Ack Receipt of Transmitting Complete Revision to Decommissioning Fundamental Nuclear Matl Control Plan. Proposed Revision Generally Acceptable;However Matl Control & Accounting Program Requires Mod
ML20040A376
Person / Time
Site: Wood River Junction
Issue date: 10/05/1981
From: Randy Erickson
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Gregg R
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
References
NUDOCS 8201200825
Download: ML20040A376 (5)


Text

-

Q,,

Q g.

p g u..

A g.

p p.

Retur.. to NMSS/SGML, Mail Stop 881-SS DISTRIBUTION:

PDR/LPDR Docket file 70-820 NMSS r/f Case file SGML:CWE OCT 5 1931 MCL r/f 70-820 SGPL CEmeigh CNSmith DWeiss WBrown, :E United Nuclear Corporation FGillespie, RES Recovery Systems Division RPage, FC ATTN: Mr. R. Gregg, Manager JJoyner, Reg. I Plant Operations

'\\

/

One Narragansett Trail Wood River Junction, Rhode Island 02894 Gentlemen:

This is in response to your letter dated August 21, 1981 which transmitted a complete revision to your Decommissioning Fundamental Nuclear Material Control Plan.

We have determined that the proposed revision is gcnerally acceptable; however, to ensure that all relevant requiremcats are satisfied, we have found it necessary to require that your material control and accounting progrm be modified in certain areas. Accordingly, the new license i

conditions reflected in Enclosure 1 are being added to your license.

The rationale for imposing these conditions is also provided as appro-priate. These new conditions were discussed with Mr. Gregg of your staff on October 2,1981.

In order to incorporate the new conditions.

required exemptions, and withdraw obsolete conditions, Sections 1.0 through 8.0 of Amendment MPP-2 to Special Nuclear Material License No.

SNM-777 are hereby revised as set forth in Enclosure 2, effective immediately.

l We have determined that the enclosure to your letter dated August 21, l

1981 contains information of a type specified in 2.790(d). Accordingly, pursuant to Section 2.790(d)(1), such information is deemed to be commer-l cial or financial information within the meaning of 10 CFR 9.5(a)(4) an shall be subject to disclosure only in accordance with the provisions o, h4, 10 CFR 9.12.

Sincerely,

, fEC, 6

Robert A. Erickson, Acting Chief kdoo choo0020 flaterial Control and Accountability l

C PDR Licensing Branch 1 0/1 /81

Enclosures:

I

-As-stated

^

o"'co scML..c: E.

.sGt'. b..

.sGMt.

svanwg CEmeigh/jml

.Cf i

.RAEr c on.

l

^"> 10/g/8!.

1 0/;2 /81 10/.g.t81 emc rcmu aio no,80amcu 0:do OFFICIAL RECORD COPY 4 -

-32n24

I 1.0 FACILITY ORGANIZATION f

1.4 The responsibility for administering the material control and accounting program on a day to day basis shall be assigned to an on-site individual.

4 Assignment of the 70.58(b)(1) responsibilities to the Manager Nuclear Safeguards, UNC-NP is acceptable only if there is individual on-site responsibile for day to day administration of the MC&A program.

3.0 MEASUREMENTS 3.3 Notwithstanding the requirement of 10 CFR 70.5S(e) to measure the uranium and uranium-235 content of processed lagoon sludge shipped i

off-site, the licensee may ship this oaterial on the basis of uranium and uranium-235 values determined at the time of discard to the lagoon.

I 4.0 MEASUREMENT CONTROL 4.1 Notwithstanding the requirement of 10 CFR 70.57(b) to establish and me.intain a detailed measurement control program, the licensee shall follow Chapter 4.0 of the Plan identified in License Condition 1

2.1 provided the book inventory is less than one effective kilogram.

5.0 PHYSICAL INVENTORY 5.2 Notwithstanding the requirements of 10 CFR 70.51(e)(3) to conduct physical inventories at two and six month intervals for high and low enriched uranium respectively, the licensee shall follow Section 5.2 of the Plan identified in License Condition 2.1.

i 7.0 INTERNAL CONTROL 7.3 NRC approved seals only shall be used for tamper-scaling of containers.

1 Although the Plan connits to tamper-sealing in accordance with " accepted" t

sealing practices, a commitment to use only NRC approved seals is not included.

4 1

1

Revision of Sections 1.0 Through 8.0 in Their Entirety to Materials and Plant Protection Amendment MPP-2 to License No. SNM-777 Effective 9/30/81 1.0 FACILITY ORGANIZATION l.1 Notwlthstanding the requirements of 10 CFR 70.57(b)(2) to perform reviews and audits of the measurement control program, the licensee is exempt from such reviews and audits during the decommissioning of the Plant.

l.2 Notwithstanding the requirements of 10 CFR 70.57(b)(3) to perform reviews and audits of a contractor's measurement control program at Intervais not to exceed cvory 12 months, the !icensee is exempt from thIs requirement.

l.3 Notwithstanding the requirements of 10 CFR 70.58(c)(2) to perform reviews and audits of the nuclear material control program at least every 12 months, the licensee is exempt from this requirement.

l.4 The responsibility for administering the material control and accounting program on a day to day bas's shall be assigned to an on-site Individual.

2.0 FACIL!TY OPERATION 2.1 The 11censeo shall follow the Decommissioning Fundamental Nuclear Material Control Plan transmitted with correspondence dated August 21, 1981 and as revised in accordance wiih the provisions of 10 CFR 70.32(c).

2.2 No statement In the licenseo*s Plan Ident1 fled in Condition 2.1 shall rolleve the licensee of a requirement of 10 CFR Part 70 unless granted in a specific exemption or except1on set forth as I

a condition of this license.

l 2.3 Operations involving special nuclear material which are not described In the Plan identifled In Condition 2.1 shall not be initiated until the appropriate safeguards plan has been approved by the Nuclear Regulatory Commission.

2.4 All SNM not in transit shall be physically within an MBA or ICA except as noted below:

2.4.1 Notwlthstanding the requirement of 10 CFR 70.58(d) that MBAs and ICAs be established for physical and administrative control of nuclear material, the SNM in the lagoon and the lagoon residue awalting transfer to burial need not bc assigned to an MBA or ICA.

. ~. -

. 3 3.0 MEASUREMENTS j

3.1 The licensee or his designated shall measure except as specified in 10 CFR 70.58(e) and Conditions 3.2 and 3.3, the uranium and uranium-235 content of all special nuclear materlel shipments, waste discards, and materlal on Inventory.

3.2 The uranium content of materials measured by nondestructive assay may be calculated based on enr!chment provided it can be demonstrated that the enrichment value is representative.

Reprasentative is defined as traceable to the source of the SNM.

4.0 KASUREMENT CONTROL 4.1 Notwithstanding the requirements of 10 CFR 70.57(o) to establish and maintain a detailed measurement control program, the licensee shall follow Chapter 4.0 of the Plan Identified in License Condition 2.1 provided the book Inventory is less than one j

effective kilogram.

4.2 All Instruments used for material control and accounting purposes shall be calibrated over the range of operation, and results outside the range shall not be used.

5.0 PHYSICAL INVENTORY 3

l 5.1 Notwlthstanding the requirement of 10 CFR 70.51(e)(4)(1) to calculate j

a limit of error associated with an Inventory Difference determination, the licensee need not calculate a 11mli of errar during the f acility j

deconmissioning.

l 5.2 Notwithstanding +he requirements of 10 CFR 70.51(c)(3) to conduct physical Inventories at two and six month Intervals for high and

]

low onriched uranlum respectively, the licensee shall follow i

l Section 5.2 of the Plan identified in License Condition 2.1.

6.0 RECORDS AND REPORTS 6.1 The licensee shall establish a separate account for accumulation of all material gains resulting from the facility decommissioning.

I 2

i f

. 7.0 INTERNAL CONTROL 7.1 Accurate records shall be established and maintained which provide on a dally basis knowledge of the Identity, location, and quantity of all SSNM within each plant In discrete items and containers.

7.2 Two individuals shall attest to the contents of containers at the time of tam.aer-safing.

7.3 NRC approved seals only shall be used for tamper-safing of containers.

8.0 MANAGEVENT 8.1 Any apparent loss of a discroie iten or container which cannot be resolved by an immediato investigation shall be reported to the Manager of Quality Assurance who shall Immediately notify the Region Of fice of the Nuclear Regulatory Commission and shall conduct an Investigation of the loss. The Manager of Quality Assurance shall document the results of his Investigation and maintain the record for five years, t