Text
tinB osure to Serial: RSEP/82-31 Page 1 of 5 OPERATIt:0 DATA REPORT DOCEPT !!O: 50-261 DA'l E :T 0105 COMPLETED LY: 11 Rav !? orris TELLPlioi;E: 803-383-4524 OPERATJNG STAT 11S llo t e n.
- 1. Unit f;ame: 11. B. Robinnon Unit Two There are presently 113 spent fuel
- 2. Reporting Period: 811201, 00007 811231, 2400 ansemblies stored in the spent fuei
- 3. Licenced Ther mal Power (II.!t ):
2300 pool.
- 4. !?anoplat e Rat ing (Gross I?.le):]l9
- 5. Imign Elect rical Rat ing (!!c t t r..'e ) : 700 6.11ax inun Dependable Capacit y (Gros <. f r.ie): 700
- 7. !!axiuum Dependable capacit y (! et !!We ) : G5 C. If Change: Occur in Capacity !;atingn (Iten.1;ua.ber 3 through 7) Since Last Re p o r t-, Cive Reanonr.
?;o chan;*e.
- 9. Power Level t o Which Kest rict ed, If Any (t et FNe): %535 (80% Reactor Power)
- 10. Reasonn For Rentrictions, If Any:
Althouch the_ unit is not restricted by any outside
_ agenc;; the power level is presently reduced due to steam generator considerationn.
This !! ant h Yr.-to-Date Cumulative
- 11. llaurn in Iteport ing Pi riod 744 8760 94,926 12 i oebc. o f
- ..,u.. Ecat. l oi Nas Cr it icoi 671.43 tohu.14
/ 2 34 5. t. 2
- 13. React or 1:eserve Shut down llours 0
~ 107.42 10S '>. 3 0 14 !!ours Generator On-Line 632.56 63'J6.49 70555.31
- 15. Unit Rererve Shutdown Ilourn o~"
0 23.20
- 16. Gronn Thermal Energy Generated (!!Ull) 1,039,737~~
11,883,00J 143,095,3/4 -
- 17. Gros. Elect rical Energy Generat ed (!C11)
~~T3T7+TtI~ ~ 3,73),76T 7 COT 5,970-
- 18. !!ct 1: leet :1 cal 1:nergy Generat ed (1:WH) 3UFii67i-~
3,50T'7 F 437Clo,251-l 's. Unit Service Factor 65.0 T 73.01
/4.32-20 Unit Availability Tactor
~ ~lI'I.02 73.01 74.3s-~
- 21. lin it Ca pac i t y Fa ct or (th.ing MDC !!et )
62.M 60.14 69.10
- 22. Unit Capaci t y Fact or (l'c J un bl:R !!et) 59.50 57.13 65.64
- 23. Unit forced Outage Rate 14.97~~
21.23 14.59
- 24. Shut dowtu; Scheduleil over !Jo:t 6 !!anths (Type, Date, and Duration or Each)':
refueling /mr.lutenance outage _in late winter.
- 25. If Shut Down At 1:nd of Report Period, Estinatel Date f Startup:
- 26. Uaits In Tent Stato:. (P: ac e to Ccmcrcial Gperat 'on):
Forecast Achicved INITJAL CRITICALITY A
INITIAL ELECTRICITY COMMERCI AL OPl: RATION 1
F2D12OO403 820114 8 PDR ADOCK 05000261 1
R PDR
~
I
Page 2 of 5 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-261 UNIT _ II. B. Robinson T 820105 DATE CO5!PLETED By
- 11. Ray Norris TELEPilONE 803-383-4524 MONT1: __ December DAY
/,yEg A GE DAILY POWER LEytt DAY AVERACE D.\\lLY POWER LEVEL (5t h Net)
IMWe Neti I
-6 97
-20 2
18 550 3
-20 39 556 362 4
20 561 5
424 21 Sig 29 6
22 462 216 7
s 345 24 553 403 9
10 408 26 560 g3 404 27 548 522 12 2S 547 13 559 29 451 14 561 30 557 15 560 31 559 528 16 INS 1 RUCTIONS On this formst,tist the symge daily unit power levet in MWe Set for each d:y in the reporting mo the ocatest whole mepwstt.
(9/7TI
_.m
____m_.
Enclosure to Serial: RSEP/81-31 Page 3 of 5 UNITS!!UTDOWNS AND POWER REDUCTIONS Dg O.
Robtnson Unit DATE 9W" REPORTMONTl! December CO.\\t."LETED I:Y H.
Rav Norris TEl.LPl!ONE 803-383-4524
=
E
,$?
E=
$.Y E Licensee
,5%
ft Cause & Currective No.
Date g
3g 5
j g&
Event
- 7 c-3 Action tu f5 5
di e Report :
80 5'
Prevent Recurrence 8-g v
O 12-01 811201 F
54.73 A
1 81-26 MB HTEXCH S/G Tube Leak (Continuation) 12-02 811203 F
16.32 A
1 HH VALVEX "B" WRV Malfunction 12-03 811206 F
11.01 A
1 Mi
- VALVEX, "B" WRV Repaired
~
12-04 811206 F
3.11 A
3 EA INSTRU Rx trip due to low S/G level and steam flow - feed flow mismatch 12-05 811207 F
7.15 A
3 BB INSTRU Grounded limit switch "B" MSIV shut, resulting in low S/G 1evel.
'12-06 811216 F
19.12 A
l' HA PUMPXX "B" EH Pump Seal Leak 12-07 811207 F
A 4
HH VALVEX Load reduction due to "B" feedwater reg. valve (HiaP across valve) 12-08 811221 F
A 4
SH VALVEX Load reduction due to "B" FWRV drain line leak; 12-09 811228 F
A 4
HH PUMPXX Load reduction due to "A" main feed pump recirc. line leak I
2 3
4 F: Forced Reason:
Method:
S: Ssl:edu!cd A Equipment Fai ure(Exp!:In) t-Manual Exhibit G Instructions for Preparatin of Data Itataintenance of Test 2 Manu21 Scrarn.
Entry Sheets for !.iecnsee C Rciueling 3 Autornati: Scram.
Event Repin t (I.I.'R) life (NUREC.
D Regula:ory Restri;; tion 4 Other (Explain) 016 )
L43perator Tr:,ining & License Examinsaion F Aduu:mtra:ive G Operati.:nal in cur (Explain) 5 (9/77) 1104her (Explain)
Exhibit I Same Source
i' OPERATING DATA REPORT
- Corrected Copy DOCF,ET NO: 50-261 DATE: 811203 COMPLETED DY: !!. Ray Norris TELEP110NE: 803-383-/A24 OPERATING STATUS Notes:
- 1. Unit Name:
- 11. B. Robinson Unit Tw There are presently 113 spent fuel
- 2. Reporting Period: 811101,0000/811135,M O assemblics stored in the spent fuel
- 3. Licensed Thermal Power (MN): 2300
- 4. Nameplate Rating (Gross N.Jc):~739 1
- 5. Design Electrical Rating (Net FMe): 700
- 6. M1ximum Dependable Capacity (Cross FMe): 700
- 7. Maximum Dependable capacity (Net FNe):_665 l
- 8. If Changen Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Cive Reasons: No change.
- 9. Power Level to Which Restricted, If Any (Net FMe): %325 (50% Reactor Pcwr)
- 10. Reasons For Restrictions, If Any:
Although the unit is not restricteil by any oufaIde~
agency, the power IcVel is presently reduced due to steam generator considerations.
l This Month Yr.-to-Date Cumulative l
- 11. I!vut s Jn br.c.rring Pc:-1:;d 720 8016 94,182
- 12. Number of Ilours Reactor Was Critical D 7 F ~ 7 908./1 71673.99' l13.ReactorReserveShutdownllours 0
- 107.42
- 1085.30
- 14. Ilours Generator On-Line 163.13 5763.93 69922.75
- 15. Unit Reserve Shutdown llours 0.00 0.00 23.20
- 16. Cross Thermal Energy Cencrated ()Mll) 182,326 10,843,264 142,055,638
- 17. Cross Electrical Energy Cencrated (FMll) 55,381
_3,404,745 45,743,512
- 18. Net Electrical Energy Generated (lMll) 43,006 3,193,905 43,310,357
- 19. Unit Service Factor 22.65 71.90 74.24
- 20. Unit Availability Factor 22.65 71.90 74.26
- 21. Unit Capacity Factor (Using MDC Net) 8.98 59.92 69.15
- 22. Unit Capacity Factor (Using DER Net) 8.53 56.92 65.69
- 23. Unit Forced Outage Rate 77.3a 21.92 14.59
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, arid Duration of Each):
Refueling / Maintenance Outage in late winter.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
12-1-81
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPEIMTION (9/77) og p.
-m l
Page 5 of 5 OPERATING DATA REPORT
- Corrected Copy DOCKET No: 50-261 DATE: 811103
)
COMPLETED BY: M. Watford TELEPHONE: 803-383-4524 OPERATING STATUS Notes:
- 1. Unit Name: __II.
B,_Rshinson Unit Tun There are presently 113 spent fuel
- 2. Reporting Period: 811001, 0000/811031, 2400 ssemblies stored in the spent fue]
- 3. Licensed Thermal Power (MWt): 2300 pool.
- 4. Naueplate Rating (Groes MUe): 739
- 5. Design Electrical Rating (Net MWe): 700
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe): 665
- 8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons:
No change.
- 9. Power Level to Which Restricted, If Any (Net MWe): 4325 (50% Reactor Powori
- 10. Reacons For Restrictions, If Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.
This Month Yr.-to-Date Cumulative
- 11. Ilours in Reporting Period 745 7296 93.462
- 12. Number of Ilours Reactor Was Critical 745 5737.96 71.503.24 l
- 13. Reactor Reserve Shutdown Hours
- .00
- 107.42
- 1085.30
- 14. Ilours Generator On-Line 735.80 5600.80 69.759.62
- 15. Unit Reserve Shutdown llours 0.00 0.00 23.20
- 16. Gross Thermal Energy Generated (MWil) 843,881 10,660,938 141.873.312
- 17. Gross Electrical Energy Generated (MWil) 25.',864 3,349,364 45.688.131
- 18. Net Electrical Energy Generated (MWil) 232,179 3,150,899 43.267.351
- 19. Unit Service Factor f8.77 76.77 74.64
- 20. Unit Availability Factor 98.77 76.77 74.66
- 21. Unit Capacity Factor (Using MDC Net) 46.86 64.94 69.62
- 22. Unit Capacity Factor (Using DER Net) 44.52 61.70 66.13
- 23. Unit Forced Outage Rate 1.23 15.87 14.03
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Two outages are planned within the next six months: one in early November nna n refueling / maintenance outage in late winter.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup: on line.
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) eg l