,____________ _ _______

SUMMARY

OF PLANT OPERATIONS 12/1 0256 Began RCS heatup.

1540 RCS at hbt shutdown.

2327 Reactor critical.

12/3 1310 Began increasing reactor power.

2310 Paralled unit to the system and closed the OCBs.

12/4 0126 Reactor at 50% power.

0228 Reactor trip due to main generator trip.

0557 Reactor startup in progress.

0635 Reactor critical.

0931 Reactor at 3t power.

1231 Began increasing reactor power.

1340 Paralled unit to the system and closed the OCBs.

12/5 0500 Reactor at 37% power--began 5-hour hold.

1000 Holding at 87% power due to turbine vibration.

12/6 0834 Began increasing reactor acwer.

1500 Reactor at 100% power.

l 12/7 to 12/24 Continued routine operation at 100% power.

j 12/25 0425 Began to reduce power about 100 MW per dispatcher request.

j 0534 Reactor at 90% power and holding, j

12/26 0304 Began to reduce power another 100 MW per dispatcher request.

0422 Reactor at 80% power.

12/28 Oh30 Began increasing power.

0526 Reactor at 87% power--began 2-hour hold.

j 0731 increasing reactor power to 100%.

I 12/29 to 12/31

{

Continued routine operation at 100% power.

I

SUMMARY

OF CHANGES IN ACCORDANCE WITH 10 CFR 50.59(b) 1.

Established the proper settings for oversoltage relays for busses 4A and 4B.

Disconnected the uncerfrequency relays for these busses.

1 2.

Analyzed effget of slight rise in concrete temperatures above design l

value of 200 F.

The maximum temperature measured was 208 F.

3 Provided a method and device to " Blank-off" an empty SPND Guide Tube into the RCS.

Blank is similar to existing SPND closure fitting in both mechanical and physical properties.

Its failure would be no di f ferent than that which would result from the failure of any SPND closure.

4.

Installed microwave intrusion alarms in place of the perimeter fence vibration sensors, established a new perimeter fence alignment, changed the profile of an existing section of perineter fence, and modified the employee parking lot.

5 Converted the Rancho Seco-Rio Oso and Rancho Seco-Lockford 230 KV lines to the Rancho Seco-Hedge I ano 2 lines. The line changes do not affect the line terminations at Rancho Seco, nor is the load capacity of the transmission lines affected. There is no reduction in redundancy of incoming power.

8201190061 820112

{DRADOCK 05000312 PDR

SUMMARY

OF CHANGES IN ACCORCANCE WITH 10 CFR 50.59(b)

(Continued) 6.

Replaced Barnebey-Cheney type 727 charcoal with an imprc /ed performance co-impregnated charcoal.

7 Evaluated fuei handling accident, assuming spent fuel building exhaust filters are providing less than the expected DF cT 10.

The proposed operation will not increase the probability of occurrence or the vansequence of a fuel handling acc3 dent in the spent fuel building, providing 12 to 35 days are alloweu between shutdown and start of fuel shuffle. The margin of safety will remain conservative and similar to that implied in the FSAR analysis. ALARA and 10 CFR 50, Appendix I requirements will continue to be met.

PERSONNEL CHANGES REQUIRyJG REPORTING No personnel changes that requi re reporting in accordance wi th Tecnnical Specification Figure 6.2-2 were made in December 1981.

MAJOR ITEMS OF SAFETY RELATED MAINTENANCE 1.

Repl6ced mesh seal and casing gasket of boric acid pump.

2.

Retorqued OTSGs A and B manways and hand holes per procedure M.15 3

Replaced impelier shaf t and epper and lower shaf t bushings and thrust bearing of "3" DHS sump pump P-634.

4.

Replaced fuse and function tested C Inverter.

5 Replaced operato-lead screw of RB Emergency Ccoler A,c00C NSW outlet.

- - + -

e w

=%

1 REFUELING INFORMATION REQUEST 1.

Name of Facility:

Rancho Seco Unit 1 2.

Scheduled date for next refueling shutdown:

September 1982 3.

Scheduled date for restart following refueling:

March 1983 4.

Technical Specification change or other license amendment required:

a) Change to Rod Index vs. Power Level Curve (TS 3.5.2) b) Change to Core Imbalance vs. Power Level Curve (TS 3.5.2) c) Tilt Limits (TS 3.5.2) 5.

Scheduled date(s) for submitting proposed licensing action:

July 1982 6.

Important licensing considerations associated with refueling:

None 7.

Number of fuel assemblies:

a) In the core:

177 b) In the Spent Fuel Pool:

196 8.

Present licensed spent fuel capacity:

5R 9.

Projected date of the last refueling that can be discharged to the Spent Fuel Pool:

1987

)

_m_______._m

4 OPERATING DATA REPORT DOCKET NO.

50-312 DATE 81-12-31 COMPLETED BY R. Colombo TELEPHONE fo16) ac2-3211 OPERATING STATUS i

Notes 1, IJnjg Nat. e:

Rancho Seco Unit 1

2. Reporting Per:od:

December 1981

3. Licensed Thermal Power v31'stn 2772
4. Nameplate RatingCrn3s 314er 963
5. Desiga Electrical R tinpNet 31M L 918
6. Maximum Dependable Capacity # Gross 31We):

917

7. Stan:num Dependable Capawy (Net 3! Wet 873 i

i

8. If Changes Occur in Capacity Ratings litems Number 3 Throu;h 7) Since Last Report. Gise Reasons:

N/A

9. Power Lese! To which Restr:eted,If Any (Net 31We):

N/A

10. Reasons Fer Restrictions.If An.v:

N/A This Stonth Yr.-to.Date Cumulative

!!. Hours In Reporting Period 744 8,760 58,801

12. Number Of Hours Reactor has Critical 716.4 3.740.4 35,236.6

=

13. Reseror Resene Sht.tdown Hours 23.5 1,989 6,458.6
14. !!aurs Generator On Line 661.7 3.524.8 33.770.4
15. Unit Resene Shutdown Hours 0

0 1.210.2

16. Gross Thermal Energy Generated (5thli) 1.772.519 8.922,857 85,895,112
17. Gross Electrical Energy Generated t.\\lhilt 906.021 2.807.715 28.755.429
18. Net Electrica! Energy Generated )lbli) 961.081 2.610.992 27.157.117
19. Unit Senice Factor 88.9 40.2 57.4
20. Ur.it Avai! ability Factor 88.9 40.2 59.5
21. Ur.it Capacity Factor a L* sing SIDC Nett 86.8 14.4 52.9
22. Unit Caracity Faetor(Uning DER Net, 82.6 32.7 50.3
23. Unit forced Outage Rate 11.1 44.8 31.1 i

b4. Shutdowns Scheduled Oser Nest 6 Stonths Ty pe. Date.anj !)eration of Each n January 10--one dav

25. If Shur Down.\\t End Of Report Pericd. [3timateJ Date of Startup:

N/A

26. Unit. In Test StatuuPrior to Commerefat 0peratiimt Forecast Achiesed INITIA L CRl!!C \\ LITY N/A N/A INITIAL ELECTRICITT N/A N/A C0\\lilERCI \\L OliR.\\T10N N/A N/A (u/771

~

j AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-312 I

UNIT Rancho Seco Unit 1 DATE 81-12-11 R. Colornbo COMPLETED BY 4

TELEPHONE (916) 452-3211 r

[

i i

[

MONTH December 1981 DAY AVERAGE E e.lLY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL iMWe-Net) iMWe Net) 1 0

906 g7 2

0 is 899 3

0 899 39 5

3 4

168 898

o S

770 902 i

862 907 6

22 907 7

905 23 g

905 904 6

24 9

902 25 825 l

10 90L 26 717 11 906 711 27 e

906 843 23 13 902 853 29 14 900 892 30 15 80';

3:

892 16 906 r

INSTRUCTIONS On this format. list the average daily unit power lesel in MWe Net for each day in the reporting nwnth. Compute to i

the nearest whole megawatt.

P3/77) i m

7-

O 50-312 DOCKE T NO_

UNIT Sil01 DOWNS AND POWER REDUCTIONS Rancho Seco Unit 1 UNIT N AME DATE 81-12-31 COMPLETED BY R Colombo RIPORI MON 111 Decernber 1981 7916) 452-3211 TELEPilONE 1

50

'e I icensee Et Cause & Corrective No.

Daic h

hj k

) ($[e h

f'3 Action to Event Prevent Recurrence Report #

u) U jI 5

3 ;g =g o

U e

C 14 81-12-01 F

71.1 D

1 N/A hiA TURBlH Continued shutdown for turbine balancing and repairs.

c ler Main generator tripped when H 15 81-12-04 F

11.2 A

3 N/A HJ VALVEX control valve failed closed. 2 16 81-12-26 S

0 F

4 H/A ZZ ZZZZZZ Power reduction per dispatcher request.

I I

2 3

4 F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A. Equipment Failure (Explain)

I Manual h,r Preparation of Data B-Maintenance oi Test 2-Manual Scra m.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event ReporI (El R) Fi-!c (MIREG-D-Regulatory Restriction 4-Osher (Explain) 0161)

E-Operator Training A license Examination F-Administrative 5

G Operational Error (Explain) 1:xhibit I Same Source i

('J/ 77)

Il-Olher (Explain)

I

- -