lT e
.s CD&L Carolina Power & Light Company January 3, 1982
]
tn 4
D
\\
File: BC/A-4 Serial No.:
0\\82-045 q
Y DE927:.,
l
' -Q t
l
.u Q l e.~., O fgg2A[t- -
b Cn Office of Nuclear Reactor Regulation O
]4.q _ [- }M ATTN:
Mr. T. A. Ippolito, Chief.
r; Operating Reactors Branch No. 2
~
,y United States Nuclear Regulatory Commission y.' -
\\ g.'g, Washington, D.C.
20555 N
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 REQUEST FOR LICENSE AMENDMENT FACILITY STAFF QUALIFICATIONS
Dear Mr. Ippolito:
SUMMARY
In accordance with the Code of Federal Regulations, Title 10 Section 50.90 and Section 2.101, Carolina Power & Light Company (CP&L) hereby requests revisions to the Technical Specifications for the Brunswick Steam Electric Plant (BSEP) Unit Nos. 1 and 2.
The purpose of these changes is to allow Mr. Ronald C. Knobel to fill the position of Manager-Operations at Brunswick during an interim period in advance of his completion of the written NRC examination for Senior Reactor Operator (SRO), since NRC is unable te schedule an SRO examination for him until May, 1982.
Issuance of these temporary Technical Specifi-cations changes will enhance safe operations at Brunswick during this.
interim period.
BACKGROL3D Mr. Knobel is proceeding to complete all requiremento for SRO licensing at Brunswick while waiting for the written NRC examination.
The attached application dated October 13, 1981, requested NRC to schedule a written examination for Mr. Knobel in January,1982.
NRC's response l
to this request indicated that Mr. Knobel could not be scheduled for NRC examination until May,1982, due to the current becklog of pending examinations.
.1 Brunswick Technical Specifications 6.3.1 state that the " unit j [
staff shall meet... qualifications of ANSI N18.1-1971".
NRC has interpreted 4
this to require that the Brunswick Manager-Operations hold an SRO License. vJd[6MO Mr. Knobel has previously been certified as an SRO on the Dresden Plant; [ /(00.o0 has completed NRC examinations which were more extensive than the SRO examination as an instructor at the Morris, Illinois training facility; 8201180371 820
~ '
PDR ADOCM 05000324
- P. O. Box 1551
- Raleign, N. C. 27602 P
pp...
.::.. :. x ;. i x :.m o=
n.
d
U
^
/"'..
.Mr. T. A. Ippolito -January 8, 1982 is proceeding with SRO training at Brunswick (as described in the attached application) consistent with NRC's May, 1982 examination schedule; is a registered professional engineer in the State of California; was previously the General Electric Company representative at the BSEP site for sixteen (16) months (8/79 - 1/81) supervising response to TMI Action j
Items (refer to attached application); and has twenty-one (21) years of experience directly related to BWR Plant opcrations (refer to attached application).
CURRENT STATUS:
Mr. William Tucker is the Manager-Technical Support at Brunswick, and he holds an SRO License.
In addition to these responsibilities, Mr. Tucker is also rulfilling the license required responsibilities of the Manager-Operations. Based on Mr. Knobel's qualifications, it is clear that Mr. Knotal meets the intent of ANSI N18.1-1971 that the Manager-Operations hold an SRO License. Safe plant operations at BSEP would be enhanced if Mr. Knobel were to assume the full duties of Manager-Operations during the interim period until he completes the formal SRO examination as scheduled by the NRC.
This would also allow Mr. Tucker to return to full-time management of BSEP Technical Support.
4 ADMINISTRATIVE INFORMATION:
Enclosed you will find the revised Technical Specifications pages with the changes indicated by vertical lines in the margins.
In accordance with 10CFR170.22, we have determined that these changes are administrative in nature and thus constitute one Class I amendment and one Class II acendment. Accordingly, our check for $1,600.00 is enclosed.
We request that NRC expedite issuance of these Technical Specifications changes as much as possible. Your cooperation will be apprecisted.
Please contact my staff should you require any additional in formation.
Yours very truly, i
.h.
P. W. Howe Vice President Technical Services PWH/JM/lr (7274)
Attachments cc: Messrs. R. C. Lewis, Region II J. P. O'Reilly, Region II H. L. Thompson J. Van Vliet P. W. Howe, having been first duly sworn, did depose and say that the naGrsiff, *,,
information contained herein is true and correct to his own per A,,r knowledge or based upon inf ormation and belief.
'?.%
5 A (Seal)3
- IARPi E
{!( Usticj j Notary My commission expires: OcXo8ER y l9%