ML20039G739

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1981
ML20039G739
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/01/1982
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20039G737 List:
References
NUDOCS 8201190072
Download: ML20039G739 (2)


Text

e.,

t OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/.21/S.2 COMPLETED BY tt c. Mnf raton, III TELEPHONE (205) 899-5156 OPERATING STATUS Notes 1) Cumulative data

1. Unit Name: Townh M.

Fa rlev - Un i e 1 since 12/01/77, date of

2. Reporting Period:

De cembe r, 19',1 c merdal operation.

3. Licensed Thermal Power (MWr):

2M2 860

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

844.6 803.6

7. Maximum Dependable Capacity (Net MWep
8. If Changes Occur in Capacity Ratings (Items Number.l Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A

(

This Month Yr..to.Date Cumulative l

11. Hours In Reporting Period 744 8,760 35,a,08 0

3.799.5 20,981.8

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

1,045.2 3,492.0

14. Hours Generator On-Line U

3.626.3 20.329.7 l

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 8.955.018.7

_5_(L 944. 910. 5 0

2,817,544 16.236.952.___

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)

-4354 2.615.974 15,223,724

19. Unit Service Factor 00.0 41.4 56,.8 l
20. Unit Availability Factor 00.0 41.4 56.8
21. Unit Capacity Factor (Using MDC Net)

-00.7 37.2 52.9

22. Unit Capacity Factor (Using DER Net)

-00.7 36.0 51.3

23. Unit Forced Outage Rate 00.0 21.8 10.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:.., Feb ruarv. 1982
26. Units In Test Status (Prior to Commercial Operationp Forecast Achieved INITIAL CRITICALITY 8/06/77 8/09/77 INITIAL ELECTRICITY 8_/20/7_7 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 J

=

8201190072 820111 PDR ADOCK 05000348

("/77)

R ppy w

y w

a

/

r

~.

50-348 N.

DOCKET NO.

.~

i 1

I

}

1; NIT DAE 1I01/82 l

COMPLETED BY W. C.

Hair 9 ton. III l

TELEPHONE. (205) 899-5156 i

?

MONTil De ce mbe r. 1981 i

DAY A ERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL

{

(MWe.Nu)

(MWe-Net)

. 1 g7

- g-l IS 2

n-

- l 3 g9 4 -

j

_0_ I * ~ ~

,3 6 -

n 7 23 m

g

(

g

,j

( 9

,3

_0_

l

  • 6 10

~@

11

-b

-0, 27

. i:

. :s

-a-13

9 I4 30 ~

31.. -

1S 1 ' '

16 ML'CT;ONS l

l On this form:t. list the sver:ge d:iiy unit power levelin MWe-Net for e:ch d:y in the reporting month. Compute to the ne:re:t whole mepwatt.

e wn j

g i

e

l l

'N s

l

/

l Y

UNITSilulDOWNS ANk) POWER REDUCI10NS DOCKET NO.

50-348 UNIT N AM E J., M.

Farlev-Unit 1 DA1E 1/01/82 D

COMI't.ETED BY W.G.

liairston, III REPORT MONTil ecember,1981 TEl.EPlf0NE (205) 899-5Db "L.

's = E 5

c c.

.2 8

.g 5 g 1.icensee E v,,

gn e

Cause & Corrective o

No.

Date g

Eg

,, g oc Event

r. T q

Action to syd u

b 3

5 ji$g Report #

Pscvent Recuirence 6

025 811201 F

744 A

3 N/A EB CENERA Cone.inued outage to repair damage to the main generator which occurred September 10, 1981.

~

l 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A fquipment Failure (Explain)

1. Manual fin Preparat!on of Data B-Maintenance or Test 24fanual Scram.

Entry Sheets for t.icensee C Refueling 3 Automatic Scram.

Event Report (l.ER) File (NUREG.

D Regulatoiy Restriction 4 Other (Explain) 01611 E-Ope ator Training & ticense Examination 1

F Administrative 5

G-Opesational Esrur (Explain)

Exhibit 1 - Same Source (9/77) 11 Other (Explain) 1

-