ML20040A858

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revision 2 to Emergency Plan Implementing Procedure 550-2, Environ Emergency Kit: Radiological Equipment. Change Request Form Encl
ML20040A858
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/16/1981
From: Pliml G
COMMONWEALTH EDISON CO.
To: Harold Denton
NRC
Shared Package
ML20040A849 List:
References
A-81-207, NUDOCS 8201220232
Download: ML20040A858 (3)


Text

_.

1 l CRa A-81-207 EPIP 550-2 i i t

December 16, 1981 Care i

Mr.

. + e $_)

/

t

'k$ 5/ cf the fica Statics:

j Tou have copy (s) No.

1 FEI - Fuel Eandling P ccedure i

SOI - Cperating P cedure ECP - E=e:gency Cperating P ccedure p

GOP - General Cperating P ccedure TSS - Technical Staff Surveillance ZAP - Ae* 4.istrative Precedre d

CP - Che=ical P ccedure RP - Radiatien P cteetien Precedure DECIO Mlb.4 MI - W tenance Precedure P

ZCP - Zicn Quality P ccedre altuur ACP - Ahncm1 Operating P: ced=a ZSP - Seccity Plan & SecuY.t7 Precedure PT - Cpera*d g Serveillanca Test "i

Tech Scec. - Technical Specification g

^.

Cc:ve Scck Annunciater Respense Manual Refueling-Master P ccedure & Fuel Ivaluation Precedure

(

\\-

GSIP - Generating Statien E=ergency Precedure EPIP - Emergency Plan I=plementing P cced=a Y

FSAR - Final Safety Analysis Report

ZD - 310: Electrical Dis ributics

+

indicated aheve and ret==Please ack:cwledge receipt of the peccednre or revisiens Sta~ den.

chis receipt,to Ms. M.A. LaPage, Zica

  • Please revise per attached changes to EPTP 550-2, pgs. 1 thru 7.

Rev. 0,1& 2.

December 15, 1991

/

f h,

G. Pi-1

  • P ccedre c revisiens indicated abcvs received:

Caa L

$$01$$o!k0 F

/

f l

VN

(

I ZAP 5-514 d

~

Rev O I STATION PROCEDURE CHANGE REQUEST gets $1 CHANGE A/"7 'ff-]C]

Procedure Intent changes require Station Rev! eve before using.

REQUEST Procedure changes with prior Station Review do not need SRO approvat.

"uassa

&,-et hg b#

I NUMBER.

PROCEDURE TITLE V

Temp raryChange O

Permanent Change Expiration Date New Procedure O

r Plant Condition Special Procedure O

Desired Effective Permanent Change Needed IO[tf[F /

Date Yes O No O Brief Description N

Reason for change wik a & ' GF WMA t

l Y

&L 4A.L, l

Cb/M Date Department Requested By Temporary Change Approval (No intent change.14 days review)

Dept. Supervisor Date SRO Date Station Review Copy FORM 5 514 N

~~

~

s

.,e j

Is a change to the Technical Specifications needed?

Yes No

- Is the probability of an occurrence or the consequence of an accident or i<

malfunction of equipment important to saf ty as previously evaluated in the SAR increased?

Yes No.

N Secause:

W f

N D

?

d ess n' M Mme M,

af a &

O a

f <' r r

n rw i

Is the possibility for an accident or malfunction of a different type than any previously evaluated in the SAR created? Yes No M Because:

& a,f, Y 4'

Is the margin of saf ty, as defined in the basis for any Technical -

l Specification, reduced? Yes No ( Because:

b e-[*'M

.)

l Date Prepared By Permanent Review Temporary Review S/pathrg) Date,p' Appr. Not Appr.

NE lzi / $7<7/E O

Signature Date Appr.

Not Appr.

O a i.

ww v:-

s a.)

M Q

Q Q

Q

' I /7 /

Q

@rW ' i 2lI1 Station Superintendent:

If not approved, explain:

((Nym

/2-IS*E Station Superintendent Appr. Date Effective Date (if different from (Appr. for perm use) appr. date)

-