ML20040A208
| ML20040A208 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 01/06/1982 |
| From: | Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML20040A193 | List: |
| References | |
| NUDOCS 8201200533 | |
| Download: ML20040A208 (3) | |
Text
I f
i
(
OPERATING DATA REPORT DOCKET NO.
50-255 DATE 1-6-82 CO3fPLETED BY TMPet om nn TELEP110NE (616 W6h-8913 OPERATING STATUS
- 1. Unit Name:
Palicades N"
811201-811231
- 2. Reporting Period:
- 3. Licensed Th'ermal Power (MWI):
2530
- 4. Nameplate Rating (Gross MWe):
011 7
- 5. Design Electrical Rating (Net MWe):
805
- 6. Masimum Dependable Capacity (Gross MWe):
"675
- 7. Masimum Dependable Capacity (Net MWe):
- 635
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Repor:.Gise Reasons:
- 9. Power Level To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restrictions. lf Any:
This Month Yr. to-Date Cumulatise Ibb 07b0 07,975
- 11. Ilours In Reporting Period
- 12. Number Of Ilonn Reactor Was Critical lh3.9 s200.8 48,723.2
- 13. Reactor Resene Shutdown liours l
- 14. Ilours Generator On-Line
.2 5010.9 h6,20h.h
{
- 15. Unit Resene Shutdown flours
~
110h 11,703,528 91,407,26h
- 16. Gross Thermal Energy Generated (MWil) 0 3,663,5h0 28,227,950
- 17. Gross Electrical Energy Generated (MWil) 0 3,h62,629 26,512,931 i
- 18. Net Electrical Energy Generated (MWil) 0 57.2 5?.5
- 19. Unit Senice Factor q
- 20. Unit Asailability Factor 57.2 52 5
- 21. Unit Capacity Factor (Using MDC Net) 0 62.2 h7.5 O
h9.1 37.h
- 22. Unit Capacity Factor (Using DER Net) 09 1h.1 33.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each t:
l L
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
01/02/82
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICA LITY INITI A L ELECTRICITY COMMERCIAL OPER ATION
- Based on condenser back pressure 8201200533 820114 (9/77)
PDR ADOCK 0500 R
... ~
m
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255
(
UNIT Palisades DATE l-6-82 COMPLETED BY DAPeterson 616 764-8913 TELEPilONE MONTil December 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(yw,.g,,)
0 0
1 7
0 18 0
0 3
39 0
0 0
4 20 0
0 5
21 0
6 0
yy 7
0 0
23
(
0 8
u 0
9 25 0
0 10 26 0
0 11 27 0
0 I ~,
28 0
0 13 29 0
14 30 n
15 n
31 0"
16 0
INSTRUCTIONS On this format. list the ascrage daily unit power leselin MWe. Net for each day in the reportine month. Compute to u nearest whule megaw.a l
- 10 min. of Generator on line not enough to change generator gross meter indication.
(9/77)
-g w-
-e-n,
,.,~-ay
,,,,,,.-,-.:,,-,.--.,e
_. - ~ _..
. -. -.. _ ~. - ~.. -.
~.
O i
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-255 UNil NAME h11sades DATE l-6-6?
REPORT MON Jil Decer.ber 1981 COMPLETED BY DVn Nuere TELEPilONE fA W 76h 80rt
(
1 n.
4 _o E 5"
.=2 _:
ci E
,sa Licensee r,
g.
Cause & Corrective
- o No.
Date g
g jgy gvent 37 63 Action to m
Report 2r rE G 5U Prevent Recurrence
$5
~ dj ={
e u
e O
7 81-08-29 s
7h2 c
1 8
81-12-31 F
2 A
3 Turbine control problems t
I e
I i
i i
f I
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for 1.icensee C Refueling
- 3. Automatic Scram.
Event Report iLI:R) Fde iNtiltl:G-D Regulatory Restriction 4-Other l'ixplain) 0161) li-Operator Training & License Examination F Administrative 5
G-Operational Error (Explain)
Exhibit I Same Source 4
19/77)
II.Olher (lixplain) ia t-
-._