e.,
t OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/.21/S.2 COMPLETED BY tt c. Mnf raton, III TELEPHONE (205) 899-5156 OPERATING STATUS Notes 1) Cumulative data
- 1. Unit Name: Townh M.
Fa rlev - Un i e 1 since 12/01/77, date of
- 2. Reporting Period:
De cembe r, 19',1 c merdal operation.
- 3. Licensed Thermal Power (MWr):
2M2 860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
844.6 803.6
- 7. Maximum Dependable Capacity (Net MWep
- 8. If Changes Occur in Capacity Ratings (Items Number.l Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A
(
This Month Yr..to.Date Cumulative l
- 11. Hours In Reporting Period 744 8,760 35,a,08 0
3.799.5 20,981.8
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
1,045.2 3,492.0
- 14. Hours Generator On-Line U
3.626.3 20.329.7 l
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 8.955.018.7
_5_(L 944. 910. 5 0
2,817,544 16.236.952.___
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
-4354 2.615.974 15,223,724
- 19. Unit Service Factor 00.0 41.4 56,.8 l
- 20. Unit Availability Factor 00.0 41.4 56.8
- 21. Unit Capacity Factor (Using MDC Net)
-00.7 37.2 52.9
- 22. Unit Capacity Factor (Using DER Net)
-00.7 36.0 51.3
- 23. Unit Forced Outage Rate 00.0 21.8 10.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:.., Feb ruarv. 1982
- 26. Units In Test Status (Prior to Commercial Operationp Forecast Achieved INITIAL CRITICALITY 8/06/77 8/09/77 INITIAL ELECTRICITY 8_/20/7_7 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 J
=
8201190072 820111 PDR ADOCK 05000348
("/77)
R ppy w
y w
a
/
r
~.
50-348 N.
DOCKET NO.
.~
i 1
I
}
1; NIT DAE 1I01/82 l
COMPLETED BY W. C.
Hair 9 ton. III l
TELEPHONE. (205) 899-5156 i
?
MONTil De ce mbe r. 1981 i
DAY A ERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL
{
(MWe.Nu)
(MWe-Net)
. 1 g7
- g-l IS 2
n-
- l 3 g9 4 -
j
_0_ I * ~ ~
,3 6 -
n 7 23 m
g
(
g
,j
( 9
,3
_0_
l
- 6 10
~@
11
-b
-0, 27
. i:
. :s
-a-13
- 9 I4 30 ~
31.. -
1S 1 ' '
l On this form:t. list the sver:ge d:iiy unit power levelin MWe-Net for e:ch d:y in the reporting month. Compute to the ne:re:t whole mepwatt.
e wn j
g i
e
l l
'N s
l
/
l Y
UNITSilulDOWNS ANk) POWER REDUCI10NS DOCKET NO.
50-348 UNIT N AM E J., M.
Farlev-Unit 1 DA1E 1/01/82 D
COMI't.ETED BY W.G.
liairston, III REPORT MONTil ecember,1981 TEl.EPlf0NE (205) 899-5Db "L.
's = E 5
c c.
.2 8
.g 5 g 1.icensee E v,,
gn e
Cause & Corrective o
No.
Date g
Eg
,, g oc Event
- r. T q
Action to syd u
b 3
5 ji$g Report #
Pscvent Recuirence 6
025 811201 F
744 A
3 N/A EB CENERA Cone.inued outage to repair damage to the main generator which occurred September 10, 1981.
~
l 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A fquipment Failure (Explain)
- 1. Manual fin Preparat!on of Data B-Maintenance or Test 24fanual Scram.
Entry Sheets for t.icensee C Refueling 3 Automatic Scram.
Event Report (l.ER) File (NUREG.
D Regulatoiy Restriction 4 Other (Explain) 01611 E-Ope ator Training & ticense Examination 1
F Administrative 5
G-Opesational Esrur (Explain)
Exhibit 1 - Same Source (9/77) 11 Other (Explain) 1
-