Forwards IE Insp Repts 50-460/81-12 & 50-513/81-12 on 811214-18 & Notice of Violation
ML20039G822
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/06/1982
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20039G823 List:
References
NUDOCS 8201190184
Download: ML20039G822 (2)


See also: IR 05000460/1981012

Text

_ _ _ _ _

.

.

.

-

..

-

)

$

$

~

-

.

JAN 6 1082

'

Docket f;o. 50-460, 50-513

A

p

s-

?

Rh2iV2O

f

Mashington Public Power Supply System

CC

P. O. Box 963

E

gD 3 ISS2h

"%*p'P

,'

3000 George Hashington Way

Richland, Washington 99352

r

g

Attent'en:

Mr. D. W. Mazur

'/

s

,

Program Ofrector, WNP-1/4

N

Gentlemen:

Subject:

NRC Inspection of Washington Nuclear Projects 1 and 4

This refers to the routine inspection conducted by Mr. P. P. flarbut of

this office on December 14-18, 1981 of activities authorized by NRC

Construction Permit No. CPPR-134, and CPPR-174 and to the discussion of

our findings held by Mr. Narbut with Mr. Mazur and other members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this notice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A. Notice of Violation.

I

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

(

will be placed in the NRC Public Document Room unless you notify this

office, by telechom. within ten days of the date of this letter and

'

l

subnit written application to withhold infomation contained therein

'

witniit thirty days of the date of this letter. Such application must be

consistent with the requirements of 2.790(b)(1).

l

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

/6Cl

l

"'c' W E

. . . .h .

khM8C o!hho*g"o

" "I

. M. .

.

su.~.w p! .NARBU mrf,. .

D0805

"-

'

FA 'w.ENBERRYi82"~

G

I

..,, / 5ya2~"

. ".iyy78i

"

'"

" "i

..l.

. . .

.

.. . ....

.

sac roau mo cisacu ono

OFFICIAL RECORD COPY

=

*-m m

l

. .

i

.

..

.

. . -

-

-

.-.. ..

-

- _

' Washington Public Powar Supply Systen -2-

jgg

4

The re'.ponses directed by this letter and the accompanying Notice are

not subject to the clearance procedures of the Office of rtanagement and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

gatFliiAL sic E9 U

!

R. T. CGt05'

.

-

B. H. Faulkenberry

Chief, Reactor Construction

!

Projects Branch

!

j

Enclosures:

A.

lotice of Violation

B.

IE Inspection Report

Nos. 50-460/81-12

50-513/81-12

cc w/o enclosure B:

R. B. Glasscock. Quality

Assurance Director

bec: DMB/ Document Control Desk (RIDS)

Distributed by RV:

Engelken (ltr)

A. Johnson (ltr)

State of WA (Lewis)(4)

Resident Inspector

!

l

.

m

I

'

.

!

!

l

1

f

l

i

!

l

~~

.

,

_

,,

_

_

. _ _ _ ._

._

.

..

.