ML20040B082
| ML20040B082 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/05/1982 |
| From: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8201250119 | |
| Download: ML20040B082 (1) | |
Text
.. -
)
JAN 5 1982 Docket No. 50-328 9
JO
-9 f
JAN 5i382>. ;
% m ma g Tennessee Valley Authority 1 ".if ?"
ATTH: Mr. H. G. Parris V
2yp'";fb O
Manager of Power 500A Chestnut Street - Tower II Chattanooga, Tennessee 37401 Gentlemen:
On June 25, 1981, the Commission issued Operating License DPR-79 (partial power) for the Sequoyah Huclear Plant, Unit 2.
On September 15, 1931 the licenso was amended to authorize full power (100%) operation. As required by 10 CFR 170.21, an operating license fee of $302,800 was paid for the issuance of the operating license.
In accordance with Footnote 3 of Section 170.21, the costs incurred in the processing and issuance of the Sequoyah 2 operating license have been reviewed and they substantially exceed the maximum fee of $302,800 prescribed by the Commission's regulations. Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for Sequoyah 2.
Sincerely, l
Odrinal Elmed by Wia. O. M2cr William 0. Miller, Chief License Fee Management Branch Office of Administration l
DISTRIBUTION:
Docket File (White copy w/cy of memo to files with backup info.) /
PDR LPDR I
Manpower File CJHolloway, LFMB RMDiggs, LFMB KLKohler, LFMB LFMB R/F (2) h Jehl h
8201250119 8101 OF FICE )
g SURP3AME ).MQuJ eC.h5i..h
))QhaM.
..W0.W1ler...
PDR ADOCK 05000
.12/Ol.81,,,,,,,,, 1,j !,.,. f 8g,,,, 1,
/ 81
,,,, f,
,l, oarE )
! unc ronu ais00-803 nacu o24a OFFiClAL RECORD COPY usa m - --n3 wo L
__.,