ML20039G115

From kanterella
Jump to navigation Jump to search
Corrections to Transcript of F Rinaldi,P Hadala & J Matra Testimony.Certificate of Svc Encl
ML20039G115
Person / Time
Site: Midland
Issue date: 01/12/1982
From: Blume M
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8201150300
Download: ML20039G115 (7)


Text

.

l *'

9 4

gggsWED' 9

t JAN 111982* I s W uu88'm'u"a O 01/12/82 som sam g

'/

UNITED STATES OF A!! ERICA FG HllCLEAR REGULATORY C0tif1ISSION BEFORE THE AT0tilC SAFETY AND LICENSING BOARD

/,

~

'In the !!atter of

)

)

CONSultERS POWER C0f1PANY

)

Docket flos. 50-329 ott & OL

)

50-330 Olt & OL (liidland Plant, Units 1 and !)

)

.,8 CORRECTIONS IN TRANSCRIPT OF TESTIt10 fly OF FRANK RINALDI, PAUL HADALA AND JOHN f1ATRA Date Page No.

Line Requested Correction 10/15/81 5084 11 Delete "a" af ter " upper" 5084 12 Change "substantially" to

" substantial" 5085 3

Change " intervals" to "intergral s"

~ :.

~'.

5085 4

Add "," after "is" 5095 23 Change " derive" to "and drive" 5085 24 Add "we" after "that"

.~

5086 19 Change "in" to "and"

~

tj, j

5088 19 Change "danp" to "danped"

/

'e 5090 1

Change first "the" to "one" j

m 3

Change " bounded" to "a bound"

, L'_,

5000

^

5094 3

Add "nodel" after "mthematical" l

5694 20 Change "Y to "are"

/

. 5098 18 Change " shake" to " SHAKE"

./

  • 17 sj 5098.

22 Change " shake" to " SHAKE" j

/'

/

/

/ DESIGilATED ORIGINAI) {

A JG

~

gg py g

'a l

v e

a

\\-

e 2-7 a,

s N

. ~

.2' 5102 17 '

Add "or" after " acceleration"

, 3,_

t 5102. -

22 Change " varied" to " buried" s,

s

'5104 11 Add " answer" after "certainly" p

1

'5116 8

Change " confident" to " competent" x

1 1

12/03/81 5952

'13 Change "3.8a," to "3.8.4,"

5952

' 15 Change "37" to "3.7" 5952 17 Change " crack" to " cracked" 9

5953 20 Change "not concerned" to "not a concern"

~-

5960 4

Change "A."

to "O."

5960 5

Change "0."

to "A."

s s; e 5930

-6 Add "Q." before "The" 4'

5963~

3 Change " analysis" to " analyses"

[

5967 13 Change the second "the" to "that" h~ -

~-

5973 16 Change " consulting" to

" consultant's" x

12/14/81 6129

'll2 First three words should read

~~

" checked, in detail,"

6129 24 Change "effect of" to

^

" effective"; change " contents" to

" constants"

~~

6130 7

Delete " shear" 6130 8

Delete first " wave" h1 6130 12-Add "I" after "then" 6130 13 Change " Feed" to " Seed"; change "Idrous" to "Idriss" 8

Chance " safe ball stic"

~

6131

.' " ~

to " safeguard ballistic" 6131 11 Change "aerevations," to

" derivations"

+

.Y i s y

A y

=,

ew

+rwsp-

,p.

,=,,,p,,,w,~

wen,

,we-

- +

~v v

. - + ~

e-g

~ - - - - - --

e' new'-

-en-=-

w

. 12/14/81 6131 12 Change " modula" to "noduli" 6131 14 Change "or" to "and" 6132 3

Change "this" to "these" 6132 4

Change "nodel" to "models" in both places -

6132 20 Add "a" after " prepared" 6133 3

Change "the Consuner and" to

" Consumers" 6133 11 Change "it" to "we have" 6133 18 Change "to" to "fron" 6133 19 Add "," after "disagreenent";

Change "this" to "these"; and change " reservation" to

" reservations" 6134 8

Change " approach" to " approaches" 6134 9

Pelete "there" 6135 17 Change "Hadal," to "Hadala,"

12/15/81 6258 21 relete " discarded" 6258 23 Delete " performance design" 6258 25 Change "according" to "accordingly" 6260 16 Change " buildings," to

" building,"

6261 1

Change " corrected" to

" corrective" 6263 12 Change "the, that" to "the" 6264 14 Change "pinnts." to " plants."

6265 10 Change " overloads" to "other loads" 6265 11 Change " flexions to

" deflections"

_... ~. - -. _ _, _ _. - _. _. - _. _. - _..

. 12/15/81 6265 15 Change "nodel. " to "nodel s."

6266 10 Change " connection" to

" connections" t

6266 13 Change "ganut" to " shape" i-6267 12 Change "filanent theory." to

~

" fill naterial."

6267 13 Change "filanent" to " fill naterial."

6267 14 nelete "thcory."

6272 12 Change "filanent" to " fill" 6274 9

Change "this load." to "these loads."

6276 7

Change "the building" to "the diesel building" 6276 10 Change "that structure." to "those structures.

6277 6

Change " occurred" to " occurs" 6277 7

Change "notiels" to " nodes";

i change " structure." to

" structures."

6278 7

Add "fron" before "one" 6280 9

Delete "and borated -- service water" J

6281 19 Change "being" to "between" 6281 20 Change "renaining" to "renainder" 6282 25 Charge " include" to " including" 6283 1

Change " site -- the" to " site specific" 6283 15 Change "Bechtel" to "Rechtel's" 6285 22 Change " concerns" to "cencern";

change "these" to."the"

_ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ 12/15/81 6285 24 Delete "of" 6286 1

Change "model." to "nodels."

itichael B. Blune Counsel for NRC Staff Dated at Bethesda,fiaryland this 12th day of January, 1982

UNITED STATES OF AMERICA NUCLEAR REGULATORY C0ft11SSION BEFORE THE ATOMIC SAFE _TY AND LICENSING BOARD In the Matter of CONSUMERS POWER COMPANt' Docket Nos. 50-329 Oti & OL 50-330 OM & OL (MidlandPlant, Units 1and2)

CERTIFICATE OF SERVICE I hereby certify that copies of " CORRECTIONS IN TRANSCRIPT OF TESTIMONY OF FRANK RINALDI, PAUL HA0ALA AND JOHN MATRA" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, or, as indicated by an asterisk through deposit in the Nuclear Regulatory Commission's internal mail system, this 12th day of January,1982:

  • Charles Bechhoefer, Esq.

Frank J. Kelley Administrative Judge Attorney General of the State Atomic Safety and Licensing Board of Michigan U.S. Nuclear Regulatory Commission Steward H. Freeman Washington, D.C.

20555 Assistant Attorney General Environmental Protection Division Ralph S. Decker 525 W. Ottawa St., 720 Law Bldg.

Administrative Judge Lansing, Michigan 48913 Route r!4, Box 1900 Cambridge, Maryland 21613 Ms. Mary Sinclair i

5711 Summerset Street Dr. Frederick P. Cowan Midland,111chigan 48640 Administrative Judge l

6152 N. Verde Trail Michael I. Miller, Esq.

Apt. B-125 Ronald G. Zamarin, Esq.

i Boca Raton, Florida 33433 Alan S. Farnell, Esq.

Isham, Lincoln & Beale l

  • Dr. Jerry Harbour One First National Plaza Administrative Judge 42nd Floor l

Atomic Safety and Licensing Board Chicago, Illiricis 60603 l

U.S. Nuc1 car Regulatory Commission l

Washington, D.C.

20555 James E. Brunner, Esq.

l Consumers Power Company

[

Myron M. Cherry, Esq.

212 West Michigan Avenue l

1 IBM Plaza Jackson, Michigan 49201 Chicago, Illinois 60611 i

I L

t tis. Barbara Stamiris

  • Atomic Safety and Licensing Board 5795 fl. River U.S. Nuclear Regulatory Commission Freeland, Michigan 48623 Washington, D.C.

20555 James R. Kates

  • Atomic Safety and Licensing Appeal 203 S. Washington Avenue Panel Saginaw, litchigan 48605 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Wendell H. liarshall, Vice President Midwest Environmental Protection

  • Docketing and Service Section Associates Office of the Secretary RFD 10 U.S. Nuclear Pegulatory Conmission Midland, Michigan 48640 Washington, D.C.

20555 Jeann Lirisley Steve J. Gadler, P.E.

Bay City Times 2120 Carter Avenue 311 Fifth Street St. Paul, MN 55108 Bay City,Ilichigan 48706 Paul C. Rau Midland Daily News 124 !!cDonald Street Midland,!!ichigan 48640 Michael B. Blume Counsel for NRC Staff l

l