Forwards Monthly Operating Rept for Dec 1981
ML20039G736
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/11/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC
Shared Package
ML20039G737 List:
References
NUDOCS 8201190067
Download: ML20039G736 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

e g

M:lling Addr:m Alabama Power Campany 600 Nortn 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Te'eohone 205 783-6081 F. L C W'on, Jr.

Senio... Dresident Alabama Power Flintric.

+ng it'e southen elecinc system January 11, 1982 Docket No. 50-348 4?

A a

RECE!tign "

Director, Office cf Management

. b g

8 /0g O Ir.fornation and Program Control I

g U. S. Nuclear Regulatory Co= mission Washington, D.C.

20555 g

p

Dear Sir:

s

/f RE: Joseph M. Farley Nuclear Plant Menthly Operating Data Report Unit No. 1 Attached are two (2) copies of th'e December, 1981 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Spccifications. As requested by letter f rom Mr. John F. Stolz to }k. Alan R. Barton, dated October 21, 1977, a " Narrative Su= mary of Operating Experience" is included in the attached repert.

If you have any questions, please advise.

Yours very truly,

'l s

y / <

i s

.3 a

< : c. i

<. 1, -,

F. L'." Clayton, Jr.

j

~

i FLCJr/KD1:bhj Attachments cc:

Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) s, 'I

$%8Te8fS$8@H R

,g c.

JOSEPH ?!. FARLEY NUC. EAR PLANT UNil' 1 NARRATIVE SLWL\\RY OY OPERATIONS DECEMBER, 1981 The unit continued to be shutdown through the month of December for repair of the main generator and Cycle 3 - Cycle 4 refueling operations.

The following safety-related maintenance was performed in the month of December:

1. Performed miscellaneous maintenance on diesel generators.
2. Performed various design changes required by NUREG-0737 and NUREG-0588.

STEAM GENERATOR TUBE PLUGGING Past experience at FNP indicates the majority of k'estinghouse steam generator tube leaks occur on the steam generator inner row tubes. Therefore, a management decision was made to plug all the inner row tubes of the three Unit 1 steam generators to prevent unplanned outages in th2 future.

Date of Plugging: 12/15/81 All S/G IC inner row tubes were plugged with the exception of the following inner row tubes which were previously plugged.

Row Column 1

27 1

38 1

39 Date of Plugging: 12/16/81 All S/G 1B inner row tubes were plugged with the exception of the following inner row tubes which were previously plugged.

Row Column 1

8 1

11 1

19 1

29 1

51 Date of Plugging: 12/17/81 All 94 S/G 1A inner row tubes were plugged.

I