Public Version of Revision 1 to Emergency Plan Implementing Procedure, Technical Director. Revised Table of Contents Encl
ML20039G395
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/15/1981
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20039G378 List:
References
EPIP-130-1, NUDOCS 8201180147
Download: ML20039G395 (7)


Text

. -.. _ _

~...... _. _.. _ _.

m_.._-.__.:

6 TECHNICAL DIRECTCR EPIP 130-1 TABLE CF CONTENTS SECTION TITLE PAGE DATE REVISION Table of Contents 1

DEC 15 1991 1

A Purpose 2

DEC 15 198t 1

8 References C

Prerequisites D

Precautions E

Limitations and Actions l

F Procedure 3

DEC 15 1981 1

G Checklists H

Tech Spec References i

l l

Attachment A 4

DEC 15 1981 1

5 DEC 15 1981 1

6 CEC 15 1981 1

7 DEC 15 1981 1

l i

e l

\\

1 This procedure contains 7 pages.

8201180147 811236 O

DR ADOCK 05000

~

DAE/2 - /5'.-gj l

~ i

-. ~..

EPIP 130-1 Rev. 1 DEC is 1981

~

~

TEC m ICAL OIRECTOR A.

RJRFOSE The purpose of this procedure is to list the Technical Director's

ssponsibility during a GSEP emergency.

[

B.

REFERENCES 1.

GSEP 4.2-3 2.

EPIP 330-1 3.

EPIP 700-1 C.

PREREQUISITES l

None D.

PRECAUTIONS 1.

The position of the Technical Director will be established as follows: The Tech Staff supervisor or the Assistant Tech Staff Supervisor normally act as the Technical Director. In the absence of either the Tech Staff Supervisor or the Assistant Tech Staff Supervisor, the following Tech Staff Group Leaders will become the acting Technical Director until relieved by the Tech Staff Supervisor or his assistant.

2.

The Technical Director or acting technical Director normally works out of the TSC.

1 E.

LIMITATIONS AND ACTI0t6 None 1

t i

l l

I

\\

r I

0021E 2

-l i

l 0006A

-i i

l I

+

j

-. ~....

EPIP 130-1 Rev. 1 DEC15 bbl F.

FP.0GDURE 1.

The first Technical Director to arrive on-site reports to the Control Room (CR) to obtain status. (Attachment A) 2.

The second Technical Director to arrive on-site establishes communications between the TSC & Control Rcom GSEP communicator.

(Beige Phone) i 3.

Technical Directcr Assistants, Group Leaders, and Dedicated Comunications Assistants report to the TSC.

4.

Technical Group Leaders Assistants report to the OSC.

5.

Estao.'.ish CR-TSC phone link (Belge Phone) 6.

Make cn ertimate of the extent of the emergency and make recorreiendations to the Station Director.

7.

Keep the Station Director informed of the plant status and assist in emergency and restoration planning.

8.

Evaluate vital plant parameters using Attachment A where necessary to determine the overall condition of safety-related systems, the core, ard fission product barriers.

9.

Prepare required procedures in support of recovery cperations.

G.

CFECKLIST Attachment A H.

TECWICAL SPECIFICATION REFEREtCES None f

[

0021E 3

0006A

.......a EPIP 130-1 Rev. 1 DEC 15 1981 ATTAC}+4ENT A TECFNICAL DIRECTOR CHECKLIST Name of Director Title Initial Notification Date Time By Whom Event Start Time Event Classification:

Drill Transportation Accident Unusual Event Alert Site Emergency General Emergency INITIAL PLANT ASSESSMENT FORM Unit (circle one) 1 2

Date Time Cther Unit Status (circle one)

CSD, HSD, Refueling, Power Other 1.

Brief Statement of initial accident diagnosis as made by Shift Engineer (i.e. LOCA-large or small; S/G tube break etc.)

2.

Record plant parameters A.

Primary plant status 1.

Pressurizer level l

2.

Pressurizer pressure 3.

Locp wide range pressure 4.

Wide range T t

e 5.

Wide range Th 6.

Average Highest Incore Thermccouples 7.

Vessel level indicators 8.

Excore NI's SR IR 9.

T subccoled

10. S/G Secondary pressure I

OC21E A

0006A l

- - - - - -....... - -... -.. ~ - - - -

EPIP 130-1 ab*5 bl

11. RWST level or Recirculation Sump Level
12. Core flow mode (Check one) a.

Forced convection (RCP's) b.

Natural circulation c.

S.I. injection phase d.

S.I. recirculation mode

1. Cold leg recire
11. Hot and cold leg recirc B.

Heat Sink Status l.

One or more nonf aulted S/G's with feed flow being delivered by (check one) a.

Aux. Feed Pumps b.

Main Feed Pumps c.

Condensate Pumps d.

Heater Orain Pumps 2.

S.I. flow through a large enough break to remove decay heat.

Yes or No 3.

S/G level A I

B C

D C.

Containment Status 1.

Temperature

'2.

Pressure 3.

Humidity 4.

Radiation levels 5.

Isolation A or 8 6.

Containment Spray Activated (Yes or No) 7.

Reactor Ccntainment Fan Coolers In Service (circle one) 1 2

3 4

5 i

(

0021E 5

~

0006A

EPIP 130-1 Rev. 1 DEC 15 1981 D.

Procedure being used EOP.0 EOP-10 EOP-6 EOP-ll EDP-7 EDP-12 EOP-8 Other

[

EOP-9 E.

Electrical Status (check as appropriate) l.

Blackout 2.

Loss of DC power 3.

Loss of AC pow?r 4.

All ECCS ouses energized F.

Equipment Necessary for accident mitigation that is failed or damaged.

G.

Radiological Parameters Reacter Coolant Activity ( or isotopic analysis)

Time Activity Containment Atmosphere Activity ( or isotopic analysis)

Time Activity Radiation Monitor Readings Containment RE00ll RE0012 Time Activity Reactor Coolant RTPR18 RTPR27 Time Activity

~

i 0021E 6

0006A

.. a

.a EPIP 130-1 Rev. 1 DEC 15 1961 Auxiliary Building RTPR25 RE0014

~

Time Activity Secondary Plant RE0013 RE0015 Time Activity ORTPR25 (Firesump)

RTPR26 Time

~

Activity 4

4 l

[

FINAL THE 7

(

0006A 1

,