ML20039G960

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1981
ML20039G960
Person / Time
Site: Farley 
Issue date: 01/11/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20039G961 List:
References
NUDOCS 8201190349
Download: ML20039G960 (1)


Text

-

Malhng AddtCss

- Alabarna Power Company 500 North 18th Street Post Off4ce Dos 2641 84rmingham Alabama 35291 Te'ephone 205 783-6081 F. L Clayton Jr.

Senior Vice President ghggg gr r

Fhntndge Building the southern electnc system January 11, 1982 Docket No. 50-364 A

Director, Of fice of Management

  1. 10 79 Information and Program Control

[

,14[G gIb82.h. ;

U. S. Nuclear Regulatory Commission

-3 Washington, D.C.

20555

Dear Sir:

f RE: Joseph M. Farley Nuclear Plant Monthly Operating Data Report Unit No. 2 Attached are two (2) copies of the Decemoer, 1981 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan F,.

Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

[

If you have any questions please advise.

Yours very truly,

_1

\\,I. ( <<

~'

.,2.,;..(

r.

n F. L'.~Clayton, Jr.

FLCJr/KKM:bhj Attachments l

cc:

Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) 9201190349 820111 b' /

PDR ADOCK 05000364 PDR

/

R