spools with enhanced radiographs have been identi-i fied on an f1CR.

This review also determined that the problem dated l

back to fiay 15, 1981.

4 e

5 Attachment to Letter G03-82-021 Page 2 Dated January 11, 1982 Status of Proposed Resolution / Corrective Action (Continued)

(5) A Site f4DE Contractor has been directed to re-radiograph all but two of the spools. AP&E has substituted enhanced film of these spools with acceptable file film.

l Final Report Delay i

Since the affected pipe spools are in the possession of-both the vendor and site contractor, considerable interface effort is required to re-solve the problem.

Consequently, additional time is required to com-plete the proposed resolutions. A final report will be provided by i