BELATED COlil'E. u,wa UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION rK: ;-

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

'82 JAN 15 P4 :53

(:

In th'6tMatterlof

)

G NCH

)

PACIFIC GAS AND ELECTRIC COMPANY

)

Docket No. 50-275

)

Docket No. 50-323 Diablo Canyon Nuclear Power Plant,

)

Units 1 and 2

)

(Full Power Proceeding)

)

APPLICANT PACIFIC GAS AND ELECTRIC COMPANY'S SUPPLEMENT TO JOINT INTERVENORS' SECOND REQUEST FOR PRODUCTION OF DOCUMENTS The documents listed are available for inspection and/or copying at Pacific Gas and Electric Company headquarters durin normal business hours.

PGandE requests one day's notice fo [sYaffing

[x,

.s purposes whenever counsel desire to review the documents. ff/

3 y

e.

s, Respectfully submitted,

~~

~

MALCOLM H. FURBUSH PHILIP A. CRANE, JR.

,x/

RICHARD F. LOCKE Q - p '

Pacific Gas and Electric Company P. O.

Box 7442 San Francisco, California 94120 (415) 781-4211 ARTHUR C. GEHR Snell & Wilmer 3100 Valley Bank Center Phoenix, Arizona 85073 (602) 257-7288 BRUCE NORTON Norton, Burke, Berry & French, P.C.

3216 N. Third Street Suite 300 5g Ph enix, Ariz na 85012-26n 9

(602) 264-0033 5

i f(

Attorneys for l

P i

Gas and E tr' ompany l

t-8201220176 820111 c

DR ADOCK 05000 Q

Phili K. Crane Jr.

Dated:

January 11, 1982

I SUPPLEMENT TO JT. INTERVENORS 2nd RE' QUEST FOR PRODUCTION,OF DOCUMENTS - EPRI Doc. No.

DATE Frosa/To/ Entity Doc. Type Doc. Description MNED 0098927 12/10/30 JJCarey/EPRI Memo Tech. & Licensing contrcts EPRI/PWR 1 pg.

DVRelly/PCLE S/RV Test Prog.

IS-3 MNED 0098928 12/15/80 RCYoungdahl/EPRI Ltr rpt Pwr Utilities position on NUREG 0737 6 pgs.

DGEisenhut/NRC J2-3,5 MNED 0099936 12/10/80 JJCarey/EPHI Memo Attached responsen prepared by EPRI I pg.

Tech. & Licensing contracts valve proj. stati 18-3 EPRI/PWR S/RV test prog.

MNED 0098959 10/22/80 JJCarey/EPRI Memo List identifying individuals respons-Ible for activities of PWR S/RV test 2 pgs.

prog.

IS-3 MNED 0098960 9/4/80 BWShackelford/PGEE Letter Payment schedule for Phase I ?.PRI PWR S/RV test. prog.

1 pg.

DSaxe/EPRI IS-3 o

MNED 0098966 9/4/80 BWShackelford/PGEE I,e tte r Payment schedule & added costs for Phase I EPRI PWR S/RV test prog.

DSaxe/EPRI MNED 0098979 1/80 No Name/EPRI Report C-E/EPRI for S/RV test prog. Fac!!1ty 11 pgs/

deduced specs 18-3,5 f*NED 0098989 11/10/80 AJWheeler Letter EPPI Mtg scheduled to familiarize 1 pg.

Architect Eng. & Consulting architects-enge w/ prog.

cosepanies IS-3,5 MNED 0098990 12/5/80 No Name/EPRI Agenda EPRI S/RV Prog. review 3 pga.

IS-3 f

MNED 0098993 10/10/80 JJCarey/EPHI Letter Summary of results 1 pg.

Tech. contracts, partie.

IS-3 utilities attendees

2 poc. No.

_DATE_

From/To/ Entity Doc. Type Doc. Deicription HNED 0098994 9/23/80 No Name/EPRI List Utility /EPRI/S/RV Test prog.

3 pg.

9/23/00 mtg IS-3 MNED 0098995 9/23/80 No Name/EPRI Agenda FWR S/RV test prog. utility review I pg.

mt 9/23/80 IS-3 MNED 0098996 9/00 No Name/EPRI Report PWR S/RV test prog.

88 pgs.

IS-3 MNED 0099109 9/23/80 J FH/ PGE E Ager>3 a PWR S/RV test prog. utility review I pg.

utg 18-3 MNED 0099110 9/80 No Name/PGEE Report PWR S/RV test prog.

87 pgs.

IS-3,5 MNED 3099197 7/30/80 TEAuble/EPRI I,etter EPRI contacted PGEE & Westinghouse 1 pg.

Jim McCracken/

elect. Corp. proj. dept. res Masonellan pwr operated relief valves 18-3,5 MNED 0099198 10/3/80 JJCarey/EPRI Letter Attached-status rpt for the PWR S/RV 1 pg.

test prog.

IS-3 MNED 0099199 10/80 JJCarey/EPRI Report PWR S/RV test prog, description & status 49 pgs.

IS-3,5 MNED 0099248 10/7/80 JJCarey/EPRI I,e t te r Attached-list provided tech licensing E exec. contacts for PWR S/RV test prog.

1 pg.

15-3,5

3 Doc. No.

DATE From/To/ Entity Doc. Type Doc. Ducription MNED 0099249 9/B/80 JJCarey/EPRI List Draf t PWR S/RV test prog. Licensing, 12 pgs.

tech. & exec. contacts participating utilities IS-3,5 MNED 0099261 7/3/80 JJCarey/EPRI I,etter Attached revision of prog. plan for 1 pg.

performance evaluation of PWR S/RV submitted to NRC IS-3,5 MNED 0099262 7/1/00 JJCarey/EPRI Report Prog. plan for the performance testing 107 pgs, of PWR S/RV IS-3,5

.MHED 0099369 7/28/00 Bruce King / Westinghouse Letter Attached copy of rev. 1 (7/1/80) of I pg.

SMSkidmore/PGEE EPRI Prog. plan for the performance testing of PWR S/RV IS-3,5 MNED 0099370 7/1/00 Bruce King / Westinghouse Report Prog. plan for the perf. testing of 107 pgs.

PWR S/RV 18-3,5 f

I

4 i

tg Blo.

DATE_

From/To/ Entity Doc. Typs Doc. D1tsrcriptibn MNED 0099478 5/29/81 JJCarey/EPRI Memo EPRI/PWR Safety & Relief Valve Test Program 1 pg.

Dist. List /EPRI testing activities for periot of 5/26-29 IS-3 MNED 0099479 5/26/81 JJCarey/EPRI Memo Transmits Table of Contents & brief 1 pg.

Dist. List /EPRI description of Interim Data Rpt being complied for Safety.& Relief Valve Test Program, plus IS-3,5 2 attachs.

MNED 0099480 5/81 No Name/EPRI Table of Cont.

Attach. 11 EPRI/PWR Safety & Relief Valve Test Program Interim Data Rpt.

1 pg.

18-3,5 MNED 0099481 5/91 Mn Name/EPRI Rpt Content Attach. 12 EPRI/PWR Safety & Relief Valve 1 pg.

Description Test Program Interim Data Rpt Description 18-3,5 MNED 0099482 5/22/81 JJCarey/EPRI Memo EPRI/PWR Safety & Relief Valve Test Program Dist. List /EPRI testing activities for the perior 5/18-22 2 pga.

18-3,5 MNED 0099483 5/14/81 DVEelly/PGEE Letter Corrections on 1tr dated 4/1/01 "SGPORV" I pg.

RMLaverty/PGEE corrected to " pressurizer PORV" & both IS-5 TAuble/EPRI model numbers pertain to same valve computer error.

MNED 0099484 4/1/01 DVKelly/PGER Letter Information concerning SGPORV block valves 1 pg.

RMLaverty/PGER TAuble/EPRI IS-5 MNED 0099485 5/13/81 TEAuble/EPRI Letter Transmits sections of what will be the 2 pga.

GWu/PGEE Marshall Steam Station draft test rpts for PORV's & Block Valves w/5 attache.

IS-3,5

.~.

DATE From/To/Esitity Doc. Type Doc. D*peription Ig:

430.

MNED 0099487 4/22/81 No Name/EPRI Draft Rpt Attach. il Sec. 2.3.1 Evaluation Test Pro-cedures Description of Marshall Steam Station 5 pqs.

Evaluation Test Operations perforsned on PORV's & block valves tested by EPRI 18-3,5 MNED 0099492 4/22/01 No Name/EPRI Draft Rpt Attach. 92 Sec. 3 Valve Test Results Intro Description of rpt formate & content for each 3 pgn.

valve test rpt IS-3,5 MNED 0099495 4/22/81 No Name/EPRI Draft Rpt Attach. 13 Sec. 3.1 Draft Test Rpt of Velan Block Veive Model representative of PC&E DC 11 pga.

Block Valve IS-3,5 MNED 0099506 4/22/81 No Name/EPRI Draft Rpt Attach. 14 Sec. 3.5 Draft Test Ppt of Nasonellan PORV snodel tepresentative of 13 pgs.

PC&E DC PORV.

18-3,5 MNED 0099518A 4/22/81 No Name/EPRI List Attach. 15 PORV Screening Criteria I pg.

IS-3,5 MNED 0099523 5/8/81 TEAuble/EPRI Hemo Disseminates date for PORV teste performed 1 pg.

Dist. List /EPRI at Wyle labs, w/2 attachs.

18-3,5 h

1

h e

Doc. No.

DATE Fron-/To/ Ent i ty Doc. Type Doc. Drscription HNED 0099524 4/30/91 No Name/EPRI Supuna ry Attach, il EPRI/PWR Safety & Relief I pg.

deduced Valve Test Program Summary IE-3,5 K4ED 0099525 4/30/81 SHChi/EFRI Data Sununary PORV Tent 7-TR-7W for test on 4/29/81 4 pga.

WClark/Wyle I.ab (deduced)

Sheet IS-3,5 MNED 0099530 5/1/81 JJCarey/EPRI Memo EPRI/PWR Safety & Relief Valve Test I pg.

Dist. I.is t/ EPRI Program testing activities for 4/28-5/1 IS-3 MNED 0099531 4/10/81 JJCarey/EPRI Memo EPRI requesting block valve info to 1 pg.

Tech & Licensing Contacts devciop block valve action plan for NRC w/attachs.

18-3,5 MNED 0099532 4/8/81 No Name/EPHI List List of Attendeer 1 pg.

IS-3,5 MNED 0099533 4/8/81 TEAuble/EPRI Mtg. Mins.

Re NUREG 0737 re: Block Valve 10 pgs.

IS-3,5 MNED 0099543 4/7/81 JJCarey/EPRI Imtter EPRI/PWR Valve Test Program-Test 3 pgn.

DVKelly/PG&E Condition Justification w/ attach.

IS-3,5 s

[

Doc.

No.,,,,

l) ATE From/To/ Entity Doc. Type Doc. Description MNED 0099546 3/20/81 Jilos t er / EPHI Reprot Attach. I EPRI/PWR Safety & Relief 37 pga.

deduced Valve Test Program Test Condition Justi fication Surisaary IS-3,5 MNED 0099583 4/6/81 CNPullivan/EPRI Memo Ret Contingency systemis analysis 1 pg.

heing performed by each of the 3 IMH NSSS vendors for potentially adverse IS-3,5 adverse safety valve test results, w/ attach.

MNED 0099584 4/6/81 No Name/EPHI Sununar y Contingency systems Analysis for 1 pg.

deduced Tutentially Adverse Safety Valve Test IS-3 Results MNED 0099586 4/6/81 JJCarey/EPRI Memo Transmits agenda for Utility Review Mtg I pg.

at Combustion Engineering Offices in IS-3 Connectivut 4/15/81, w/ attach.

MNED 0099587 4/15/81 No Rune /EPRI Agenda Attach: Utility Review Mtg 1 pg.

IS-3 MNED 0099588 4/3/81 JJCarey/EPRI Memo EPRI/PWR Safety & Relief Valve Test 1 pg.

Dist. List /EPRI Program testing activities for period 18-3

'of March 30-April 3 MNED 0099509 4/2/91 TEAuble/EPRI better Confirms telecon of 4/4/81 re: PGEE draft 1 pg.

GWu/PGEE telecopy titled " Affidavit of John B.

Bloch", and comment IS-3,5 MNED 0099590 4/1/81 DVKelly/PGEE Letter Inforanation re SGPORV block valves 1 pg.

RMIaverty/PGEE TAuble/EPRI 18-3,5 1

e Doc. No.

DATE Fros/To/ Entity Doc. Type Doc. D? cription MNED 0099591 4/31/81 JJCarey/EPRI Memo Transmits stat *Js rpt on valve 1 pg.

Tech. & Licensing Contacts selection & justification effort, w/ attach.

IS-3,5 MNED 0099592 3/1.6/81 TEAuble/EPRI Project Descrip.

Attach. Il re: Safety valve Selection 2 pgs.

de;duced

& Justification Tank, w/3 attachs.

IS-3,5 MNED 0099594 3/16/81 TEAuble/EPRI Report Attach. Il Pressurizer Safety Valve Selection & Justification Task 12 pgs.

10-3,5 MNED 0099606 3/16/81 TEAuble/EPRI Report Attach. 12 Power Operated Relief Valve Selection & Justification Task 6 pga.

IS-3,5 MNED 0099612 3/16/81 TEAuble/EPRI Report Attach. 13 List of PWR Utilities, Plants

& Pressurizer Safety Valves, Power 13 pgs.

Operated Relief Valves IS-3,5 MNED 0099625 3/27/81 JJCarey/EPRI Memo EPRI/PWR Safety & Relief Valve Test I pg.

Dist. List /EPRI Program testing activities for period e

of 3/23-27 IS-3 MNED 0099626 3/25/01 JJCarey/EPRI Memo Ret Info necessary for a block valve 1 pg.

Tech. & Licensing Contacts test program IS-3,5 MNED 0099627 3/16/81 JJCarey/EPRI Memo EPRI comunitted to provide block valve I pg.

Tech. & Licensing Contacts test plan IS-3,5 i

9 Dg. No.

DATE From/To/ Entity Doc. Typa Doc. Description HNED 0099628 3/24/81 JJCarey/EPRI Memo Transmits sununary status rpt for PWR 1 pg.

Tech. & Licnesing Contacts valve Test Program w/ attach.

IS-3 MNED 0039629 3/19/81 JJCarey/EPRI Report Attach. 11 EPHI PWR Safety & Relief 19 pgs.

Valve Test Program Status Rpt 3/81 18-3,5 MNED 0099648 3/19/81 JJCarey/EPRI Sununa ry EPRI l'WR Safety & Relief Valve Test 2 pga.

deduced deduced Program Sunenary of Block valve Testing at Marshall IS-3,5 MFCD 0099650 3/18/81 JJCarey/EPRI Memo Utility Review Mtg to 'ue held to review 1 pg.

Tech. & Licnesing contacts status of all Program Activities ID-3 MNED 0099651 3/6/81 JJCarey/EPRI Memo Transmits copy of viewgraphs presented I pg.

Tech. Contacts during EPRI valve Test Program & attendance Itst w/1 attach.

IS-3,5 MNED 0099652 2/13/81 No Name/EPRI Attendance List Attach. Il attendance list EPRI PWR safety 1 pg.

& Relief Valve Test Program 18-3,5 MNED 0099653 2/13/01 JJCarey/EPRI Report EPRI PWR Safety & Relief Valve Test Prog.

6 pgs.

Technical Advisory Group Mtg Program 12-3/

Statues Utility Requirements MNED 0099659 2/13/81 JHooler/EPRI Report EPRI/PWR Relief & Safety Valve Test 15 pgs.

Program Program Output / Utility Responses 18-3,5 MNED 0099674 2/13/81 JHoster/EPRI Report EPRI/PWR Safety & Relief Valve Test 17 pgs.

Program approach for Justifying Test conditions 1S-3,5

..-e

/0 Dor. Ilo.

DATE From/To/ Entity Doc. Type Doc. Description MNED 0099722 2/81 No Name/EPRI Report EPRP/CE Safety / Relief Valve Test 65 pgs.

Facility Deecription & Status IS-3,5 MNED 0099787 1/30/81 BWahackelford/PGsE Ietter Enc. Check for $92,500 in favor of I pg.

DSaxe/EPRI the Institute 18-3

'MNED 0099790 1/26/81 JJCarey/EPRI 1etter Attach for info interim rpt " Assessment I pg.

of analy41s Methods for PWR Safety /

Relief Valve Discharge Piping" 18-3,5 MNED 0099791 12/00 No Name/EPRI Report Assessment of Analysis Methods for PWR 132 pgs.

Safety / Relief valve Discharge Piping IS-3,5 MNED 0099923 1/26/01 JJCarey/EPRI Letter Attach. Preliminary Agenda for Utiltly I pg.

Review Mtg 2/13/81 18-3 MNE3 0099924 2/13/81 No Name/EPRI Agenda PWR Safety & Relief Valve Test Program 1 pg.

IS-3 MNED 0099925 1/21/B1 JJCarey/EPRI Letter Attach for info status rpt to EPRI I pg.

IS-3,5 MNED 0099926 1/12/01 No Name/EPRI Report Status rpt to EPRI-RAC-NSAC Subcommittee 7 pgs.

IS-3,5 F

i

____.,_._.._._______.._._____.___._mo_._._____m.__.__.____

//

IH L, llo.

DATE Prom /To/ Entity Doc. Typo Doc. Descript'lon MNED 0099930 1/20/81 DVKelly/PGER Ietter Request for info concerning relief &

I pg.

JJCarey/EPRI Safety valves i

15-3,5 MNED 0099931 1/9/80 JDEJeffries/EPRI I,etter Dissemination of Quick Imok Data Sheet I pg.

for Relief Valve Testing at Marshall Steam Station w/ attach.

IS-3,5 MNED 0099932 10/30/80 No Name/EPRI Data Sheet Harahall Test Quick lenk Data Sheet I pg.

IS-3,5 MNED 0099933 1/13/81 JJearey/EPRI Letter Attach Agenda Utility Review of EPRI I pg.

Valve Test Program w/3 attach.

18-3,5 MNED 0099934 12/5/80 No Name/EPRI Agenda Utility review of EPRI Valve Test I pg.

Program IS-3,5 HNED 0099935 12/5/80 No Name/EPRI Attendance List Attach 2/ attendance list Utility 2 pga.

Review program 18-3,5 MNED 0099937 12/5/80 No Name/EPRI Report EPR1/PWR Safety & Relief Valve Test 61 pgs.

Program IS-3,5 MNED 0099999 7/31/01 JJCarey/EPRI Letter Attach F.Y.I. NRC Memo on the PWR 1 pg.

Tech & Licensing contacts Utility /NRC/EPRI Mtg 7/17/81 Rvw Safety & Relief Valve Tests 18-3,5 l

+ ow * *e e-u - e se e * * ***

oesouwe e pw w ww gee come-w e -

eem I

/2 l#oc. No.

DATE F rose /To/ En t i t y Doc. Type Doc. Do7cription MNED 0100000 7/22/81 FCCherny/NRC Memo 7/17/81 Mtg w/EPRI & PWR Utils to 6 pga.

RJBosnak/NRC discuss status of EPRI/PWR Safety

& Relief valve prgrm & PORV Block valve qualif prgrm Devel pursuant IS-3,5 Item II.D.1 NUREG 0737 MNED 0160006 7/30/81 TEAuble/EPRI I,etter Disser.inate Data for the Pressurizer I pg.

Tech. & Licensing Contacts safety valve Tested at Combustion Eng.

btwn 6/17 & 7/6 IS-3 MNED 0100007 7/30/81 No Name/EPRI Bicunary/ Study EPRI/PWR Safety & Relief Valve Test I pg.

Program Safety Valve Test Sununary IS-3 HNED tt00008 7/30/81 No Name/EPRI Chart "As Tested" Combustion Eng. Test Matrix for the dresser Safety Va,ve 31739A 9

3 pg].

IS-3 MNED 0100011 7/30/81 No Name/EPRI Report Sequence of Testing Description (Ring Settings) 3 pga.

IS-3 MNED 0100014 7/30/81 No Name/EPRI Attachments Data Summary Sheets / Plots-Dresser 62 pgn, i

31739A Balety valve I

IS-3 MNED 0100195 7/28/81 JJCarey/EPRI Memo Attach 4 Review & Info " Program Output /

2 pga.

Tech. & I.icensing Contacts Subnictal to Utilities / Submittal to NRC" Rev. 2 IS-3 MNED 0100197 7/28/81 JJCarey/EPRI Memo Attach 4 Review & Info " Program Output /

2 pgs.

Tech. & Licenteng Contacts Submittal to Utils/ Submittal to NRC" Rev. 2 IS-3 MNED 0100199 7/24/81 PWR Valve Program Staff /EPRI Prog. Submittal EPRI PWR Safety & Relief Valve Test Program Output /Submittet to Utils/

18 pgly.

Lubmittal to NRC rev. 2 IS-3 MNED 0100218 7/27/81 JJCarey/EPRI Memo hata on the Performance of PWR Primary 1 pg.

Tech. & I.icensing Contacts System Relief & Safety valves 18-3 MNED 0100219 7/24/81 RCYoung Dahl/EPRI Letter Status of EPRI PWR Safety & Relief Valve Test Prog. NurIEG 0137, Item Ild!

3 pgm.

IIDenton/ NRC IS-3

/3

~

poc. tio.

IIATII From/To/ Entity Doc. Typw Inoc. D'excription MNED 0100222 7/24/81 JJCarey/EPRI Memo S/RV Test ActiviL1<3s 2 pgs.

IS-3 MNED 0100224 7/24/81 No Name/EPRI Summary Summary of Masonet.lan PORY Prelim.

35 pgs.

Test Rcaults 18-3,5 MNED 0100259 7/23/81 AJWheeler/EPRI I,e t te r Upstream Piping Viewgraphs 1 pg.

RI.averty/PG&E IS-3 MHP,D 0100261 7/22/91 No Name/EPRI Graph EPRI/CE Valve Test TWheeler/PGEE deduced I pg.

IS-3 Manual Excerpt Upstream Piping Effects on Valve

.MNED 0100262 7/81 No Name/EPRI Operation 8 pgs, deudced 12-3 MNED 0100270 7/22/81 No Name/PG&E Report Valve Testing Status File, Valve Testings 2pgn.

IS-3 MNED 0100272 7/22/01 No Name/PG&E Report S'equence of Events File, Valve Testings 3 pgs.

18-3 Phone Record Valve Testing MNED 0100275 7/21/81 GCWu/PGEE FHandy/SCE 1 pg.

IS-3 Phone Record Valve Testing MNED 0100276 7/20/81 GCWu/PGEE TAuble/EPRI 2 pgs.

IS-3 e

H Doc. No.

DATE From/To/ Entity Doc. Type Doc. Descript'lon MNED 0100292 7/17/81 JJCarey/EPRI Memo S/RV Test Activilles 2 pgs.

IS-3 MNED 010d293 7/16/81 RLTedesco/NRC Merno Drd Notification-EPRI Relief & Safety I pg.

ASElB Brd 4 DCNPP Valve Testing Prog. Units 1&2 IS-3 MNED 0100294 7/16/81 RLTedesco/NRC Memo DRD Notification-EPRI Belief & Safety 2 pga.

AS&LB Brd 4 DCNPP Valve Testing Prog. Units 152 IS-3 MNED 0100296 7/15/81 GCWu/PGEE Phone Record Valve Testing 1 pg.

FCherny/NRC IS-3 MNED 0100297 7/13/81 GCWu/PGEE Phone Record Valve Testing 1 pg.

JJCarey/EPRI IS-3 MNED 0100298 7/10/81 JJCarey/EPRI Me.no S/RC Test Activities I pg.

IS-3 MNED 0100299 7/9/81 JJCarey/EPRI Phone Record EPRI Valve Testing 1 pg.

BSLew/PGEE IS-3 MNED 0100300 7/7/81 BWShackelford/PG6E Letter PG6E Participation in 4 joint block I pg.

DSame/EPRI Valve test program IS-3,5 MNED 0100301 7/7/81 BWShackelford/PG&E 1,etter PGEE Financial Conunitment for Completion I pg.

FLCuller/EPRI of the safety & Relief valve test prog.

IS-3,5

- -. -.. ~.

/C Doc. 13 0.

l'ATt:

From/To/ Entity Doc. Type Doc. Deecription MNED 0100302 7/6/01 DABrand/PGEE Memo EPRI Valve Test Prog.

1 pg.

GAManeatis/PGEE IS-3,5 MNED 0100303 7/7/81 DABrand/PG6E I.e t t e r PCEE Participation in a joint block I pg.

DSaxe/EPRI valve test prog.

IS-3,5 MNED 0100304 7/7/81 DABrand/PGEE Letter PGEE financial comunitment for completion 1 pg.

FIfuller/EPRI of the Safety & Relief valsa test prog.

IS-3 MNED 0100305 6/16/R1 Firuller/EPRI Letter Present status of the safety & relief 1 pg.

Chief Exec. Off, owning valve prog.

pressurized water reactors t

15-3,5 l

MEED 0100306 6/15/81 FLCuller/EPRI Letter PWR Safety & relief valve test prog.

2 pga.

Chief Exec. Off.jowning IS-3 pressurized water reactors MNED 0100305 5/30/81 No Name/EPRI Report EPRI PWR Safety & relief valve test prog.

4 pga.

IS-3 MNED 0100312 No Name/EPRI Report Sequence of Events 3 pgs.

IS-3 MNED 0100315 No Name/EPRI Estimate Estimate of additional testing prog.

I pg.

costs IS-3 MNED 0100316 6/15/01 FIruller/EPRI Letter PWR block valve test program 2 pgs.

Chief Exec. Off. owning pressurized water reactors I S-3,35

/b 1)* *3 H o.,

  • _., _DATE From/To/ Entity Doc. Type Doc. Description s/e, 3ag

/15/81 NMED 0100381 6

No Name/EPRI Est. Sununary EPRI/PWR block valve task action 1 pg.

plan 7/1/81-1/1/83 9

18-3,5 NMED 0100319 6/10/81 No Name/EPRI Procedure Task action for verification of PWR 17 pg3. 4 ;g g,,,g -

block valve functionability 18-3,5 MNED 0100335 7/1/81 JJCarey/EPRI Letter Ref. 1 Itr, F. Culler to Chief Exec.

2 pgs.

Tech. & Licensing Contacts Officers owning pressurized water 10-3,5 reactors, 6/16/81 MNED 0100337 No Name/No Affil Attendance list EPRI PWR safety & relief valve test 2 pga.

program 18-3,5 "MNED 0100339 6/24/81 No Name/EPRI Report EPRI*PWR safety & relief valve test 60 pga.

program

~

18-3,5 MNRD 0100398 7/1/81 RPBaskins/SCE Letter San Onofr[ Nuc. Generation Station 1 pg.

FMiraglia/NRC Units 263 18-3,5 MNED 0100399 7/1/81 No Name/EPRI Report EPRI/PWR safety & relief valve test 272 pge, prog. interim data rpt 18-3,5 MNED 0100671 7/81 WJBilanin/EPRI Report PWR safety & relief valve test prog.

277 pga.

Util. Tech contacts interim data rpt 18-3,5 i

/7 Ot3". lin.

DATE From/To/ Entity Doc. Type Doc. Description MNFD 100950 8/31/81 JJCarey/EPRI 1.e tt e r EPRI/PWR safety & relief valve prog.

2 pgs.

TEAuble/EPRI Tech. Advisory Group /NSSS Vendor Mtg 18-3,5 MNED 100952 8/31/81 JJCarey/EPRI Letter Performance to date PWR safety velve 1 pg.

tests (Supplementary) w/ attach.

IS-3 MNED 190953 8/31/81 JJCarey/EPRI Report Attach. PWR safety valve tests to 4 pgs, date supplementary non-testing info IS-3 MNED 100957 8/28/81 JJCarey/EPRI Letter Safety relief valve testing activities 2 pgs.

w/ attach. dist. Ilot IS-3 MNED 100959 8/24/81 AJWheeler/EPRI Letter Special teste 503, 512 s attach, prelim.

I pg.

WJBilanin/EPRI data w/ attach.

IS-3 MNED 100960 8/81 AJWheeler/EPRI Study Attach, re Test date (Preliminary) 153 pgs.

deduced WJBilanin/EPRI IC-3 MNED 101063 8/21/01 JJCarey/EPRI Letter S/RV test activities 8/15 thru 8/21 2 pgs.

w/ attach. diet. lists

'. 8-3 MNED 101065 8/21/01 JJCarey/EPRI Letter Cover 1tr for draft of the Marshall test 1 pg.

rpt w/ attached rpt.

18-3,5 MNED 101066 8/19/81 JJCarey/EPRI Rpt Draft Attach re "EPKI/ Marshall Power Operated 352 pgs, reJief valve test data rpt" IS-3,5 1

IB

.. I: s.

HAJC from/To/ Entity Doc. Tygie Doc. D wcription ED 101418 8/20/81 DSaxe/EPRI Letter Cover Itr thanking BWS for support of pg.

BWShackelford/PCEE PWR S/RV Prog. w/ attach ltr 7/24/71 from Ruse Youngdall

-3,5 ED 101419 7/24/81 RCYoungdah1/CPCO tatter Attachment res Status of EPR1 PWR safety pg3.

HDenton/HRC

& relief valve prog. NUREG 0737, Item II.D.1

-3,5

ED 101422 8/17/81 JJCarey/EPRI Letter Status rpt EPRI PWR S/RV test prog.

pga.

deduced

-3,5 ED 101424 8/14/81 JJCarey/EPRI 14tter S/RV test activities 8/8 to S/14 pgc.

-3

ED 101426 8/13/81 AJWheeler/EPRI Letter Recent testing update w/3 attachs.

P9 3

ED 101427 8/81 AJWheeler/EPR1 Sunena ry Attach. 1 Inlet piping utilized in' pga.

deduced participating PWR's

-3 ED 101432 8/01 AJWheeler/EPRI Report Attach. 2 Prog, outline n interim rpt pg.

A parametFic study of safety valve

-3 dynamics f potential valve chattering s

ED 101465 8/81 AJWheeler/EPRI Analysis Attach 3 Applicability of S/RV valve pgs.

Operability results to plants w/long

-3 inlet piping ED 101470 8/13/81 TEAuble/EPRI Letter Prelim. results of EPRI/Wyle tests on I

JJCarey/EPRI the Masonellan PORV w/2 attachs.

pg.

-3,5 hED101471 7/81 TEAuble/EPR1 Susana ry Attach 1 EPRI/PWR safety & relief valve lpg.

deduced test prog. PORV test sununary f

i

)-3,5 I

1 a

ll 1

IB fg

_ Oh1 from/to/ Entity Doc. Type Doc. De"cription MNED 101418 8/20/81 DSaxe/EPRI Letter Cover ltr thanking BWS for support of 1 pg.

SW8hackelford/PG&E PWR S/RV Prog w/ attach ltr 7/24/71 from Russ Youngdall I5-3,5 MNED 101419 7/24/81 RCYoungdahl/CPCO Letter Attachment res Status of EPRI PWR safety

.3 pg3.

HDenton/NRC

& relief valve prog. NUREG 0737, Item II.D.1 IS-3,5 MNED 101422 8/17/81 JJCarey/EPRI Letter Status rpt EPRI PWR S/RV test prog.

2 pgs, deduced IS-3,5 MNED 101424 8/14/81 JJCarey/EPRI Letter S/kV test activities 8/8 to 9/14 2 pg3.

10-3 MNED 101426 8/13/81 AJWheeler/EPRI I.s t te r Recent testing update w/3 attachs.

1 pg.

18-3 MNED 101427 8/81 AJWheeler/EPRI Summary Attach. 1 Inlet piping ut111 ed in

,5 pg3.

deduced participating PWR's 18-3 l

MNED 101432 8/81 AJWheeler/EPRI Report Attach. 2' Prog. outline & interim rpt 33 pga.

A parametric study of safety velve 13-3 dynamics & potential valve chattering

.MNED 101465 8/81 AJWheeler/EPRI Analysis Attach 3 Applicability of S/RV valve 5 pgs.

Operability results to plants w/long 18-3 inlet piping MNED 101470 8/13/01 TEAuble/EPRI Letter Prelim. results of EPRI/Wyle tests on 1 pg.

JJCarey/EPRI the Masonellan PORV w/2 attachs.

IS-3,5 MNED 101471 7/81 TEAuble/EPRi Susunary Attach 1 EPRI/PWR safety & relief valve 1 pg.

deduced test prog. PORV test susunary 18-3,5 1

19 th ai.. Hu

_ DATE From/To/ Entity noc. Tyro Doc. D ecription MNED 101472 7/81 TEAuble/EPRI Sunenary Attach 2 EPRI/Nyle PORV test prog.

41 pga.

JHoeler/EPR1 for the Masonellan International Valve 18-3,5 MNED 101513 8/7/81 JJCarey/EPHI Letter S/RV test activities from 8/1/01 to 2 pg2.

8/7/81 IS-3 MNED 101515 8/5/81 TEAuble/;PRI Letter Cover 1tr w/ attached Prelim. data 1 pg.

package w/3 attachs.

IS-3 MNED 101516 6/81 TEAable/EPRI Susanary Attach.1 EPRI/PWR safety & relief 1 pg.

valve test prog. test summiary 18-3 MNED 101517 6/81 TEAuble/EPRI Susunary Attach 2 "As Tested" combustion Eng.

I pg.

test Matrix for the dresser safety IS-3 valve 31709NA MNED 101518 7/81 TEAuble/EPRI Sumunary Attach. 3 Data sumanary shoots / sequence 20 pga.

deduced of events / Plots dresser 31709NA safety IS-3 valve MNED 101538 8/5/01 Avtar Singh/EPRi Letter Cover 1tr for flow visualisation test..

1 pg.

etc w/ attach.

18-3 MNED 102539 7/81 DWSallet/Obert Assoc.

Report Attach. res flow visualisation tests &

110 pgs.

WNasto11/

analysis of safety & precoure relief IS-3 REFishman valve interim rpt MEPalmer RWEnight MNED 101649 8/4/01 TEAuble/EPRI Letter Tech. advisory group mtg of 7/22/81 2 pg2.

w/4 attache.

18-3 MNED 101651 7/22/81 TEAuble/EPRI Attendance list Attach 1 list for the 7/22/81 TAG mtg 1 pg.

IS-3 f

__._______.___._______.__.__._.____.___..___m_

m._.

20

" *. Ile s.,

_ Ital t' l'tos/To/ Entity Doc. Type Doc. Dercription MNED 101652 7/22/81 TEAuble/EPRI Mtg Presentation Attach 2 EPRI/PWR nafety & relief 15 pga.

Asingh/EPRI Program valve test prog.

IS-3 MNED 101667 7/22/01 TEAuble/EPRI Susanary Attach. 3 EPRI/PWR safety & relief 4 pg3.-

valve test prog, dresser valve 31739A 18-3 MNED 101671 7/22/81 TEAuble/EPRI Susunary Attach. 4 EPRI/PWR safety & relief 21 pg3.

valve test prog. Crosby valve 3k6 IS-3 MNED 101692 R/4/81 BSnes/EPRI IArtter Masonellan Pwr operated relief valve 1 pg.

w/2 attache.

18-3,5 MNED 101693 7/22/01 PEMerrill/Masonellan Div.

Letter Attach. 1' Telex re EPRI PWR safety 1 pg.

McGraw Edison Co.

& relief valve test prog.

8 18-3,5 MNED 101693A O/4/81 BSans/EPRI List Attach 2 List of plants w/Masonellan 1 pg.

PORV's 18-3,5 MNED 101694 8/4/81 CWSu111 van /EPRI Letter PWR block valve data verification 1 pg.

w/2 attachs.

15-3,5 MNED 101695 3/25/01 JJCarey/EPRI Letter Attach 1 PWR block valve test prog.

I pg.

18-3,5 MNED 101696 3/01 CWSu111 van /EPRI Survey Attach 2 Catalogued table of responses 5 pgs.

deduced IS-3,5 l

2I po_c_.._ No. _

DATE From/To/T-tity Doc. Type Doc. De criptian MNED 101707 6/29/01 TEAuble/EPRI Letter Valve test of CCI PORV prelim data 1 pg.

w/ attach.

18-3,5 1

MNED 101700 6/20/81 No Masse /Nyle labs Susumary Attach re RPRI/PWR safety & relief 4 pgs.

valve test prog. test susesry 18-3,5 i

MNED 101712 6/29/01 PAcrane/PGEE Letter Partial response to NUREG 0737 FJMiraglia/NRC section II.D.1 i

2 pgs.

^

18-3 MNED 101714 6/1/01 No Name/PG&B Testimony PGER proposed lindings of fact EPRI I pg.

testing respornilve to 1073 II.D.1 18-3,5 000ED 101715 5/22/01 No Name/PGEE Testimony Written testimony a formel prog. for 1 pg.

PORV responsive to NUREG 0737 II.D.1 18-3,5 MNED 101716 5/22/81 No Name/PG&E Testimony Verbal testimony EPRI test prog.

2 pga.

requirements 18-3,5 IteED 101718 3/13/51 No Name/PG&E Letter PGER response to NRC request re 1 pg.

FJMiraglia/NRC docket No. 50-275 & 50-323 w/ attach. 92 18-3 DC Units 152 (Incomplete Doc.)

i i

22 i.e. Ilo.

DATE

'From/To/ Entity Doc. Type Doc. Dveription annen -M1721 2/26/81 No Name/PCEE Letter PGEE supplement responses re Docket 2 pgs.

FJNiraglia/NRC 50-275 & 50-323 w/ attach. 17 (Inc. doc.)

N tatEU 101723 2/01 3 tame /PGEE Attach. 17 Performance testing of valves 2 pgs.

deduced (II.D.1) current PWR utility's position 18-3,5 MNED 101725 6/29/81 JJCarey/EPRI Letter EPRI PNR safety & relief valve test 1 pg.

prog. w/3 attachs.

IS-3 MNED 101726 6/1/31 RCYoungdahl/EPRI Letter Attach. Status of EPRI PNR safety &

2 pga.

HRDenton/NRC relief valve test prog. NUREG 0737, IS-3 ITEM II.D.1 MNED 191728 6/81 No Name/ Utility Ltr Draft Attach. suggested response to NUREC 1 p9e No Name/NRC 0737, Item II.D.1 IE-3 MNED 101729 6/26/81 JJCarey/EPRI Susanary Attach. 01EPRI PNR Safety & relief valve 9 pg].

test prog. Nyle labs & Combustion Eng.

IS-3 tests MNED 101740 6/24/81 BNShackelford/PGER Ltr Draft Agree to cost increase in block valve 1 pg.

F1ruller/EPRI test prog.

15-3,5 MNED 101741 6/24/01 BN8hackelford/PGEE Ltr Draft Agree to cost increase in block valve 1 pg.

DSaxe/EPRI test prog.

IS-3,5 NNED 101742 6/23/81 RMLaverty/PG&E Memo Increased spending in EPRI test prog.

I pg.

DVKelly/PG&E IS-3,5 i

- -. _-.. ~ - - _ - - _ _. -

$Ab Do..

No.

DATE From/To/ Entity Doc. Type Doc. DT cription MNED 101743 6/29/91 PACrane/PGEE Letter Partial response to NUREG 0737 2 pgs.

FJMiraglia/NRC II.D.1 IS-3 MNED 101745 6/26/81 JJCarey/EPRI Letter Contingency analysis w/ attach.

1 pg.

Ltr w/ list & ltr w/3 rpts 18-3,5 MNED 101746 6/19/81 EMBurne/ Westinghouse (Deduced)

Ltr Draft EPRI S/RV test Prog./ List of 1 pg.

CWSulliven/EPRI Westinghouse Plants w/ attached. list 18-3,5 MNED 101747 6/18/81 EM8urne/ Westinghouse List Attach. List of Westinghouse Nuc.

2 pgs.

CWSullivan/EPRI Plants that were used in preparation of tables 3.2 & 3.3 of the Phase "A" 18-3,5 Ltr rpt MNED 101749 6/2/62 EM8urne/ Westinghouse Letter EPRI S/RV test prog. Phase "A" of 3 pgs.

CWSullivan/EPRI agreement V102-19-level 2 acceptance criteria w/3 attachs.

18-3,5 MNED 101752 6/81 CLGottshall/ Westinghouse Ltr Rpt Attach. 1 EPRI S/RV test prog. agreement 156 pgs.

V102-9 Phase A 18-3,5 MNED 101908 6/81 RTerandt/ Babcock & Wilcox Rpt Attach. 2 Definition of level 2 acceptance 73 pgs.

LRCartin/"

criteria for pressurizer safety valve PORV DADoss/"

" Fall Back" Positions 18-3,5 JWMerchant/"

PWong/"

WLBloomfield/*

34 Doc. No.

DATE From/To/ Entity Doc. Type Doc. Description MNED 101981 1/81 No Name/ Combustion Eng. Inc.

Report Attach. 3 safety valve contingency

(

D8'pgs.

analysis efforts in support of the ZPPP PWR safety & rellef silve test 13-3,5 prog.

MNED 102039 6/26/81 JJCarey/EPRI Memo S/RV test activities 6/22-6/26 3 pgs.

IS-3 MNED 102050 6/23/81 RMI,averty/PG&E Memo Increased spending in the EPRI valve 1 pg.

DVRelly/PCEE test prog.

18-3,5 MNED 102051 6/23/81 RMLaverty/PGss Memo Increased spending in the EPRI valve 1 pg.

DVRelly/PGEE test prog.

18-3,5 MNED 102052 6/19/81 JJCarey/EPRI Memo S/RV test activities 6/15/ to 6/19 2 pgs.

18-3,5 MNED 102053A 6/22/81 JJCarey/EPRI Letter Use of N2 during low temperature 1 pg.

operations 18-3 MNED 102054 6/19/81 AJWheeler/EPRI Letter 4/30/01 atg btwn A/E & Utility reps 2 pgs.

EPRI PWR S/RV test prog.

38'W

}.6 I h vi. Ilu.

DALE From/To/ Entity Doc.ype Doc. Description MNED 102056 6/16/81 RLCuller/EPRI Letter Cover 1tr w/ attached 1tre (2) 1 pg.

DVRelly/PGEE that related to present status &

new development of the test prog.

18-3,5 w/ attached 1tre & their attache.

MNED 102057 6/15/81 FIruller/EPRI Letter let attached. 1tr trnasmits PWR/S/RV 2 pg3.

test prog. Info w/3 attachs.

18-3,5 MNED 102059 5/30/81 FLCuller/EPRI Report Attach I status rpt 5/3(,/81 4 pg3.

18-3,5 MNED 102063 5/27/81 FLCu11er/EPRI Report Attach 2 Sequence of events 3 pg3.

18-3,5 MMED 102066 6/15/01 JJCarey/EPRI Summary Attach 3 Estimate of additional 1 pg.

testing prog. costs 18-3,5 MNED 102067 6/15/81 FLCuller/EPRI Letter 2nd Attachd Itr transmits NURE 0737 2 pgs.

new requirement for qualification of PWR block valves w/2 attachs.

IE-3,5 MNED 101069 6/15/01 FIruller/EPRI Sususary Attach 1 BPRI/PWR block valve task 1 pg.

action plan 7/1/81-1/1/03 Cost estimate susanary 18-3,5 MNED 102070 6/10/81 No Mame/EPRI Report Attach 2 Task action plan for verifica-16 pgs, tion of PWR block valve functionability 18-3,5 N

.2[

l i

l> t. 18 0 DA l t:

From/To/ Entity Doc. Type Doc. Description p

MNED 102006 6/16/01 TEAuble/EPRI Letter Transmite EPRI test on dresser 1 pg.

safety valve model 31709NA w/2 18-3 l

attachs.

MNED 1CNM7 6/81 TEAuble/EPRI Susunary Attach 1 Dresser valve test susunary 1 pg.

IS-3 MNED 102088 6/81 TEAuble/EPRI Attach 2 Prelim. data sununary sheets 8 pgs.

for test series / sequence dresser valve 18-3 HNED 102096 6/15/61 JJCarey/EPRI Letter Mtg on PWR valve test prog. On 6/24/81 1 pg.

18-3,5 MNED 102097 6/15/81 No Mame/PGsE Phone Record Valve testing 2 pgs.

JJCarey/EPRI 18-3 MNED 102099 6/15/81 TEAuble/EPRI Letter Trnasmits prelim. results of all the 1 pg.

Wyle labs, Phase III tests performed on the dresser PORV w/2 attachs.

18-3,5 MNED 102100 6/15/81 TEAuble/EPRI Susunary Attach 1 susumery of principal 2 pgs.

observations "As Tested" Whyle Phase test Matrix for the dresser relief 18-3,5 velve MNED*102102 5/5/81 No Name/Wyle Labs Susanary Attach 2 data susumary sheets for 92 pgs, dresser PORV test 18-3,5 MNED 102195 6/5/81 JJCarey/EPRI totter Transmits Interim data rpt w/ attach. rpt 1 pg.

18-3

27 e

noe, flo.

, twrE rrom/To/ Entity Doc. Type Doc. Dercription MNED 102196 6/1/81 JJCarey/EPRI Report Attach. prelimin. EPRI/PWR Safety A 212 pgs.

relief valve test prog, interin IS-3 data rpt NMED 102408 6/5/81 JJCarey/EPRI pkhno S/RV Test activities 6/1 thru 6/5 2 pga.

18-3,5 MNED 102410 6/81 TEAuble/EPRI Letter Transmits Wyle Lab's test data 1 pg.

dresser valve w/2 attache.

18-3,5 MNED 102411 6/81 TEAuble/EPRI Susunary Attach 1 EPRI/PWR S/RV test prog.

2 Pg3.

test numenery 18-3,5 MNED 102413 5/8/81 No Name/wyle Lab's Reprot Attach 2 Prelim. Eng. Rpt data 11 pgs.

sumanary sheet for PORV test 18-3,5 MNED 102425 6/3/81 Dr. SAChien/Anco Analysis Attach P;;R valve quellfication 1 pg.

analysis to NRC Mureg 0578 s 0737 requirements 18-3,5 MNED 102426 5/3/81 JJCarey/EPRI Letter Transmits additional test info 1 pg.

18-3,5 s

MNED 102427 6/81 JJCarey/EPRI Report Attach 1 Test Matrix table for PORV's 4 pg3.

l IS-3,5 l.

f

AY i

l si a. li n.

l'fil l; Frosa/Te/ Entity Doc. Type Doc. Deveription l

MNED102431 5/30/81 JJCarey/EPRI Report Attach 2 Status rpt for PWR test 4 pgs.

prog. PORV, S/RV 18-3,5 MNED 102435 5/28/81 DPHoffman/ Consumer Pwr Co.

Report Attach 3 Prog. output / Submittal to 19 pg3.

utilities / submittal to NRC 18-3,5 MNED 102454 6/1/81 JJCarey/EPRI Letter Transmits 2 docs, test contacts &

1 pg.

test data w/2 attachs.

IS-3 MNED 102455 4/81 JJCarey/EPRI Procedure Attach, 1 P*ocedure for evaluating &

40 pgs.

rpting prelim. SERV valve test data IS-3 MNED 102495 6/1/81 JJCarey/EPRI List Attach 2 Tech. Licensing & Exec.

34 pga.

contacts participating utilities 18-3 MNED 102531 9/11/81 AJWheeler/EPRI Letter Transmits 2 does backpressure I pg.

calculations & piping data w/2 attach.

IS-3,5 MNED 102532 9/11/81 AJWheeler/EPRI Report Attach 1 EPRI/PNR valve prog. back-9 pgs.

pressure calculations IE-3,5 MNED 102542 9/11/81 AJNheeler/EPRI Report Attach. 2 Piping data run 526 Crosby 53 pgs.

3k6 valve w/long inlet pipe IS-3,5 MNED 102595 9/9/81 JJCarey/EPRI Memo S/RV test activities 8/29 thru 9/4 2 pgs.

10-3 MNED 102597 9/8/81 JJCarey/EPRI Agenda Mtg agenda for 10/1/81 S/RV test 1 pg.

prog. this is Doc. 102598'a attach.

IS-3 nm.,,.

90.

_ _DATE, From/To[ Entity Doc. Type Doc. Dm"cript'lon

o. c.

MED 102598 9/8/81 JJCarey/EPRI Letter Transmits atg agenda for 10/1/81 1 pg.

S/RV test prog. w/ attach see 18-3 see Doc. 102597 b MED 102599 9/9/81 JJCarey/EPRI Letter Transmite T.G.A. mtg info (Tech.

5 pga.

Advisory Group) w/ 11 attachs.

18-3,5 MED 102604 8/81 JJCaray/EPRI Agenda Attach. 1 TAG Mtg agenda 8/27-28/81 4 pg2.

18-3,5 y MNED 102608 8/81 JJCarey/EPRI Attendance List Attach 2 attendance list TAG mtg 8/27-28 3 pgn.

18-3,5 s MED 102611 8/81 JJCarey/EPRI Summanry Attach 3 Sun. Hev. of safety valve results 19 pgs.

18-3,5 h MED 102630 8/81 JJCarey/EPRI Susunary Attach 4 frannatome safety valve efforts 14 pga.

18-3,5 h MED 102644 O/81 JJCarey/EPRI Analysis Attach 5 upstream piping / safety 32 pga.

valve analysis 18-3,5 hMNED102676 9/01 JJCarey/EPRI Report Attach 6 TAG recomunendations for 2 pq3.

future testing 18-3,5

%MNED102678 8/81 JJCarey/EPRI Susumery Attach 7 Wyle relief valve test sum.

6 pg3.

18-3,5 l

30 W a:. t30 tiATE From/To/ Entity Doc. Type Doc. Deacription, MNED 102684 8/81 JJCarey/EPRI Report Attach 8 Subscale safety vavle testo 7 pgJ.

18-3,5 MNED 102691 8/81 JJCarey/EPRI Analysis Attach 9 Downstream Piping analysis 5 pga.

Ib-3,5 MEND 102696 8/81 JJCarey/EPRI Report Attach. 10 Test condition Justifica-5 pgs.

tion rpt status valve selection /

Justification rpt stats EPRI block 18-3,5 balve support effort MNED 102701 8/81 JJCarey/EPRI Sususary Attach 11 EPRI/ TAG test direction 3 pg3.

sumanary 18-3,5 MNED 102705 9/2/81 JJCarey/EPRI Letter Transmits EPRI/Narshall block 1 pg.

RMLaverty/PGEE valve draft rpt w/ attach.

18-3,5 MN!D 102706 SDJuckarski/Intersnountain Tech.

Report Attach EPRI/ Marshall Electric Motor 171 pgs.

REHouse/*

Operated valve teat data rpt prelim.

GACorde/"

18-3,5 MNED 102877 9/1/81 JJCarey/EPRI Memo Status of financial support for the 2 pga.

EPRI PWR safety & relief valve test 18-3 prog. w/ attach.

MNED 132879 9/1/81 JJCarey/EPRI List Attach re tables 1-3 external prog.

3 pga, participants Manufacturers contacted 18-3 for financial support,PNRjAES contacted for financial support

31 JIr,c. tio.

DATE From/To/ Entity Doc. Type Doc. De*cription MNED 102882 9/1/81 TEAuble/EPRI Memo Transmits 2 attach. 1) Test susumary 1 pg.

JJCarey/EPRI

2) EPRI/CE Safety valve test date for IS-3 the Crosby 3k6 safety valve (Short inlet configuration)

MNED 102883 9/1/01 TEAbule/EPRI Susunary Attach 1 safety valve test sumanary 2 pga.

IS-3 MNED 102885 9/81 TEAuble/EPRI Susumary Attach 2 EPRI/CE safety valve test 150 pgs.

data for the Crosby 3k6 safety valve IE-3 (Short inlet pipe configuration) 9

.31 Doc. No.

DATE From/To/ Entity Doc. Type Doc. Description l

MNED 01030?6 9/30/81 CWSullivan/EPRI Memo EPR3 block valve efforts underway 3

2 pgs.

Tech & Licen. Contacts /EPRI to support utility response to NUREG 0737 w/2 attachs.

18-3,5 MNED 0103038 8/26/81 JJCarey/EPRI Letter A ttach 1 EPRI ef forts relative to 2 pgs.

DHoffman/ Consumers Pwr Co.

aupport responses to NUREG 0737 18-3,5 MNED 0103040 8/26/91 No Name/EPRI List httach 2 compilation of the list of 6 pge, deduced block valves used in PNR's 18-3,5 MNED 0103046 9/29/81 DGElsenhut/NRC Memo Revised schedule for completion of TMI I pg.

Licensees of operating plants action plant Item II.D.1, R/SV testing

& applicants for operating licen.

(generic Itr 881-36) w/1 attach.

13-3,4,5 MNED 0103047 9/29/81 No Name/NRC Revisions Attach 1 extension of completion time 4 pga.

deduced for the PWR test prog. until 4/1/82 &

j of the PWR plant specific rpts until 7/1/82 18-3,4,5

.t i

MNED 0103051 9/28/81 JJCarey/EPRI Memo Testing activities for the EPRI PWR 2 pga.

8/RV test prog. for the period 9/19-Is-3 9/25/81 MNED 0103053 9/25/81 JJTaylor/EPRI Memo Effective 10/1/81 Warren Bilanin will 1 pg.

Tech & Licen contacts /EPRI assume management responsibility for the 18-3 PWR NSSS Primary contacts EPRI PWR 8/RV test prog.

MNED 0103054 9/24/81 JJCarey/EPRI Memo Attached draft of Wyle interim test rpt 1 pg.

Firmary utility contacts "EPRI/Wyle Pwr Operated Relief Valve Test Rpt--phases I & II Interim Rpt".

18-3,5 MNZD 0103055 9/17/81 No Name/Wyle Labs Report EPRI/Nyle Pwr Operated Relief Valve Test 188 pgs.

Rpt-EPRI Research Proj. V102-11 Phases IsII Interim rpt IS-3,5 9

.33 Doc. Type Doc. De;cription Doc.'No.

DATE__

rrom/To/ Entity Enc. Tent sununary rpt 9 's 1-10 Letter MNED 0103243 9/24/81 RHEngelken/NRC adverse results from equipment testing PAcrane/PGEE 2 Pg.

w/l attach.

IS-3,5 Attach 1 test susumary rpt adverse MNED 0103245 9/24/01 No Name/NRC Report results from equipment testing 12 pga.

15-3,5 Testing activities for the EPRI PWR Memo MNED 0103257 9/21/01 JJCarey/EPRI S/RV test prog. for the period of 2 pga.

9/12-9/18/81 18-3 Attached update list of T&L & Exec.

Memo MNED 0103274 9/16/01 JJCarey/EPRI contacts for the participating util's Tech, a Licensing contacts w/1 attach.

1 pg.

18-3 Attach 1 PWR S/RV test prog. utility Nt?.f List MNED 0103276)- 9/30/81 No Mame/EPRI Tech. Licen. & Exec contacts, II pgs.

participating utilities 19-3 Attached response to NRC Coses's con-Mesmo MNED 0103292 9/16/81 JJCarey/EPRI carned w/results of PORY block valve Tech. & Licen contacts teste performed by EPRI w/1 attach.

1 pg.

18-3,5 Attach 1 EPRI testing on closure of Letter MNED 0103293 9/4/81 WJDircks/NRC block valves of the type used on PWR's RDPoller/ Union of Concerned for isolation of PORV's 8 pg3.

scientists 18-3,5 Minutes of stg for TAG /EPRI/MSSS stg Mesmo MNED 0103301 9/15/01 JJCarey/EPRI of 9/10-11/01 review of safety valve Tab contacts data obtained to date s discuss actions 3 pgs.

required to address observed valve per-15-3,5 formance w/1 attach.

Attach 1 study of EPRI S/RV test prog.

MNED 0103304 9/10/81 No Mame/EPRI Study TAG /EPRI/MSSS atg 9/10-11/81 45 pgs.

19-3,5

- _ _. _ _. _ _ ~ -. - _

34 tjoc, po.,

_ IMI:

From/To/ Entity Doc. Type Doc. Daecription MNED 0103349 9/15/81 JJCarey/EPRI Memo Mtg date set for EPRI Tech. Advisory 2 pgs.

Group on PWR S/RV test prog. for 9/25/81 IS-3 MNED 0103351 9/14/81 JJCarey/EPRI Memo Testing activities for the EPRI PWR 1 pg.

S/RV test prog. for the period of IS-3 95-911/81 MNED 0103352 9/14/81 James Scott /EPRI Memo Prelim. SV Test results-performed at I pg.

T&1. contacts the Combustion Eng. Test Facility IS-3 (Less than optimum results).

MNED 0103353 9/14/81 JJCarey/EPRI Memo Testing activities for the EPRI PWr 1 pg.

S/RV test prog, for the period of IS-3 9/5-9/11/81 MNED 0103354 9/14/81 James Scott /EPRI Memo Prelim. SV test results performed at 1 pg.

T&L mntacts the Combustion Eng. test facility 18-3 (less than optimum results).

MNED 0103355 JJCarey/EPRI Memo Attached draft copy of the valve 1 pg.

litility tech contacts selection / justification rpt from EPRI w/1 attach.

IS-3,5 MNED 0103356 8/81 No Name/EPRI Report Attach 1 EPRI/PWR S/RV test prog.

257 pgs.

No Name/MPR Assoc. Inc.

valve selection / justification rpt No Helme/PWR S/RV Manufac.

18-3,5 MNED 0103614 10/19/81 Weilanin/EPRI Memo Testing activities for the EPRI PWR 2 pgs.

S/RV test prog. for the period of 8

IS-3 10/10-16/81 MNED 0103616 10/15/81 John Iloster/EPRI Memo The purpose of this memo is to 1 pg.

Util. TEL Contacts dissiminate data for the Garrett Corp.

RV test by EPRI at Wyle Labs w/2 attach 19-3,5

~

3G Doc. No.

DATE From/To/ Entity Doc. Type Doc. Description MNED 0103617 10/15/81 No Name/EPRI Summary Attach 1 EPRI/PWR S/RV test prog. Pwr

^

l pg.

deduced operated relief valve test summary 15-3,5 MNED 0103618 10/15/81 No Name/EPRI Summary rpt Attach 2 an "As tested" test matrix 36 pgs.

dMuced data summary sheets, & valve inspection rpt summarizing EPRI/Wyle Phase III IS-3,5 testing of the Garrett Corp. relief valve MNED 0103662 10/9/80 JJCarey/EPRI Memo EPRI S/RV operability testing prog.

2 pgs.

Tech contacts for PWR S/RV required under NUREG 0578 w/2 attachs.

IS-3 test prog.

MNED 0103664 8/20/80 AJWheeler/EPRI 1.e t t e r Attached 1 EPRI request to designers of 1 pgs.

S/RV piping systems to participate in 10-3 EPRI test prog. by performing analysis of selected sample problems MNFD 0103665 10/9/80 No Name/EPRI Summary Rpt Attach 2 EPRI sample problems based on 10 pgs.

deduced tests to be made on the Combustion Eng.

IS-3 test facility as part of their S/RV testing prog.

MNED 0103675 10/9/81 Warren Bilanin/EPRI Memo Testing activities for the EPRI/ LWR 2 pgs.

S/RV test prog. for the period of IS-3 10/3-9/81 MNED 0103677 10/8/81 Wareen Bilanin/EPRI Memo EPRI/PWR S/RV test prog. Util review retg 3 pgs.

Util. TEL Contacts 10/1/81 & NRC Prog, status utg 10/2/81 IS-3 x

w/4 attachs.

1

- MNED 0103680 10/1/81 No Name/EPRI List Attach I attendance list for PWR Utility 2 pgs.

WPRI status utg 10/1/81 IS-3 MNED 0103682 10/1/81 JJCarey/EPRI Summary Attach 2 EPRI PWR S/RV test prog. summary 1 pg.

of util. funding 15-3

84*

Io. I..

ism E From/To/ Entity Doc. Type Doc. Dr*cription s

MNED 0103683 10/2/81 No Name/EPRI List Attach 3 attendance list for PWR 1 pg.

Utility /EPRI/NRC mtg 10/2/81 l

IS-3 l

l MNED 102684 10/2/01 No Name/EPRI Susunary Rpt Attach 4 study from PWR Utility /NRC l

54 pga.

prog. status utg of Ita/2/81 for the IS-3 EPRI/PWR S/RV test, prog.

MNED 0103738 10/0/81 WB11anin/EPRI Memo Attached draft plant conditions I pg.

TEL contacts justification rpt for Westinghouse plants w/1 attach.

10-3,5 MNED 0103739 10/8/81 No Name/ Westinghouse Report Attach 1 rpt re S/RV inlet fluid 50 pga.

deduced condition during valve actuation in Westinghouse-designed plants IS-3,5 MNED 0103789 10/7/81 AJWheeler/EPRI Memo Re enc. piping load date for run 536

  1. c.

Weilanin/EPRI w/I attach 10-3)

Util. Tech. contacts

,MNED 0103790 10/7/81 No Name/EPRI Study Attach 1 prelim. piping data package 56 pgs deduced CE pun 536 Crosby 3k6 w/ loop seal 10-3

37 t..c. ti..

I?ATt:

Faom/To/ Entity Doc. Type Doc. D1ecription MNED 0103846 10/7/81 JHosler/EPRI Memo Transmits 2 attach 1) Test susunary 1 pg.

TEAuble/EPRI

2) "As tested" test matrix rpt WBilanin/EPRI IS-3,5 MNED 0103847 10/7/01 Jilosler/EPRI Summary Attach 1 PORV test summary 1 pg.

TEAuble/EPRI WB11anin/EPRI 12-3 MNED 0103048 10/7/81 JHooler/EPRI Summary Rpt Attach 2 "As tested" Test matrix 34 pgo.

TEAuble/EPRI data sununary sheets & Valve inspection WBilanin/EPRI rpt sununarising EPRI/Wyle Phase III IG-3,5 testing of Fisher controls RV MNED 0103002 10/6/81 JHooler/EPRI Memo Transmits 2 attach 1) test summary 1 pg.

TEAuble/EPRI 2)"As tested" matriN WB11anin/EPRI 13-3,5 MNED 0103003 10/6/01 JHosler/EPRI Attach 1 EPRI/PWR S/RV Test prog.

1 pg.

TEAuble/EPRI PROV test sumanary Muesco controle RV WB11anin/EPRI 18-3,5 MNED 0103004 10/6/81 JHooler/EPRI Attach 2 "As tested" Test matrix data 26 pg3.

TEAuble/EPRI susunary sheets & Valve inspection WB11anin/EPRI rpt on EPRI/Wyle Phase III testing of Muesco controls RV 18-3,5 MNED 1039910 10/5/01 JHoeler/EPRI Memo Transmits 2 attachs 1) test sumanary 1 pg.

TEAuble/EPRI 2)"As tested" test matrix WB11anin/EPRI 18-3,5 MNED 0103911 10/5/31 JHooler/EPRI Bussary Attach 1 PORV test sununary Copes-1 pg.

TCAuble/EPRI Vulcan WBilanin/EPRI 18-3,5

4{b' 85-l'

_ _Lt. t r From/To/ Entity Doc. Type Doc. Debeription t

j MNED 0103912 10/5/81 JHooler/EPRI Summary Rpt Attach 2 "As tested

  • Test matrix data 32 pgs.

TEAuble/EPRI sheets & valve inspection rpt on EPRI/

WB11anin/EPRI Wyle Phae III Testing of Copes-Vulcan 15-3,5 RV utilizing a 316 w/ stellite plug +

17-4 cage MNED 0103944 10/5/81 W911anin/EPRI Memo S/RV test activities from 9/26-10/2 2 pgs.

IS-3 MNED 0104753 10/21/81 Cocof fer/ PGs t Memo Attached are joint intervenor's I pg.

PACrane/PGEE interrog. on pressure heaters & valves 18-3,4,5 I

MNED 0104896 7/28/80 Bruce King / Westinghouse Letter Attached copy of rev. 1 (7/1/80)

I pg.

SM8kidmore/PG&E of EPRI prog. plan for performance 10-3,5 testing?of PWR S/RV MNED 0104897 7/1/80 Mo Mame/EPRI Report Prog, plan for the performance 105 pgs, testing of PWR S/RV MNED 0105776 1/18/80 JWRizzi/ Tech. for Energy Corp.

Letter Enc. copy of technology for energy I pg.

RJStreich/PGEE corp's quality assurance manuel. If manual in controlled, acknowledge receipt.

MNED 0I05864 8/2/79 Gordon Shugers/EPRI Le tte r RV scoustic monitoring workshop 2 pg].

TMI Coordinators invitation IS-5 MNED 0105866 8/22/79 Mo Mame/EPRI Agenda RV acoustic monitoring workshop 1 P9 IS-5

\\

I"y.

t!".,

DATE From/To/ Entity Doc. Type Doc. D:rcription MNED 0109148 9/17/81 RMLaverty/PGER Memo EPRI utg to discuss status of the 3 pgs.

File /PGEE S/RV testing prog. w/2 attachs 15-3,5 MNED 0109151 9/10/81 RMLaverty/PGGE Mandwritten Attach 1 PCEE/EPRI utg to discuss 9 pgs.

Notes S/RV testing prog.

18-3,5 MNED 0109159 9/10/81 RMLaverty/PGEE Mandwri.tten Attach 2 PG&E/EPRI mtg to discuss g

2 pgs.

Notes S/RV testing prog.

13-3 MNED 0109169 9/4/81 JVRocca/PGER Request for Request to send RMLaverty to EPRI 2 pgs.

Authorisation utg to discuss SV performance 18-3 i

MNED 0112094 3/30/81 No Name/Muc. Assoc.

Report Benchmark calculation for EPRI S/RV test 43 pgs.

18-3,5 MNED 0112562 7/6/81 JEMurphy/ Westinghouse Letter Performance testing of S/RV w/ attach 3 pgs.

RFBenton/PG&E IS-3 e

-yew s

40 Dttb. No '

DATE From/To/ Entity Doc. Type Doc. Description NNED 0112847 No name/PGEE Outilne 2 pgs.

No Name/PGEE Package on contention 24 valve testing 15-5 NNED 0112919 5/1/80 No Name/EPRI Report Prog, plan for the performance testing 9 pga.

No Name/PGEE of PNR S/RV 18-3,5

.iNED 0112928 4/21/01 GCNinor/No Affil Affidavit Affidavit te Issees re to PORV's &

9 pgs.

No Name/PG&E block valves IS-3 NNED 0113017 4/1/81 DVRelly/PG5E 1 pg.

IstLaverty/PGEE Letter PNR block valve test PCEE file IS-5 TEAuble/EPRI 8161.52 Units 1&2 Diablo NNED 0113018 4/1/81 TEAuble/EPRI 2 pgs.

deduced Letter Velan block valve IS-5 NNED 0113030 1/20/81 I pg.

DVKelly/PC&E JJCarey/EPRI Letter IS-3,5 EPRI S/RV test prog.

I L

NMED 0113054 4/27/81 No Name/PG6E I pg.

Nandwritten Testing of PSR PORV's & Safety's l

IS-5 Notes NMED 0113091 11/80 10 pgs.

No Name/NRC No Name/PGER Report Performance testing of Boiling-Nater 15-3,5 Reactor &

Relief and SafetPressurized-Nater Reactor Section 2.1.2{ y Valves (NUREG-0578,---

+/

Mf ED Ull 5109 5-1-81 No Ccoe/A2LB Partici Diccc cing tocto on retctor coolant 7 pga.

No C%me/PC&3 Report cyo, rs11af velvas, Safsty Valvaa cnd Block valyzo to be completed prior to IS-4,5 e

fund loading MNED 0113178 5/7/81 Mtg Notes Discussing EPRI Working rpt 1 pg.

i IS-3,5 1NED 0113193 5/10/81 TEAuble/EPRI Memo Dissemination of date for EPRI/PWR 2 pgs.

Dist. list /PG&E S/RV test prog.

IS-3,5 MNED 0113195 5/81 TEAuble/EPRI Peport PORY Test data summary & prog, from 4 pgs.

Dist. list /PCEE EPRI 10-5 MNED 0113198A 5/11/81 RSRuffman/

Memo Rpt Certification w/ refurbishment of 1 pg.

SHChin/EPRI electromatic relief valve 15-3,5 MNED 0113199 5/13/81 TEAuble/EPRI Letter Transmitting draft rpts on valve 2 pg].

gnu /PG&E l

tests for PORV's & block-valves l

IS-3,5 MNED 0113201 4/22/81 TEAuble/EPPI Draft Rpt PROV's & block valves test results 33 pgs.

No Mame/PG6E 10-3,5 MMED 0113233 5/13/81 TEAuble/EPRI Letter Transmitted herewith I pg.

RI.averty/ PGE E 15-3,5 l

l

__=

42 they.

Ho.,

DATE From/To/ Entity Doc. Type Doc. Description 4

MNED 0113233 5/15/01 JJCarey/EPRI Memo EPRI/PWR S/RV test prog. testing 2 pga.

Dist. list /

activities for 5/11-5/15 18-3,5 MNED 0113236 5/8/01 TEAuble/EPRI Memo Dissemination of data for EPRI/PWR 2 pg2.

Dist. list /

S/RV test prog.

IS-3,5 MNED 0113238 4/30/81 SHChin/EPRI Report Data summary sheet for PORV test 4 pg 3.

7-TR-7W 15-3,5 MNED 0113242 2/81 No Mame/EPRI Report PWR S/RV test prog, description &

8 pgs.

No Name/PGsE status 18-3,5 MNED 011325P 12/4/80 JNosler/EPRI Report EPRI/PWR R/BV test prog. Prog. output /

11 pgs.

No Name/PGER utility responsibilities IS-3,5 s

MNED 0113261 I/13/01 JJCarey/EPRI Cover Ltr Transmitted herewith

! pg.

I IS-3,5 MNED 0113262 1/13/01 JJCarey/EPPt List Utility review of EPRI valve test prog.

I pg.

12/5/80 agenda 18-3,5 MNED 0113263 1/13/01 JJCorey/EPRI List Attendance list to utility review of 1 pg.

the EPRI/PWR S/RV test prog.

18-3,5 4

i

43 l_hy

!*o._ _ _ _

t>NIE From/To/ Entity Doc. Type Doc. Dwecription MNED 0113264 12/5/80 JHoeler/EPRI Report EPRI/PNR S/RV test prog, status rpt 26 pgs.

update IS-3,5 MNED 0113290 12/5/80 JHosler/EPRI Report EPRI/PWR S/RV test prog. approach.for 5 pgs.

justifying test conditions IS-3,5 MNED 0113295 12/500 JHooler/EPRI Report EPRI/PWR S/RV test prog. approach for 9 pgs.

justifying test conditions 18-3,5 MNED 0113304 3/24/81 JJCarey/EPRI Cover Ltr Attached valve status rpt 1 pg.

18-3,5 MNED 0113305 3/81 JJCarey/EPRI Report EPRI/PWR S/RV test prog. status rpt 21 pgs.

for 3/81 IS-3,5 MNED 0113336 3/21/75 No Mame/PGs Drawing of Pressuriser relief line I P9 1

IS-5 MNED 0113337 8/80 No Mame/PGEE Drawing Of PORV 1 pg.

1 IS-5 AMED 0113338 O/6/80 No Mame/PGEE Drawing Data outline 1 pg.

IS-5 l

44-

  • Due. [3o.

DATE From/To/ Entity Doc. Type Doc. Description NNED 0113339 3/21/75 No Name/PGEE Drawing Of pressurlzer RV system 1 pg.

IS-5 MNED 0113354 10/20/76 AGwalther/PGEE Memo Response to DP-p.1116-M Pre-1 pg.

File /PGst operational piping dynamics effects test prog.

18-5 MNED 0114494 9/29/81 DGBisenhut/NRC I,etter TMI action plan relief / safety valve 1 pg.

No Name/PGEE testing IS-3,5 MNED 0114495 8/17/81 NJDircks/NRC Letter Revised sched 4 completion of TMI 4 pgs.

No Name/PGER Action Plan R/SV IS-3,5 MNED 0114499 7/1/01 RCYoungdahl/EPRI Letter Status of EPRI/PWR S/RV 3 pgs.

Nerold R. Denton/NRC HUREG-0737 18-3,5

.MNED 0114502 7/1/01 No Name/EPRI Report EPRI/PWR S/RV test pr M ram 43 pgs.

No Name/PG&E IS-3,5 MNED 0114545 Deduced Darrell G. Eisenhut/NRC Outline Revised sched 4 completion of TMI 6 pgs.

7/1/81 No Name/PG6E action plan item R/SV i

18-3,5 MNED 0114600 10/15/81 JNoster/EPRI Letter Util Tech /Licensng contacts (Section 1 pg.

No Hame/PGEE 3.4 of S/RV-AE IS-3,5 MNED 0114601 10/15/81 JNosler/EPRI Study EPRI/PWR S/RV test prog.

1 pg.

No Mame/PGEE pwr operated relief valve Test Susanary IS-3,5 MNED 0114602 10-15-81 JHosler/EPRI Study Re EPRI/Nyle Phase III Garrett 1 pg.

No Name/PGEE Corp R/V 18-3,5 MNED 0114603 10-15-81 JRosler/EPRI Table Wyle Phase III Test matrix 4 control 1 pg.

No Name/PGER Components R/V

J gg te l l it,0 4 e / 21/t;l flo Name/Wyle I.ah Sununary chest Data summary chtet for PORV tset 97-GA-15 8/21/81 1 p in.

No HIme/PGEE 2 3 -},5 MNED 0114607 8/21/81 No Name/Wyle Lab Report Data supunary sheet for PROV test 3 pga.

No Mame/PGEE l

98-CA-28 IS-5 NNED 0114610 0/22/01 No Name/Wyle Lab Report Data sununary sheet for PORV test 3 pga.

No Name/PGEE 99-GS-3W IS-5 14NED 0114613 g/22/81 No Name/Nyle Lab Report Data susunnry sheet for PORV tent 3 pg.

No Nesne/PG6E 100-CA-4W

[

12-5 4

I

Doc. No.

DATE From/To/ Entity Doc. Type Doc. D Mcription NNED 0114616 8/24/81 No Napie/Wyle Lab Report Data sumanary sheet for PORV Test 3 pg3.

No Name/PGsE 101-GA-5N 15-5 NMED 0114619 8/24/01 No Name/Wyle Lab Report Data sunenary sheet for PORV tent 3 pg3.

No Mame/PCSE 102-GA-6W IS-5 MNED 0114622 9/25/81 No Mame/wyle Lab Aport Data sununary sheet for PORV test 3 pg3.

No Mame/PGsE 013-GA-lW 18-5 NMED 0114625 8/25/81 No Name/Myle Lab Report Data sumanary sheet for PORV test 3 pg2.

No Name/PGEE 104-GA-8S/W 18-5 NNED 0114628 8/26/81 No Name/Nyle Lab Report Data susanary sheet for PGRV test 3 pg3.

No Name/PGSE 105-CA-9 W/W ID-5 AMED 0114631

@/26/81 No Name/wyle Lab Report Data sumanary sheet for PORV test 3 pgs.

No Name/PGsE i

106-GA-10 W/W 18-5 NNED 0114634 8/27/01 8HChin/Ee t Outline Valve disassembly inspection 1 pg.

o IS-5 NNED 0114635 8/27/81 SHChin/EPRI List Assem1by procedure 1 pg.

18-5 i

47 (li >c. No.

DATE From/To/ Entity Doc. Type Doc. Description tinre 011 A *.17 st / ? 7 / fll Garrett Pheumatic Flyn. Div.

List 3x6 straight thru PORV Wyle test t pg.

configuration I r.

r.

v irst o i l -t s- ' 9 g/79/nl DGEinenhut/NRC Bevised schedule for completion of c

1 pg.

TMI action plan item 18-3 MNED 0114641 9/22/81 JVRocca/PG&E Letter Diablo EPRI 8/RV test prog.

1 pg.

CW8u111 van /EPRI 18-3,5 MNED 0114649 7/24/81 RCYoungdahl/EPRI Imtter 3 pgs.

HDenton/NRC Status of EPRI PWR S/RV test prog.

15-3 NUREG 0737 MNED 0114652 8/31/81 No Name/PC&E Randwritten 1 pg.

B81ew/PCSE "No atrategy on block valves-Have agreed to EPRI Prog."

18-5 1

48

,y tb

_,,PAIH From/To/ Entity Doc. Type Doc. Dercription MNED 0114653 8/31/81 No Name/PG&E Handwritten re 7/17/81 atg w/NRC & util.

3 pgs.

to discuss block valve program IS-5 MNED 0114675 7/3/81 DABrand/PGEE Memo Re PGER funding for PCsE block 1 pg.

GAManeatis/PGEE valve testing prog. w/3 ettaches.

15-5 MNED 0114675 7/29/81 No Name/Jnt. Intervenors Statement Attach 1 Joint intervenor's statement 1 pg.

deduced of clarified contentions 18-5 MNED 0114680 6/24/81 BWShackelford/PGEE Draft Ltr Attach 2 Draft 1tr to EPRI from PGEE 1 pg.

FLCuller/EPRI comuniting to participate in the proposed block valve test prog.

18-3,5 WRD 0114681 6/24/81 BWShackelford/PGSE Draft Ltr Attach 3 Draft Lir to EPRI from PG&E I pg.

D8 axe /EPRI comuniting to participate in the proposed block velve test program IS-3,5 MNED 0114682 6/23/01 RMLaverty/PG&E Memo Re the need for PG6E to incrernse spending 1 pg.

DVRelly/PC8E in the EPRI valvo test program 18-3,5 MNED 0114683 6/16/01 Ftruller/EPRI Letter Enc.1tr's re EPM S/RV prog. w/3 attach.

1 pg.

Chief Exec. officers owning PWR's 18-3,5 MNED 0114604 6/15/01 F14u11er/EPRI Letter Attach 1 PWR S/RV test program 2 pgs.

Chief Exec. Of f. Owning PWR's 18-3,5

- - - -. ~....

49 Iloc. 130.

1) ATE From/To/ Entity Doc. Type Doc. D3 cription MNED 0114686 5/30/91 No Mame/EPRI Status Rpt Attach 2 status rpt from EPRI re EPRI 4 pgs.

PNR S/RV test prog.

18-3,5 ANED 0114690 6/15/81 No Name/EPRI Report attach 3 EPRI rpt on sequence of events 3 pgs.

deduced re testing of Dresser 6x8 Spring operated safety valve 18-3,5 MNED 0114694 6/15/81 FLCuller/EPRI Letter New requirement for MUREG 0737, 3 pga.

Chief Exec. Dff. owning p4fR's qualification of PWR block valves w/1 attach 18-3,5 MNED 0114697 6/10/81 No Name/EPRI Draft Study Attach 1 EPRI Task action plan for 16 pgs, verification of PWR block valve functionability 18-3,5 MNED 0114714 6/23/81 RMLaverty/PGsE Memo The need for PGEE to increase spending I pg.

DVKelly/PGas in the EPRI valve test prog.

IS-3,5 MNED 0114715 5/26/81 JJCarey/EPRI Letter Letter to transmit the table of contents 3 pgs.

s description of the Interim data rpt frosi EPRI for the S/RV test prog.

IS-3,5 MNED 0114718 5/14/81 DVRelly/PGsE Letter Corrections 4/1/81 Itr from DVRelly to 1 pg.

TEAuble/EPRI EPRI re PWR block valve test prog.

w/1 attach.

18-5 MNED 0114719 4/1/81 DVRelly/PGsE Letter Attach 1 info concerning the SGPORV block 1 pg.

TEAuble/EPRI valves requested from EPRI IS-5

_m

_.m.

.6 0 In st. No.

DATE From/To/ Entity Doc. Type Doc. Description MNED 01:4722 5/13/91 RMLaverty/PGGE Ilandwritten EPRI S/RV test program 1 pg.

GWu/PG&E Memo IS-3,5 MNED 0114724 5/5/81 DVKelly/PG&E Letter Analysis of R/SV to Net the requirements 1 pg.

JEMurphy/Wettinghouse of NUREG 0737 IS-3,5 MNED 0114725 2/18/81 No Name/PG&E Handwritten Nrc decision re S/RV testing 1 pg.

BSLew/PGEE IS-3,5 MNED 0114729 3/2/81 BSlew/PGEE Phone Record 7 block valves tested at Marshall 1 pg.

RMLaverty/ PG& E 6

Steam facility 18-3,5 MNED 0114731 2/19/81 No Name/PG&E Handwritten EPRI block valve testing for 1 pg.

Note NUREG 0737 18-3,5 MNED 0114732 1/9/81 RMLaverty/PG&E Memo EPRI S/RV test prog. resulted from 1 pg.

DVRelly/PG&E NRC requirement-ISec. 2.1.2 of MUREG 0578) 18-3,5

.MNED 0114733 1/8/81 No Name/PGGE Handwritten EPRI S/RV for MUREG 0737 1 pg.

JJCarey/EPRI Note 18-3,5 MNED 0114734 9/4/80 BW9hackelford/PGEE Letter Authorization for PG&E to comunit 1 pg.

DSame/EPRI

$187,500 to EPMI Phase I effort for S/RV test program 18-3,5

.. _ _ - - - - - -.... ~ -

Poe. Ilo.

DATE From/To/ Entity Doc. Type Doc. Dercription MNFD 0114741 9/4/80 BW8hackelford/PGsE Letter Authorization for PCsE to comunit 1 pg.

DSaxe/EPRI

$187,500 to EPRI Phase I effort for S/RV test program IS-3,5 MNED 0114742 12/5/80 No Name/PGEE Handwritten Completion dates on tests performed 2 pg3.

Note by EPRI for S/RV test prog.

IS-3,5 MNED 0114744 11/10/80 JJCarey/EPRI Letter Next utg of util review group to be 1 pg.

Tech. contacts helf on 12/5/80 to review EPRI test prog status 18-3,5 MNED 0114745 11/10/80 AJWheeler/EPRI Letter EPRI Recomunendation that utils initiate 3 pga.

Arch. Eng. & Cons. Co's.

prog, to evaluate design basis & prepare for new load cases which result fross EPRI 18-3,5 test prog.

MNED 0114756 7/6/91 DAnrand/PG5E Memo Request that PGSE commit to increased 1 pg.

GAManeatis/PGSE funding requested by CPRI to continue S/RV test prog. w/2 attach.

18-3,5 M4ED 0114757 7/7/01 BW8hackelford/PGEE Letter Attach 1 PG6E conwnitment to EPRI to 1 pg.

D8 axe /EPRI participate in the jaint block valve test prog.

18-3,5 MNED 0114758 7/7/81 BW8hackelford/PGSE Letter Attach 2 PCsE comunitment to EPRI to 1 pg.

FLCuller/EPRI continue participation in the joint S/RV test prog.

18-3,5

.MNFD 0114759 6/16/81 FIruller/EPRI Letter Enc. froen EPRI Itre re S/RV test prog.

1 pg.

Chief Exec. Off. Owning PWR's

& joint block valve prog. w/3 attach.

IS-3,5 I

3 poc., Nls.

DATi!

Prom /To/ Entity Doc. Type Doc. Description MNED 0114760 6/15/81 FI, Culler /EPRI I,etter Attach 1 PWR S/RV test prog. need for 2 pgs.

Chief Exec. Off. owning PWR's guldence & financial comunitment for corspletion of prog.

I3-3,5 MNED 0114762 5/30/81 No Name/EPRI Sununary Ppt Attach 2 status rpt from EPRI re EPRI 4 pgs.

PWR S/RV test prog.

18-3,5 MNED 0114766 6/15/81 No Name/EPRI Sunenary Rpt Attach 3 sequence of events re testing 4 pgs.

deduced of Dresser 6x8 Cpring operated safety valve 18-3,5 MNED 0114770 6/15/81 FIruller/EPRI I,etter New requirements for NURE 0737 2 pgs.

Chief Exec. Of f. of Co. 's Qualification of PWR block valves 18-3,5 owning PWR's 2 attach MNED 01147J2 6/15/81 No Name/EPRI susanary Rpt Attach 1 EPRI/PWR block valve task I pg.

action plan 7/1/01 thru 1/1/83 cost estimate sununary 18-3,5 MNED 0114773 6/10/81 No Name/EPRI Draft Study Attach 2 EPRI task action plan for 16 pgs.

verification of PNP. block valve functionability IS-3,5 MNED 0114789 5/1/01 JBHoch/PG&E Memo EPRI Generic S/RV test prog. Itr 5 pgs.

Joschuyler/PG&E

'IPI-277 18-3,5 MNED 0114796 3/30/81 AMRSIA/Nuc. Assoc Int'1.

Report Relap/8/Repipe benchmark calculations 29 pgs.

for EPRI S/RV tests 18-3,5

m a.as.J

-~.-w-.-

Sb

'a'.

DArr:

From/TofEntity Doc. Type Doc. Da"cription 2

MNED 0114922 3/3/81 BSLew/PG&E Memo Comunents on EPRI valve testing prog.

1 pg.

JDShiffer/PG&E JBHoch/PG&E 18-3,5 MNED 0114923 11/26/80 JJCarey/EPRI Memo Agenda for util. review of EPRI valve 1 pg.

Tech, contacts test prog. w/ attach 18-3,5 MNED 0114924 12/5/O0 JJCarey/EPRI Agenda Attach util. review of EPRI valve test 1 pg.

prog. agenda IS-3,5 MNED 0114926 2/5/01 JJCarey/EPRI Cover Ltr Attached copy of Feb. status rpt 1 pg.

18-3,5 MNED 0114927 2/81 No Name/EPRI Report PM.' S/RV test prog. description & status 90 pgs.

18-3,5 I

l

5 iiiv.. No.

ImTE From/To/ Entity Doc. Type Doc. Description MNED 0115018 8/20/81 JJCarey/EPRI IItter PWR S/RV prog. contingency analysis I pg.

BJorgenson/ Westinghouse efforts 15-3,5 MNED 0115019 8/81 No Name/EPRI Report Schedule to agreement w/ Westinghouse 7 pgs.

No Nasme/ Westinghouse

& EPRI IS-3,5 MNED 0115026 8/28/80 JJCarey/EPRI Memo Prog. Review & Status I pg.

IS-3,5 MNED 0115027 9/23/80 No Name/EPRI List PWR S/RV test prog. util. review atg 1 pg.

prella. agenda 15-3,5 NMED 0115033 6/10/80 WCGangloff/PG4R Memo Discussing Crosby valve test i

1 pg.

DVRe11y/PG6E g

IS-3 MNED 0115034 5/80 No Name/EPRI Article EPRI exec. rpt 4 pgs.

15-3,5 MNED 0115038 5/13/80 RMLaverty/PGER Memo Discussing Crosby valve test fpg.

WCGengloff/PG6E IS-3,5

((

' Mr. No.

DATE, From/To/ Entity Doc. Type Doc. Dercription MNED 0115039 5/13/80 RMLave r ty/mepr)

Memo Discussing Crosby valve test 1 pg.

1S-3,5 MNED 0115041 5/8/80 JJCarey/EPRI Letter A thank you for "Rpt of tests of 1 pg.

RMLaverty/PG6E Crosby style HV valves on loop seal" S-3,5 8

.4NED 0115045 12/21/79 FFMautz/PGE&

Cover Ltr Enc. isometric drawings of piping

{pgs.

JJCarey/EPRI 18-3,5 MNED 0115047 12/79 FFMautz/PGGE Tables Tables & Drawings on DC overpressure 6 pgs.

JJCarey/EPRI Protection Sys.

18-3,5 MNED 0115059 11/79 No Name/EPRI Mtg Notes Discussed adding issues raised by 1 pg.

NUREG 078 18-3,5 MNED 0115057 12/21/79 FFMautz/PG6E Letter Discussing EPRI's relief valso system 2 pgs.

JJCarey/EPRI 18-3,5 7

MNED 0115060-11/26/79 Milton Levenson/EPRI Letter EPRI relief valve prog.

2 pgs.

Chief Exec. Off./PG&E 18-3,5 MNED 0115062 11/21/79 No Name/EPRI Plan Rev. 2 Prog. plan for the performance 76 pgs.

verification of PWR S/RV & systems 18-3,5

Sb

.- Ile s.

l'h 8 M From/To[gntity Doc. Type Doc. Description t;;IED 0115138 12/21/79 FFMautz/PG&E Letter EPRI RV Prog.

2 pgs.

JJCarey/EPRI IS-3,5 MNED 0115140 12/20/79 No Nome /PGEE Handwritten Safety valve tests 1 pg.

Notes IS-3,5 MNED 0115141 12/79 MNorem/PCEE Handwritten Pressurizer safety valve testing 2 pgs.

deduced IS-3,5 MNED 0115143 12/11/79 J RStevenson/ PGER Mao Valve testo startings test data 1 pg.

RML/

IS-5 MNED 0115144 12/79 No Name/EPRI Request Request to PNR owners for assistance 1 pg.

deduced re relief & safety valve systems by EPRI 18-3,5 MNED 0115145 12/26/79 JJCarey/EPRI Handwritten Relief & Safety valve tests 1 pg.

potes 18-5 BKin9 Nestinghouse Letter PG&E/EPRI pressurizer S/RV tent prog.

/

MNED 0115150 3/17/80 I pg.

SM8kidmore/PG&E IS-3,5

.b /

Doc. No.

DATE From/To/ Entity Doc. Type Doc. Dercription i

MNED 0115155 2/6/80 No Mame/EPRI Program Prog. plan for performance verification of PWR S/RV and systems 29 pgs.

15-3,5 MNED 0115184 12/3/79 BKing/Nestinghouse I.e tte r EPRI S/RV test prog.

I pg.

JNGormly/PGEE 18-3,5 MNED 0115105 11/29/79 BKing/Nestinghouse 1,e tte r Input for EPRI S/RV test prog. w/ attach.

I pg.

18-3,5 MNED 01151s6 11/29/79 Bring /Nestinghouse Report Attach. General description & tech.

parameters 9 pgs, 15-3,5 MNED 0115195 12/10/79 BKing/Nestinghouse Letter EPRI 8/RV test prog, w/ attach.

I pg.

NJGormly/PG&B 15-3,5 MNED 0115196 12/10/79 FSchmidt/MPR Assoc.

Report Attach. Preparation for a recommended 28 pgs.

deduced tent prog. in responre to NUREG 0578 re R/5V 18-3,5 l

i

bh l

j I,w. t b, -

, liATE

_ Jrom/To/ Entity Doc. Type Doc. Descripticyj l

MNED 0115224 2/14/80 BKing/ Westinghouse Letter EPRI S/RV cest prog. w/ attach

! pg.

HJGo ule/PGEE 18-3,5 MNED 0115225 1/28/90 DPilof fman/ Consumers Pwr Co.

Letter Attach. EPRI S/RV test prog. 1/21522/80 2 pgs.

No Mame/PG&E mtgs w/attachs.

IS-3,5 MNED 0115227 1/28/80 DPHoffman/ Consumers Pwr Co.

Minutes Attach. Minutes of 1/21/80 mtg 3 pgs.

w/ attach A,B,C.D IS-3,5 MNED 0115230 1/28/80 DPHoffman/ Consumers Pwr Co.

Agenda Attach A EPRI S/RV test prog. 1/21/80 1 pg.

utg (Consolidated Edison)

IS-3,5 MNED 0115231 1/21/80 DPHoffman/ Consumers Pwr Co.

Attendees List Attach B EPRI S/RV test prog.

I pg.

IS-3,5

.MNED 0115232 1/15/80 NGJones/ Yankee Atomic Elec. Co.

Letter Attach CWEL Approach to satisfy 2 pgs.

No Meme/PG&E MURE 0578 Item 2.1.2 (R/SV)

IS-3,5 MNED 0115234 1/3/80 CHChenry/NRC Memo Attach D Comuments on proposed EPRI 1 pg.

JHOlshinski/NRC

" Prog. plan fo the performance verification of PWR S/RV & systems" 18-3,5 12/13/79 w/ attach.

MNED 0115235 1/3/80 JCCherny/NRC Report Attach A Comuments on proposed EPRI 5 pgs.

" Prog. plan for the performance verification of PNR S/RC & systems I8-3,5 12 13/79

[Y Di e-. tiv.

1*TF:

From/To/ Entity Doc. Type Doc. Description MNED 0115240 1/9/80 No Name/PG4E Memo Comunents on S/RV testing (Questions)

I pg.

Ashok/No Affil.

IS-3,5 MNED 0115241 1/9/80 BRBownan/LLL Letter Comunents on EPRI Prog. plan for per-2 pgs.

J01shinski/NRC formance evaluation of PWR S/RV &

systems w/ attach IS-3,5 MNED 0115243 1/9/80 BRBowman/LLL List Attach Organisstion/ Responsibility 1 pg.

for EPRI S/RV test prog.

18-3,5 MNED 0115244 1/22/00 No Mame/PG&E Minutes Minutes of 1/22/00 mtg re EPRI S/RV 1 pg.

e test prog. w/ attach.

18-3,5

,MNED 0115245 1/22/80 No Mame/PG&E Report Attach Recoaunendations to EPRI S/RV 10 mjs.

test prceg.

18-3,5 MNED 0115255 1/00 Mo Mame/PG&E Request Request to PWR Owners for assistance 1 pg.

re R/SV systems 18-3,5 MNED 0115256 12/90 Mo Mame/EPRI Report Examination & test of Crystal River 123 pgs.

Unit 93 PORY & Safety valves PWR S/RV test prog.

15-3,5 e

e

M

, Doc. 180 DATE Frosa/To/ Entity Doc. Type Doc. Description MNED 0118729 3/3/81 BSLew/PGEE Memo Comunents on EPRI valve testing i pgs.

JDShlffer/PG6E prog.

18-3,5 MNED -118730 3/2/81 BSLew/PGEE Phone Memo EPRI Valve testing prog.

I pgs.

'_1MLave r t y / PG& E VS-3,5 MNED Gil8731 2/20/81 NHSechan/PGEE Phone Meino PORV's I pg.

RHowe/PCEE 15-3,5 MNED 0118791 7/15/81 GCWu/PGER Phone Mesmo Valve testing I pg.

FCherny/NRC IS-3 MNED 0118792 7/13/81 GCWu/PG&E Phone Memo Valve testing I pg.

JCarey/EPRI IS-3 MNED 0118793 7/16/01 RLTedesco/NRC Memo Brd notification-EPRI S/RV testing I pg.

As&LB Brd for DCPP Unite Is2/NRC prog. Units 152 18-3,5 MNED 0118794 6/15/80 GCwu/PG&B Phone Memo Valve testing 2 pgs.

JJCarey/EPRI 18-3,5

bl e

tono. Blo.

IsATI; From/To/ Entity Doc. Type Doc. De"cription MNED 0118870 10/22/81 JVRocca/PG&E Memo PORV block valves 1 pg.

J Eilech/ PCE E 18-5 MNED 0118873 9/24/81 RHEngelken/NRC Letter Enc. test sunumary rpt te adverse 2 pgs.

PACrane/PC&E results from equipment testing w/ attach.

18-3,5 MNED 0118875 9/24/81 RIIEnge lken/N PC Letter US NPC IE IMPO 881-29: Equipment 12 pgs.

PACrane/PC&E qualification testing experience (attach) 15-3,5 9

MNED 0118933 9/18/81 DGEisenhut/NRC I,e t te r Proposed procedures development &

2 pgs.

RWJurgensen/ Westinghouse evaluation prog. CSFRG's & implementation IS-3 on NUREG 0737 target dates MNED 0118935 9/29/01 DGEisenhut/NRC Letter Revised schedule for completion of TMI 1 pg.

Gentlemen /PG&E action plan Item II.D.1, R/SV testing 18-3 (Generic Itr 981-36)

MNED 0118936 8/17/81 WJDircks/NRC Memo Revised schedule for completion of TMI 4 pgs.

Cossaissioners/NRC sction play Item II.D.1, R/BV testing 18-3 w/ attach MNED 0118940 7/1/81 RCYoungdahl/EPRI Letter Attach 1 status of EPRI PWR 8/RV test 3 pgs.

MRDenton/NRC Prog. NUREG 0737, Item II.D.1 IS-3 MNED 0118943 7/1/91 No Name/EPRI Report Attach 2 EPRI/PWR 8/RV test prog.

42 pgs.

18-3 l

MNED 0118985 7/1/81 DGEisenhut/NRC Letter Attaen 3 Revised sched. for completion 6 pgs.

deduced Gentlemen /PG&E of that action plan Item II.D.1 R/8V 18-3 testing (NUREG 0737 reved pgs enc.)

MMED 0118991 9/30/81 CW8u111 van /EPRI Letter EPRI block valve efforts underway to 2 pgs.

TEL Contacts support utility responses to NUREG 0737 w/ attach.

18-3,5 L

6A l, un_1 taey.

_ isAI U Frosa/To/ En tit'y Doc. Type Doc. Description MNED 0110993 8/26/81 JJCarey/EPRI Letter Attach 1 EPRI efforts to support util.

2 pgs.

DHoffman/Consusmers Pwr Co.

responses to NUREG 0737 re block valves 18-3,5 MNED O!!O995 g/81 No Name/EPRI Data Attach 2 compilation of the list of 6 pgs.

block valves used in PttR's.

15-3,5 4

emumpu

1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

PACIFIC GAS AND ELECTRIC COMPANY

)

Docket No. 50-275

)

Docket No. 50-323 Diablo Canyon Nuclear Power Plant, )

Units 1 and 2

)

)

CERTIFICATE OF SER7 ICE The foregoing document (s) of Pacific Gas and Electric Company inux (have) been served today on the following by deposit in the United States mail, properly stamped and addressed:

Judge John F. Wolf Mrs. Sandra A.

Silver Chairman 1760 Alisal Street Atomic Safety and Licensing Board San Luis Obispo, California 93401 U.

S. Nuclear Regulatory Commission Washington, D.

C. 20555 Mr. Gordon Silver 1760 Alisal Street Judge Glenn O.

Bright San Luis Obispo, California 93401 Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission John Phillips, Esq.

Washington, D.

C. 20555 Joel Reynolds, Esq.

Center for Law in the Public Interest Judge Jerry R.

Kline 10951 W.

Pico Boulevard - Suite 300 Atomic Safety and Licensing Board Los Angeles, California 90064 U.

S. Nuclear Regulatory Commission Wa shingt on, D. C. 20555 David F. Fleischaker, Esq.

P. O. Box 1178 Mrs. Elizabeth Apfelberg Oklahoma City C/o Nancy Culver Oklahoma 73101 192 Luneta Drive San Luis Obispo, California 93401 Arthur C. Gehr, Esq.

Snell & Wilmer Janice E.

Kerr, Esq.

3100 Valley Bank Center Public Utilities Commission Phoenix, Arizona 85073 of the State of California 5246 State Building Bruce Norton, Esq.

350 McAllister Street Norton, Burke, Berry & French, P.C.

San Francisco, California 94102 3216 N. Third Street Suite 300 Mrs. Raye Fleming Phoenix, Arizona 85012-2699 1920 Mattie Road Shell Beach, California 93449 Chairman Atomic Safety and Licensing Mr. Frederick Eissler Board Panel Scenic Shoreline Preservation U. S. Nuclear Regulatory Commission Conference, Inc.

Washington, D. C. 20555 4623 More Mesa Drive Santa Barbara, California 93105 l

\\

Chairman Judge; Thomas S. Moore Atomic Safety and Licensing Chairman Appeal Panel Atomic Safety and Licensing U.

S. Nuclear Regulatory Commission Appeal Board Washington, D.

C. 20555 U. S. Nuclear Regulatory Commission Washington, D.

C. 20555 Secretary U. S. Nuclear Regulatory Commission Judge W. Reed Johnson Washington, D.

C. 20555 Atomic Safety and Licensing Appeal Board Attn.:

Docketing and Service Section U. S. Nuclear Regulatory Commission Washington, D.

C. 20555 William J. Olmstead, Esq.

Bradley W.

Jones, Esq.

Judge John H. Buck Office of Executive Legal Director Atomic Safety and Licensing BETH 042 Appeal Board U.

S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 Washington, D.

C. 20555 Mr. Richard B. Hubbard MHB Technical Associates 1723 Hamilton Avenue, Suite K San Jose, California 95125 Mr. Carl Neiberger Telegram Tribune P.

O. Box 112 San Luis Obispo, California 93402 Herbert H. Brown, Esq.

L wrence Coe Lanpher, Esq.

Christopher B.

Hanback, Esq.

Kirkpatr,ick, Lockhart, Hill, Christopher & Phillips 1900 M Street, N.W.

Washington, D.

C. 20036 Byron S. Georgiou, Esq.

Legal Affairs Secretary Governor's Office Stcte Capitol Sacramento, California 95814 NN v

/

P' 1Tp A. Cra le, Jr.

Attornet Pacifi Gas and Electric Company Dnte: January 11, 1982