ML20039G822
| ML20039G822 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/06/1982 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20039G823 | List: |
| References | |
| NUDOCS 8201190184 | |
| Download: ML20039G822 (2) | |
See also: IR 05000460/1981012
Text
_ _ _ _ _
.
.
.
-
..
-
)
$
$
~
-
.
JAN 6 1082
'
Docket f;o. 50-460, 50-513
A
p
s-
?
Rh2iV2O
f
Mashington Public Power Supply System
P. O. Box 963
E
gD 3 ISS2h
"%*p'P
,'
3000 George Hashington Way
Richland, Washington 99352
r
g
Attent'en:
Mr. D. W. Mazur
'/
s
,
Program Ofrector, WNP-1/4
N
Gentlemen:
Subject:
NRC Inspection of Washington Nuclear Projects 1 and 4
This refers to the routine inspection conducted by Mr. P. P. flarbut of
this office on December 14-18, 1981 of activities authorized by NRC
Construction Permit No. CPPR-134, and CPPR-174 and to the discussion of
our findings held by Mr. Narbut with Mr. Mazur and other members of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response to this notice is to be submitted in accordance with the
provisions of 10 CFR 2.201 as stated in Appendix A. Notice of Violation.
I
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
(
will be placed in the NRC Public Document Room unless you notify this
office, by telechom. within ten days of the date of this letter and
'
l
subnit written application to withhold infomation contained therein
'
witniit thirty days of the date of this letter. Such application must be
consistent with the requirements of 2.790(b)(1).
l
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
/6Cl
l
"'c' W E
. . . .h .
khM8C o!hho*g"o
" "I
. M. .
.
su.~.w p! .NARBU mrf,. .
D0805
"-
'
FA 'w.ENBERRYi82"~
G
I
..,, / 5ya2~"
. ".iyy78i
"
'"
" "i
..l.
. . .
.
.. . ....
.
sac roau mo cisacu ono
OFFICIAL RECORD COPY
=
*-m m
l
. .
i
.
..
.
. . -
-
-
.-.. ..
-
- _
' Washington Public Powar Supply Systen -2-
jgg
4
The re'.ponses directed by this letter and the accompanying Notice are
not subject to the clearance procedures of the Office of rtanagement and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
Sincerely,
gatFliiAL sic E9 U
!
R. T. CGt05'
.
-
B. H. Faulkenberry
Chief, Reactor Construction
!
Projects Branch
!
j
Enclosures:
A.
- lotice of Violation
B.
IE Inspection Report
Nos. 50-460/81-12
50-513/81-12
cc w/o enclosure B:
R. B. Glasscock. Quality
Assurance Director
bec: DMB/ Document Control Desk (RIDS)
Distributed by RV:
Engelken (ltr)
A. Johnson (ltr)
State of WA (Lewis)(4)
Resident Inspector
!