Ro:Emergency Svc Water Valves Discovered Not Being Tested Per Tech Specs.Power Reduced Until One Valve Tested & ESW Train Declared Operational.Followup to Be Submitted by 820121
ML20040A267
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/11/1982
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8201200641
Download: ML20040A267 (1)


Text

3 AN

$3

,7J0 LANA & A9/CHIGAy ELECTRIC COMPANY N

DONALD C. COOK NUCLEAR PLANT

-/>

P.O. Ilox 45R, Ilr an ichigan 49106

-l January ll, 1982 y

')

C.

Mr. J. G. Keppler, Regional Director G

Office of Inspection and Enforcement

/

,,j United States Nuclear Regulatory Commission "i 'y Region III 799 Roosevelt Road Operating License DPR-74 Glen Ellyn, IL 60137 Docket No. 50-316

Dear Mr. Keppler:

This is to confirm two telephone notifications made to the Nuclear Regulatory Commission on Friday, January 8,1982 at 1750 hours0.0203 days <br />0.486 hours <br />0.00289 weeks <br />6.65875e-4 months <br /> and 1753 hours0.0203 days <br />0.487 hours <br />0.0029 weeks <br />6.670165e-4 months <br />, to inform Mr. E. R. Swanson, NRC Region III Inspector and the Nuclear Regulatory Commission Operations Center, utilizing the " red phone", of the following finding:

During a review of surveillance test procedures to verify that all technical specification test requirements were fulfilled, it was discovered that two ESW valves were not being tested as required by T/S 4.7.4.1.b.

As required by the Action Statement for T/S 3.7.4.1 power reduction commenced at 1825 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.944125e-4 months <br /> until one of the affected valves could be tested. At 1837 hours0.0213 days <br />0.51 hours <br />0.00304 weeks <br />6.989785e-4 months <br /> the East ESW train was declared operational and the requirement to reduce power was terminated.

A followup report will be submitted by January 21, 1982 as required by Technical Specification Section 6.9.1.8.

Sincerely, r

G Sm Plant Manager

/pmk cc:

J. E. Dolan R. S. Hunter R. W. Jurgensen R. F. Kroeger K. J. Vehstedt E. R. Swanson/N. DuBry R0:III R. C. Callen MPSC 8201200641 820111 PDR ADOCK 05000316 J. M. Hennigan s

PDR W. Lavallee EPRI Jul J4g PNSRC INP0 J. F. Stietzel Dir.

IE (40 copies) 2 ~ ra