ML20039G776

From kanterella
Jump to navigation Jump to search
Confirms 820115 Telcon W/Lazo Wherein SM Sohinki Granted Extension Until 820120 to File NRC Affidavit Re Concrete Slump Test at Facilities.Request Necessary Due to Federal Closing Due to Snow & Affiant L Vorderbrueggen Illness
ML20039G776
Person / Time
Site: Palo Verde  
Issue date: 01/15/1982
From: Sohinki S
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Callahan D, Cole R, Lazo R
Atomic Safety and Licensing Board Panel
References
NUDOCS 8201190121
Download: ML20039G776 (1)


Text

+

nu

.~

~

. wn-

~

y

  • W-

.d g

W y

giU#

f' s

January 15, 1982 Robert M. Lazo, Esq., Chairman Dr. Richard F. Cole Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensinq Roard U.S. fluclear Regulatory Commission U.S. fluclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 DISTRIBUTION Or. Dixon Callahan

,p h

~

IN Sohinki Administrative Judge Y

hu Union Carbide Corporation errez y

g

.,7 r,

P.O. Box Y jag'1Bj982> }.

S ar/Engelhardt Oak Ridge, TN 37830 Christenbury/Scinto J' j,I Olmstead n

s NPC Docket File: PDR/LPDR tte A m ona Pu c Co pany, et al.

h ___ _. -; I '

(2)

(Palo Verde Nuclear Generating Station, UnTtT'1, 2 and 3 n

  • 5 I

Docket Nos. STN 50-528 STN 50-529 and STN 50-530 r

n

Dear Administrative Judges:

This is to confirm the results of a telephone conversation between Judoe Lazo and the undersigned this morning, January 15, 1932, during which the under-signed requested and was granted an extension of time until January 20, 1982 to file the Staff's affidavit recarding concrete slump tests at the captioned facility. The request was necessitated by the closing of federal offices for a day and a half due to weather conditions, and the illness of Mr. Lucian Vorderbrueqqen, the senior resident inspector at the Palo Verde site, who is the author of the affidavit.

Sincerely, Stephen M. Schinki Counsel for NRC Staff t

cc: Arthur C. Gehr Esq.

Rand L. Greenfield Ms. Lee Hourihan Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Docketing and Service Section h_.SC7 ii l

o" cO!.. 0 ELD

! SMSobi p-d ;' v 8201190121 820115 u,, %,,4

"" N, 01.a 982.g

.f, DR

. I, iEJReis" PDR ADOCK 05000528 G

.i..

u c,c w m. m %.. a n ' '

OFFICIAL RECORD COPY

1 RE3)LAT3RY INFORMATION DISTRIBUTION SYSTEM (RIOS)

ACCESSI3N 131:32J1193121

)]C.3 ATE: S2/01/15 4]TARIZE3: N3 03CAET

  • F ACIL:STN-50-523 Del o Verde Nuclear Stetton,

'J n i t 1,

Arizona *uoli 05000529 S T 'l-5 0 - 5 2 7 391o /erde duelear Station,

'J n i t 2,

Arizona Duall 05000529 STN-50-530 Salo torde Nuclear Station, Unit 3,

Arizona Suoli 05000530 AUTH.NAME AJT134 AFFILIATION S3HIN<!,S.A.

Heari13 3 ranch 3 1ECIP.NAwE RECI?IE4T AFFILIATI3N LAZO,R.M.

Atoni:. Safety cnc Li:ensing Board Panel C3LE,R.F.

Atomi: Safety and Licensing Board Penel CALLAMAN,3.

Atosi: Ssfety ano Licensino Bosed Panel SJBJECr: Confirns 320115 tel:en */Lazo where in S4 Sobiqui granted exto,sio, antil 323120 to file NRC affidsvit ce concrete sluvo test at fa:ilities. Request necessary due to federal closina due to snod 1 offiant L.VorderorJeQJan illness.

DISTRI30T!3N C30E: 3S07S COSIES RECEIVED: L,T R j_ ENCL!$2 SIZE:

TITLE: ELO Filinas (Non-Antitrust)

NOTES: Standardized 31 ant.1.:y:C 3 rimes 35000529 Standaroized *Iant.1.:y:C 3 rises 05000529 Standardized 2-Isnt.1.:y:C 3 rimes 05000530 4

RECISIE11 CO2IES RECIPIENT:

COPIES 10 C3]E/1 A ME'

.lT T R ENCL 13 CODE /NAME' LTTR ENCLi ACTION:

LIC 39 83 3C 1

LIC.SR 83 LA.

1 3

( E R 113 A 'd, J.

1 INTERNAL: GC 1

IE 2

a 8A 1

SECY/OSB 01 2

?

EXTERNAL: L30R 1

NRC POR 1

NTIS 1

L l

ENCL:

fI

\\

T3TAL 1d43ER OF,C33IES RE3JIRED: LTTR pl

.-