ML20039G586

From kanterella
Jump to navigation Jump to search
Forwards 9-month Response & Updated 6-month Response to NUREG-0612 Re Control of Heavy Loads.Changes for 6-month Rept Encl
ML20039G586
Person / Time
Site: Point Beach  
Issue date: 01/11/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20039G587 List:
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR NUDOCS 8201180464
Download: ML20039G586 (3)


Text

_

q l

I%SC00 Sin Electnc eoaca couesur 231 W. MICHIGAN P.O. BOX 2046. MitWAUKEE, W! 53201 January 11, 1982 Mr. H.

R.

Denton, Director p

Office of Nuclear Reactor Regulation A

U. S. NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 RECEIVED D

C-JAN115 ?9R2mJ Attention:

Mr.

D. G.

Eisenhut, Director T

E g gham Division of Licensing 3

Gentlemen:

N Y

DOCKET NOS. 50-266 AND 50-301 NUREG-0612 - CONTROL OF HEAVY LOADS AT NUCLEAR POWER PLANTS TRANSMITTAL OF NINE-MONTH RESPONSE AND UPDATED SIX-MONTH RESPONSE INFORMATION POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Your letters of December 22, 1980 and February 3, 1981 requested that Wisconsin Electric Power Company review the handling of heavy loads at Point Beach Nuclear Plant and provide information as requested in Enclosure 2 to the December 22, 1980 letter.

The enclosed report, " Response to NRC Request for Information on Control of Heavy Loads, Nine-Month Report", provides the requested information.

Modifications will be required to the existing interim load handling procedures in place at Point Beach as a result of the analyses performed in the preparation of the nine-month response.

It is expected that these modifications to the existing interim procedures will be in place by March 1, 1982 unless otherwise specified in the response.

We expect to be able to complete the equipment modifications that we have found necessary as a result of this review within two years.

Also enclosed is updated information which should be included in the report titled " Response to NRC Request for Information on Control of Heavy Loads, Six-Month Report".

This information should be included in your existing copies of the six-month report as indicated in the attached " Instructions for Page Change".

We will forward any outstanding information, as detailed in the six and nine-month responses, within the time frame specified in our responses. )I,0Sdi 8201180464 820111 PDR ADOCK 05000266 p

PDR

\\

l c

Mr. H. R. Denton January 11, 1982 Please contact us if you have any questions regarding this submittal.

Very trt ly yours,

-V

,).

/

y(CI Q,/

Assistant Vice President C. W.

Fay Enclosures Copy to NRC Resident Inspector Subscribed ar.d sworn to before me this ] d day of January 1982.

4%A W _ W2:sp Notary Pilblic, State of Wisconsin My Commission expires pd b/17'/.

v l

. - - _ _ - _ _ _ - _ _ _ _ _ - - _ - _ - - _ _ _ _ ~ _ - - _ _ _ _ _ __ - -.

Page Change Instructions For The Six Month Report Remove

_Jnsert Title Page Revised Title Page Section 4 Revised Section 4 Table 4-5 Table 4-5 Rev. 1 Table 4-6 Table 4-6 Rev. 1 Table 4-7 Table 4-7 Rev. 1 Table 4-9 Sheet 1 thru 3 Table 4-9 Rev. 1 Sheet 1 thru 3 Table 4-10 Table 4-10 Rev. 1 Table 4-12 Sheet 1 thru 3 Table 4-12 Rev. 1 Sheet 1-thru 3 Table 4-14 Table 4-14 Rev. 1 Table 4-16 Table 4-16 Rev. 1 Table 4-20 Sheet 1 thru 6 Table 4-20 Rev. 1 Sheet 1 thru 6 Table 4-22 Table 4-22 Rev. 1 Tabia 4-27 Table 4-27 Rev. 1 Table 4-28 Table 4-28 Rev. 1 Table 4-29 Sheet 1 thru 3 Table 4-29 Rev. 1 Sheet 1 thru 3 Table 4-35 Table 4-35 Rev. 1 Table 4-37 Table.4-37 Rev. 1 i

Table 4-38 Table 4-38 Rev. 1 Figure 4-1 thru 4-7 Figures 4-1 thru 4-30 O

125/29 l