a JOSEPH M. FARLEY NUCLEAR PLtVT UNIT 2 NAPJtATIVE SLTL.RY OF OPERATIONS DECEMBER, 1981 There was one (1) power reduction and one (1) automatic shutdown in the month of December.
The follcuing safety-related maintenance was performed in the month of December:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Replaced packing on #6 river water pump.
t l
i l
l 8201190351 G20111 DR ADOCK 05000364 PDR 1
i
2 I
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 1/01/82 COMPLETED BY W.G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS Notes 1) Cumulative data since
- 1. Unit Name:
.T s o ph M.
Pa rl ov - t'n it 2 7/30/81 date of commercial
- 2. Reporting Period:
December. 1o91 operation.
- 3. Licensed Thermal Power (MWt):
2652
- 4. Nameplate Rating (Gross MWe):
60
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
8 f'O
]
- 7. Maximum Dependable Capacity (Net MWe):
813 7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
i Item #7 has been changed due to evaluation of operatine exnerience.
- 9. Power Level To which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions If Any:
'3 / A
(
This Month Yr.-to.Date Cumulative
- 11. Hours in Reporting Period 744 3,721 3,721
- 12. Number Of Hours Reactor Was Critical 741.2 3,680.2 3.680.2
- 13. Reactor Reserve Shutdown Hours 2.8 40.8 40.8
- 14. Hours Generator On Line 740.1 3.666.5 3,666.5
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1 012 505 A 9.466.157.6 9.466.157.6 17 Gross Electrical Energy Generated (MWH) 626.760 3.071.178 1.071.17s
- 18. Net Electrical Energy Generated (MWH) 596,950 2,920.720 2.920.720
- 19. Unit Service Factor 99.5 96.5 98.5 99.5 98.5 98.5
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 98.6 96.5 96.5 96.6
- 22. Unit Capacity Factor (Using DER Net) 94.7 _
94,7 00.5 01.5 01.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Main eenerator insnectic,n: April. 1982. annroximatelv eicht (8) days.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status t Prior to Commercial Operation):
Forecast Achieved
(
i i
INITIAL CRITICALITY 5/06/91 s /ng /qi l
INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPERATION 8/01/Cl 7/30/81 (u/771 t
~,
/
DOCKET NO.
50-364 DAE 1/n /R2 COMPLETED 8Y W.G. Hairston, III s'
7711 PHONE ( >n% 899-5156 MONTl! Marb e r. 1981 DAY AVERAGE DAILY POWER LEVEL,
DAY AVERACE DAILY POWER LEVEL (SIWE Net)
(MWe-Net) t, 789 37 814' 821 13 817 3
!!? 'i 19 7 71 4
791 20 822 3
754 21 824 6
R25
=
546 824 7
,3 796
.n N
824 g
aj 807 9
822
- S 812^
10 828 26 783
~ '
3g 813
=
817 g
772 812'
.3 13 818 818 3
823 14 R12 30 821
[3 R1 n 3g 16 818 EL'CTIONS On this form:t. list the sversge daily unit power levet in MWe-Net for each d:y in the reportmg month. Compute to Itc neare:t whule rnepwatt.
~
m (9(77)
A e
e-
>N J
UNIT SilulDOWNS AND POWER REDUC 110NS DOCKET NO.
50-364 UNIT NAME J.M. Fa rlev-l' nit 2 -
DATE 1/01/82 NEPORT MONTil De cembe r, 1981 COMPLETED Fy J G.
Ilairston, III TELEPiloNE (205) 899-5156 i
L
'5 E
.2'E g
.gsg Lkensec E't, E*L c
re g
Cause & Costective No.
()aic g
3g j g oc Event u2 a.1 Action so
$5 sE ji$g Repori 8 fU E0 Pacient Recunence 6
0 34 811204 S
0 B
4 N/A IB ZZZZZZ Unit power reduced to and held at
$58 IHe to perform 13P-0-STP-33. lb (Safeguards Test Cabinet Train B Functional Test).
035 811222 F
3.9 A
3 N/A 1111 INSTRU Reactor trip due to loss of SCFP 2A during routine testing of local contrc,1 panel switch positior' indicators. A shorted diode gave a signal for manual trip of the SCFP.
I 2
3 4
F: Forced Reason:
MethoJ:
Exhibit G. instsuctions S: Scheduled A Equipment Failure (Explain) l Mar.aal for Psepasation of Data li Maintenance or Test
- 2. Manual Scram.
Entry Sheces for Licensee C Refueling 3-Automatic Scrain.
Event Reposi (l.ER) File iNUR0G-l D-Regulaiosy Restsiction 4-Other (Explan )