ML20040A858
| ML20040A858 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 12/16/1981 |
| From: | Pliml G COMMONWEALTH EDISON CO. |
| To: | Harold Denton NRC |
| Shared Package | |
| ML20040A849 | List: |
| References | |
| A-81-207, NUDOCS 8201220232 | |
| Download: ML20040A858 (3) | |
Text
_.
1 l CRa A-81-207 EPIP 550-2 i i t
December 16, 1981 Care i
Mr.
. + e $_)
/
t
'k$ 5/ cf the fica Statics:
j Tou have copy (s) No.
1 FEI - Fuel Eandling P ccedure i
SOI - Cperating P cedure ECP - E=e:gency Cperating P ccedure p
GOP - General Cperating P ccedure TSS - Technical Staff Surveillance ZAP - Ae* 4.istrative Precedre d
- CP - Che=ical P ccedure RP - Radiatien P cteetien Precedure DECIO Mlb.4 MI - W tenance Precedure P
ZCP - Zicn Quality P ccedre altuur ACP - Ahncm1 Operating P: ced=a ZSP - Seccity Plan & SecuY.t7 Precedure PT - Cpera*d g Serveillanca Test "i
Tech Scec. - Technical Specification g
^.
Cc:ve Scck Annunciater Respense Manual Refueling-Master P ccedure & Fuel Ivaluation Precedure
(
\\-
GSIP - Generating Statien E=ergency Precedure EPIP - Emergency Plan I=plementing P cced=a Y
FSAR - Final Safety Analysis Report
- ZD - 310: Electrical Dis ributics
+
indicated aheve and ret==Please ack:cwledge receipt of the peccednre or revisiens Sta~ den.
chis receipt,to Ms. M.A. LaPage, Zica
- Please revise per attached changes to EPTP 550-2, pgs. 1 thru 7.
Rev. 0,1& 2.
December 15, 1991
/
f h,
G. Pi-1
- P ccedre c revisiens indicated abcvs received:
Caa L
$$01$$o!k0 F
/
f l
VN
(
I ZAP 5-514 d
~
Rev O I STATION PROCEDURE CHANGE REQUEST gets $1 CHANGE A/"7 'ff-]C]
Procedure Intent changes require Station Rev! eve before using.
REQUEST Procedure changes with prior Station Review do not need SRO approvat.
"uassa
&,-et hg b#
I NUMBER.
PROCEDURE TITLE V
Temp raryChange O
Permanent Change Expiration Date New Procedure O
r Plant Condition Special Procedure O
Desired Effective Permanent Change Needed IO[tf[F /
Date Yes O No O Brief Description N
Reason for change wik a & ' GF WMA t
l Y
&L 4A.L, l
Cb/M Date Department Requested By Temporary Change Approval (No intent change.14 days review)
Dept. Supervisor Date SRO Date Station Review Copy FORM 5 514 N
~~
~
s
.,e j
Is a change to the Technical Specifications needed?
Yes No
- Is the probability of an occurrence or the consequence of an accident or i<
malfunction of equipment important to saf ty as previously evaluated in the SAR increased?
Yes No.
N Secause:
W f
N D
?
d ess n' M Mme M,
af a &
O a
f <' r r
n rw i
Is the possibility for an accident or malfunction of a different type than any previously evaluated in the SAR created? Yes No M Because:
& a,f, Y 4'
Is the margin of saf ty, as defined in the basis for any Technical -
l Specification, reduced? Yes No ( Because:
b e-[*'M
.)
l Date Prepared By Permanent Review Temporary Review S/pathrg) Date,p' Appr. Not Appr.
NE lzi / $7<7/E O
Signature Date Appr.
Not Appr.
O a i.
ww v:-
s a.)
M Q
Q Q
Q
' I /7 /
Q
@rW ' i 2lI1 Station Superintendent:
If not approved, explain:
((Nym
/2-IS*E Station Superintendent Appr. Date Effective Date (if different from (Appr. for perm use) appr. date)
-