Forwards Request for Addl Info Re Equipment Environ Qualification Review.Licensee Should Provide Response within 30 Days of Ltr Date
ML20040B081
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/11/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
LSO5-82-01-023, LSO5-82-1-23, NUDOCS 8201250118
Download: ML20040B081 (4)


Text

-

o>

c 4

January 11, 1982 DCQ DISTRIBUTION-J4 4

Docket Ho. 50-2i3

,Dockit y 01&E (3)

- ah. 2 2/

~~

LS05-82-01-023 A

NRCPDR ACRS

$~

A-N' Q,I:ar E

LPDR SEPB PM Mr. U. C. Counsil, Senior Vice President TERA 0 ELD Uuclear Engineering and Operations N SIC ORB #5 PM

/

Connecticut Yankee Atonic Power Company ORB #5 RF HSmith 4

ro Post Office Box 270 Glainas Hartford, Connecticut 06101

Dear Mr. Counsil:

Sil"J ECT : ENVIRONMENTAL 00AllFICATION OF SAFETY-RELATED ERClRICAL E0HIPi:ENT REOUEST FOR ADDITICMAL INFOR"ATION RE:

HADDMt NECK PLANT We have completed a preliminary review of your response to our Safety Evaluation concernina the Environmental Oualification (E0) of Safety-Related Electrical Equipment. Our contractor (Franklin Research Center) has identified infornation, in nost cases references from your subnittals, which we need in order to complete. our review. This infornation should all be contained in your E0 central file. For this parpose, the requested infornation can be taken fron your E0 central file and provided to our contractor. Upon conoletion of the review the information will be re-turned to you for replacenent into the E0 central file.

We roquest that you supply this information to us within 30 days of the data of this letter. Please send a full subnittal to Franklin Research Center (address in Enclosure 2) and a copy of the cover letter to us.

Address the letter to the Operatinn Reactors Rranch. Please contact your Project Manager for further assistance in this regard.

The reportinq and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents.

Therefore, Ota clearance is not required under Public Law 96-511.

Si nce rely, Original signed by Derrnis M. Crutchfis1d Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Enclosures:

1.

Request for Additional Infernation hijDOCK5011e g20113 2.

FRC Information 05000213 p

PDR cc w/ enclosures:

D,L.;0@h/,[A D(.:0RBg5/P,hDL C

omcq HS. jjh',,,,,,,, CTropf,g [ DC

,chfyeid suamuo

.. l... !.!.0.2.....l...!.b!.02

../.!!!!.02..

omn OFFICIAL RECORD COPY use.ra. issi_23530o NHC FORM 316 (10-fl0) NnCM 024a

Mr. W. G. Counsil January 11, 1982 cc w/ enclosure:

Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent Haddam Neck Plant RFD #1 Post Office Box 127E East Hampton, Connecticut 06424 l

Mr. Richard R. Laudenat Manager, Generation Facilities Licensing t

I l

Northeast Utilities Service Company l

P. O. Box 270 l

Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Town Hall Haddam. Connecticut 06103 Connecticut Energy Agency ATTN: Assistant Director Research and Policy l

Development Department of Planning and i

Energy Policy 20 Grand Street Hartford, Connecticut 06106 U. S. Environmental Protection Agency Region 1 Office ATTN: Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station c/o U. S. NRC East Haddam Post Office East Haddam, Connecticut 06423

ENCLOSURE 1 REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR: REACTOR RECULATION' EQUIPMENT ENVIRONMENTAL QUALIFICATION e

HADDAM NECK DOCKET N0. 50-213 e

1.

In reference to the licensee's 90-day response'(2) to othe NRC SER (3),

a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceed:

A.

General Atomic Company, Test Report E-254-960, Rev.1. dated 5/1/81,

" qualification of Analog High Range Radiation Monitor"; Licensee Reference 64.

B.

Babc6ck & Wilcox, Valve Monitoring System Test Program dated 3/21/80; Licensee SCEWS D-1-9.

References:

I

1.. W. G. Counsil-(CYAPCo) letter to D. G. Eisenhut (NRC), "Haddam Neck Plant - Environmental Qualification of Electrical Equipment - Revised Appendix I to October 31, 1980 Submittal", dated 6/1/81.

2.

W. G. Counsil (CYAPCo) letter to D. 6. Eisenhut (NRC), "Haddam Neck Plant - Retponse to SER fnr Environmental Qualification of Electrical Equipm;at", dated 9/3/81.

3.

Office of Nuclear Reactor Regulation Safety Evaluation Report for Haddam Neck, " Environmental Qualification of Safety-Related Electrici Equipment (NRC)", dated 5/29/81.

o 4

4 e

e 4

4

l ENCLOSURE 2 IRC MAILING ADDRESS AND TELEPHONE INFORMATION Mr. Cyril J. Crane Franklin Research Center t

The Parkway at Tvcntieth Street l

Philadelphia, Pennsylvania 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 l

l 0

9